- Reference docs: known issues, user journey, location redesign, mission merge plan - Scripts: fill_location_state, merge_missions, migrate_location, migrate_state - Tests: e2e test suite, asset entries unit tests - Demo: location board, hifi prototypes, test screenshots - Data backup: asset log entries and state nodes - Update .gitignore Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
233 lines
47 KiB
CSV
233 lines
47 KiB
CSV
asset|id|kind|title|mission|start|end|state|location|summary|note
|
|
Europa Outpost|bf68c161-7303-44da-bf6e-72373d2e54d5|state|EOCM-1 Outpost Deployment|Europa Outpost Construction Mission 1|2057-02-27 08:00:00+08:00|2057-03-15 09:00:00+08:00|Outpost Construction|Europa Outpost|The first crewed Europa construction campaign assembled the initial habitat, power spine, and life-support core.|Backfilled from ST-01 EOCM-1 support logs.
|
|
Europa Outpost|53ee9bf9-27c3-47c2-94f3-656a8eea64f2|event|Enter into Service|Europa Outpost Construction Mission 1|2057-03-15 09:00:00+08:00|||Europa Outpost|Europa Outpost entered operational service after the initial construction stack passed habitability review.|User-provided milestone, consistent with ST-01 EOCM-1 operation window.
|
|
Europa Outpost|6ffeda07-93fb-4d17-9efc-817555771d35|state|EOCM-1 Initial Outpost Operations|Europa Outpost Construction Mission 1|2057-03-15 09:00:00+08:00|2057-10-01 08:00:00+08:00|Outpost Commissioning|Europa Outpost|The outpost remained crewed while the first construction team brought core systems to sustained operational readiness.|Backfilled from ST-01 EOCM-1 support logs.
|
|
Europa Outpost|d548ded1-232d-4e68-875b-290092c7c0b8|state|Autonomous Standby|Europa Outpost Construction Mission 1|2057-10-01 08:00:00+08:00|2058-01-19 08:00:00+08:00|Autonomous Standby|Europa Outpost|After the first construction crew departed, Europa Outpost stayed in autonomous survival mode while awaiting the second construction mission.|Bridging interval inferred from EOCM-1 return and EOCM-2 arrival windows.
|
|
Europa Outpost|83dcded1-c57c-49c8-b94b-5430c2fe4d4d|state|EOCM-2 Outpost Expansion|Europa Outpost Construction Mission 2|2058-01-19 08:00:00+08:00|2058-09-06 08:00:00+08:00|Outpost Construction|Europa Outpost|The second construction campaign expanded the habitat ring, utility corridors, and long-duration expedition support spaces.|Backfilled from ST-02 EOCM-2 support logs.
|
|
Europa Outpost|50c4b9a3-644d-4dd6-85c7-cd40f1d32667|state|Post-Construction Readiness|Europa Outpost Construction Mission 2|2058-09-06 08:00:00+08:00|2058-09-25 08:00:00+08:00|Autonomous Standby|Europa Outpost|Europa Outpost remained uncrewed briefly after Construction Mission 2 while final expedition supplies were staged.|Bridging interval inferred from ST-02 EOCM-2 departure and XH-01 EE-1 arrival.
|
|
Europa Outpost|188eb0ca-df35-4644-92d3-6952bae3dbe8|event|Europa Expedition 1 Arrived|Europa Expedition 1|2058-09-25 10:00:00+08:00|||Europa Outpost|Europa Expedition 1 docked at the outpost and began the first standard long-duration occupation cycle.|Backfilled from XH-01 EE-1 support logs.
|
|
Europa Outpost|f034826a-77fc-4070-84a6-0f419d0910bb|state|EE-1 Surface Operations|Europa Expedition 1|2058-09-25 10:00:00+08:00|2059-06-25 08:30:00+08:00|Surface Expedition|Europa Outpost|Europa Expedition 1 occupied the outpost and supported early Jupiter system science operations based from Europa.|Backfilled from XH-01 EE-1 Jupiter System Operations.
|
|
Europa Outpost|a5da1a52-0c59-423a-b41e-2e646783bb67|event|Europa Expedition 2 Arrived|Europa Expedition 2|2059-06-25 08:30:00+08:00|||Europa Outpost|Europa Expedition 2 arrived via ST-02 Kristen with 12 crew and 1 Echo Shuttle Block 1.|User-provided crew manifest and arrival vehicle; consistent with ST-02 EE-2 arrival window.
|
|
Europa Outpost|f17eb842-8870-431d-9280-1b5fde97b48b|state|EE-1/EE-2 Crew Handoff|Europa Expedition 1; Europa Expedition 2|2059-06-25 08:30:00+08:00|2059-06-25 16:00:00+08:00|Crew Handoff; Surface Expedition|Europa Outpost|Europa Expedition 2 overlapped with Expedition 1 during crew transfer, cargo sorting, and outpost handover.|Outpost-level handoff interval inferred from same-day EE-2 arrival and EE-1 departure notes.
|
|
Europa Outpost|a51cd5a1-3ef1-430a-87f7-71ce9db44714|state|EE-2 Surface Operations|Europa Expedition 2|2059-06-25 16:00:00+08:00|2060-05-03 09:00:00+08:00|Surface Expedition|Europa Outpost|Europa Expedition 2 assumed continuous occupation of the outpost after the first crew rotation completed.|Backfilled from ST-02 EE-2 support logs.
|
|
Europa Outpost|906f6248-fd84-4211-a0eb-74c39e59ce86|event|Europa Expedition 1 Departed|Europa Expedition 1|2059-06-25 16:00:00+08:00|||Europa Outpost|Europa Expedition 1 departed the outpost via Xihe Station with 9 crew and 1 Callisto MPV Block 1.|User-provided departure note; treated as outpost departure milestone within XH-01 EE-1 broader return window.
|
|
Europa Outpost|15f8aae6-45f8-43d9-a3d6-9a2585ddeed2|event|Expansion Module Arrived|Europa Outpost Expansion Mission; Europa Expedition 2|2060-05-03 11:00:00+08:00|||Europa Outpost|The Europa Outpost expansion module arrived while Expedition 2 remained on station.|User-provided date; consistent with Solar Shuttle 2 expansion delivery window at Europa.
|
|
Europa Outpost|82509df3-ad30-483f-a0f7-b05ff4497435|state|EE-2 Operations with Expansion Module Integration|Europa Expedition 2; Europa Outpost Expansion Mission|2060-05-03 11:00:00+08:00|2060-06-23 09:00:00+08:00|Surface Expedition; Outpost Expansion|Europa Outpost|Europa Expedition 2 supported installation and activation of the new expansion module after it reached the outpost.|Backfilled from Solar Shuttle 2 expansion delivery and ST-02 EE-2 operation windows.
|
|
Europa Outpost|db70ac3b-1035-4066-8e74-928e656bc39a|state|EE-2/EE-3 Crew Handoff|Europa Expedition 2; Europa Expedition 3|2060-06-23 09:00:00+08:00|2060-06-24 15:00:00+08:00|Crew Handoff; Surface Expedition|Europa Outpost|Europa Expedition 3 overlapped with Expedition 2 during crew turnover and transfer of outpost responsibility.|Outpost-level handoff interval inferred from user-provided EE-3 arrival and EE-2 departure dates.
|
|
Europa Outpost|d7a1d501-ed5f-4065-a773-aa4ef101dede|event|Europa Expedition 3 Arrived|Europa Expedition 3|2060-06-23 09:00:00+08:00|||Europa Outpost|Europa Expedition 3 arrived via XH-01 to begin the next outpost rotation.|User-provided arrival date; treated as outpost arrival milestone within XH-01 EE-3 Jupiter System Operations.
|
|
Europa Outpost|8649cb17-0bcb-4ba4-9f91-e9c441ff9793|event|Europa Expedition 2 Departed|Europa Expedition 2|2060-06-24 15:00:00+08:00|||Europa Outpost|Europa Expedition 2 departed the outpost via ST-02 Kristen after completing crew handoff to Expedition 3.|User-provided departure date; treated as outpost departure milestone slightly ahead of ST-02 EE-2 system departure.
|
|
Europa Outpost|a7c9d010-5aed-43fc-a744-1a86ad9b15c8|state|EE-3 Surface Operations|Europa Expedition 3|2060-06-24 15:00:00+08:00||Surface Expedition|Europa Outpost|Europa Expedition 3 is the current resident crew. Crew status on 2060-06-24: 6 scientists at Lab, 2 medical at center hub, 1 commander and 1 pilot at observation station, 2 engineers at greenhouse.|User-provided current crew distribution for 2060-06-24.
|
|
JW-01 金乌一号|5df95fe3-5f0d-4dc1-ad37-508adcf2eef2|state|Construction||2058-03-14 16:00:00+08:00|2059-03-08 08:00:00+08:00|Construction|Star Port|Solar Shuttle 1 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
JW-01 金乌一号|e306c665-07c0-46dc-8127-b96775d616b9|state|Assembly Complete||2059-03-08 08:00:00+08:00|2059-04-13 08:00:00+08:00|Assembly Complete|LEO|Assembly complete, preparing for commissioning|Timeline.xlsx inferred monthly phase. Raw: Assembly Complete
|
|
JW-01 金乌一号|543dabdc-e61b-4a1c-8c4b-3e753d17cbbd|state|Trial Run||2059-04-13 08:00:00+08:00|2059-08-06 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
JW-01 金乌一号|b99062ea-4547-4cdc-8bf1-3b1f0c28a4be|state|Mars One Expansion Outbound|Mars One Expansion|2059-08-06 08:00:00+08:00|2059-10-24 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer|Timeline.xlsx inferred monthly phase. Raw: Earth-Mars
|
|
JW-01 金乌一号|30930d1b-d32b-4ef6-97ae-6d11c777ad53|state|Mars One Expansion|Mars One Expansion|2059-10-19 08:00:00+08:00|2060-08-09 05:10:00+08:00|Base Expansion|Mars|Mars One Expansion|Timeline.xlsx inferred monthly phase. Raw: Mars One Expansion
|
|
JW-01 金乌一号|00c8b5c6-e363-4aee-a768-2fc3fa7a0138|state|Mars Return|Mars One Expansion|2060-08-09 05:10:00+08:00|2060-10-26 10:03:00+08:00|Transfer|Sun|Back to Earth with Qingtian|Carrying Mars One component back
|
|
Mars One Base|97b3a860-03c6-4ca3-a9c8-f94fd05adbe0|event|Initial Cargo Landed|Mars Mission Demo|2054-08-23 10:30:00+08:00|||Mars One Base|Cargo from Mars Mission Demo was landed at the future Mars One site for robotic setup.|Backfilled from XH-01 Mars Mission Demo support logs.
|
|
Mars One Base|dc082672-52a2-4142-a2b8-737991ee542f|state|MMD Surface Activation|Mars Mission Demo|2054-08-23 12:00:00+08:00|2055-07-30 08:00:00+08:00|Surface Activation|Mars One Base|Robotic systems activated the first surface power, comms, and cargo handling stack delivered by Mars Mission Demo.|Backfilled from XH-01 Mars Mission Demo support logs.
|
|
Mars One Base|3141e93d-1e47-4264-864b-378815d8e871|event|First Crewed Landing|Mars One Base Construction Mission 1|2055-07-30 09:30:00+08:00|||Mars One Base|The first crewed Mars One construction team landed and began surface assembly.|Backfilled from XH-01 MOCM-1 support logs.
|
|
Mars One Base|9399f5f6-9412-455f-8683-b237bcdeab7b|state|MOCM-1 Initial Construction|Mars One Base Construction Mission 1|2055-07-30 10:00:00+08:00|2056-02-07 08:00:00+08:00|Base Construction|Mars One Base|The first crewed construction campaign assembled the core habitat, power systems, and ascent support infrastructure.|Backfilled from XH-01 MOCM-1 support logs.
|
|
Mars One Base|afe0f5fe-6909-4351-8003-b3f78e9145d1|state|MOCM-1 Autonomous Commissioning|Mars One Base Construction Mission 1|2056-02-07 08:00:00+08:00|2056-07-03 08:00:00+08:00|Autonomous Standby|Mars One Base|After the first construction crew departed, the outpost remained in autonomous checkout ahead of the next build window.|Bridging interval inferred from the first and second Mars One construction campaigns.
|
|
Mars One Base|0fd356d5-71ce-4219-a7fd-b9ff077f4f39|state|MOCM-2 Base Construction|Mars One Construction Mission 2|2056-07-03 08:00:00+08:00|2056-09-15 08:00:00+08:00|Base Construction|Mars One Base|Mission 2 expanded the surface habitat and continued utility trenching and storage build-out.|Backfilled from ST-01 MOCM-2 support logs.
|
|
Mars One Base|d96bd772-45eb-4010-96c2-1c942f4efc96|state|MOCM-2/MOCM-3 Crew Handoff|Mars One Construction Mission 2; Mars One Base Construction Mission 3|2056-09-15 08:00:00+08:00|2056-10-12 08:00:00+08:00|Base Construction; Crew Handoff|Mars One Base|Construction Mission 3 arrived before Mission 2 departed, enabling the first on-surface Mars One crew handoff.|Backfilled from ST-01 MOCM-2 and XH-01 MOCM-3 support logs.
|
|
Mars One Base|a05e86bb-77e5-4b99-a7d2-16a1dc810150|state|MOCM-3 Base Construction|Mars One Base Construction Mission 3|2056-10-12 08:00:00+08:00|2056-11-19 08:00:00+08:00|Base Construction|Mars One Base|The third construction campaign completed surface integration and prepared the outpost for continuous expedition occupancy.|Backfilled from XH-01 MOCM-3 support logs.
|
|
Mars One Base|2b0a2dbf-3f28-449e-af86-75ebf87b408e|state|MOCM-3 and ME-1 Surface Operations|Mars One Base Construction Mission 3; Mars Expedition 1|2056-11-19 08:00:00+08:00|2057-02-12 08:00:00+08:00|Base Construction; Surface Expedition|Mars One Base|Final construction work continued while Mars Expedition 1 began long-duration surface operations from the outpost.|Overlap inferred from XH-01 MOCM-3 and ST-02 ME-1 support logs.
|
|
Mars One Base|edfbaea5-331b-4a93-9458-044d3016eb7f|event|Phase 1 Construction Complete|Mars One Base Construction Mission 3; Mars Expedition 1|2057-02-12 09:00:00+08:00|||Mars One Base|Mars One entered sustained expedition service after the third construction wave wrapped up.|Completion milestone inferred from XH-01 MOCM-3 return window.
|
|
Mars One Base|e8003196-d035-49be-a721-144fec91a678|state|ME-1 Surface Operations|Mars Expedition 1|2057-02-12 09:00:00+08:00|2057-06-22 08:00:00+08:00|Surface Expedition|Mars One Base|Mars Expedition 1 operated the newly completed outpost and stabilized its life-support and logistics cadence.|Backfilled from ST-02 ME-1 support logs.
|
|
Mars One Base|fb511ee5-3343-4884-a094-59241d1d28e0|state|ME-1/ME-2 Crew Handoff|Mars Expedition 1; Mars Expedition 2|2057-06-22 08:00:00+08:00|2057-09-08 08:00:00+08:00|Surface Expedition; Crew Handoff|Mars One Base|Mars Expedition 2 arrived while Expedition 1 completed return preparations, overlapping on the surface during handoff.|Overlap inferred from ST-02 ME-1 and XH-01 ME-2 support logs.
|
|
Mars One Base|5109f226-b843-4173-97cf-bb3b740927ed|state|ME-2 Surface Operations|Mars Expedition 2|2057-09-08 08:00:00+08:00|2058-04-17 08:00:00+08:00|Surface Expedition|Mars One Base|Mars Expedition 2 took over continuous surface operations after the Expedition 1 crew departed.|Backfilled from XH-01 ME-2 support logs.
|
|
Mars One Base|9c4ef55d-a472-4e19-b582-8f872e6c854a|state|ME-2/ME-3 Crew Handoff|Mars Expedition 2; Mars Expedition 3|2058-04-17 08:00:00+08:00|2058-04-18 08:00:00+08:00|Surface Expedition; Crew Handoff|Mars One Base|Mars Expedition 3 overlapped briefly with Expedition 2 during the next surface crew handoff.|Overlap inferred from XH-01 ME-2 return and XH-02 ME-3 arrival timing.
|
|
Mars One Base|66d8bc17-70e4-4c18-9c00-a8a2ffb4c1d3|state|ME-3 Surface Operations|Mars Expedition 3|2058-04-18 08:00:00+08:00|2059-10-19 08:00:00+08:00|Surface Expedition|Mars One Base|Mars Expedition 3 sustained the base through the long pre-expansion interval and remained on Mars after XH-02 departed uncrewed.|Backfilled from XH-02 ME-3 support logs and uncrewed return timing.
|
|
Mars One Base|faf59da6-de11-4f77-892a-5483f17a30e0|event|Expansion Cargo Arrival|Mars One Expansion|2059-10-19 09:00:00+08:00|||Mars One Base|Solar Shuttle 1 delivered the first Mars One expansion package to the surface site.|Backfilled from Solar Shuttle 1 Mars One Expansion support logs.
|
|
Mars One Base|5112903a-12bb-4529-afa5-1e37eade53d3|state|Mars One Expansion and ME-3 Surface Operations|Mars One Expansion; Mars Expedition 3|2059-10-19 09:00:00+08:00|2059-10-24 14:00:00+08:00|Base Expansion; Surface Expedition|Mars One Base|Expansion work began while Mars Expedition 3 kept the outpost occupied ahead of the next crew arrival.|Overlap inferred from Solar Shuttle 1 expansion and XH-02 ME-4 arrival windows.
|
|
Mars One Base|e890d519-64ac-4152-902f-42c69a553b84|state|ME-3/ME-4 Crew Handoff with Expansion Package|Mars One Expansion; Mars Expedition 3; Mars Expedition 4|2059-10-24 14:00:00+08:00|2059-11-04 08:00:00+08:00|Base Expansion; Crew Handoff|Mars One Base|Mars Expedition 4 arrived with the expansion package while Mars Expedition 3 prepared for ascent and departure.|Overlap inferred from XH-02 ME-4 Part 1, Solar Shuttle 1 expansion, and XH-02 ME-3 return timing.
|
|
Mars One Base|292bb2fc-4688-49e6-94e4-598da921d3e5|state|Mars One Expansion and ME-4 Surface Operations|Mars One Expansion; Mars Expedition 4|2059-11-04 08:00:00+08:00|2060-02-23 08:00:00+08:00|Base Expansion; Surface Expedition|Mars One Base|After Expedition 3 departed, Mars Expedition 4 continued surface operations alongside the active expansion campaign.|Backfilled from XH-02 ME-4 and Solar Shuttle 1 expansion support logs.
|
|
Mars One Base|16e6a85a-2c04-4dc5-8132-b7cd16a104da|state|Expansion, ME-4, and Rover Delivery|Mars One Expansion; Mars Expedition 4; Mars One Rover Delivery|2060-02-23 08:00:00+08:00|2060-05-23 08:00:00+08:00|Base Expansion; Surface Expedition; Cargo Delivery|Mars One Base|The rover delivery campaign overlapped with base expansion and Expedition 4 surface operations.|Overlap inferred from Solar Shuttle 3 rover delivery, Solar Shuttle 1 expansion, and XH-02 ME-4 support logs.
|
|
Mars One Base|8fc9c2b3-6272-44cb-a942-8bd4c83a6d05|state|Mars One Expansion and ME-4 Surface Operations|Mars One Expansion; Mars Expedition 4|2060-05-23 09:30:00+08:00|2060-08-09 05:10:00+08:00|Base Expansion; Surface Expedition|Mars One Base|Expansion work continued after rover deployment while Mars Expedition 4 remained the resident surface crew.|Backfilled from Solar Shuttle 1 expansion and XH-02 ME-4 support logs.
|
|
Mars One Base|0d811cfd-1358-46de-b637-3d0b230da76e|event|Rover Deployment Complete|Mars One Rover Delivery; Mars Expedition 4|2060-05-23 09:30:00+08:00|||Mars One Base|The new Mars One surface rover entered service after the cargo delivery campaign wrapped up.|Backfilled from Solar Shuttle 3 rover delivery support logs.
|
|
Mars One Base|d86f43a9-ae09-4319-8905-98b35c1d585b|state|ME-4 Surface Operations|Mars Expedition 4|2060-08-09 06:00:00+08:00|2060-10-30 08:00:00+08:00|Surface Expedition|Mars One Base|After expansion wrapped up, Mars Expedition 4 continued normal surface operations from the upgraded outpost.|Backfilled from XH-02 ME-4 support logs.
|
|
Mars One Base|1b798abc-10bb-40cc-a517-4593512b0495|event|Expansion Phase Complete|Mars One Expansion; Mars Expedition 4|2060-08-09 06:00:00+08:00|||Mars One Base|The main Mars One expansion phase was completed and Solar Shuttle 1 departed on the return leg.|Backfilled from Solar Shuttle 1 expansion return timing.
|
|
Solar Shuttle 2|d190cc9e-e230-4299-8f13-1bda0f6b1aac|state|Construction||2058-09-17 16:00:00+08:00|2059-09-11 08:00:00+08:00|Construction|LEO|Solar Shuttle 2 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
Solar Shuttle 2|8e33ce9e-2409-4b1c-af09-6a931fbe2d49|state|Trial Run||2059-09-11 08:00:00+08:00|2059-12-01 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
Solar Shuttle 2|5a2092a8-ddad-41b3-9819-fa52557332ed|state|EOEM Outbound|Europa Outpost Expansion Mission|2059-12-09 08:00:00+08:00|2060-05-01 08:00:00+08:00|Transfer|Sun||
|
|
Solar Shuttle 2|c0271f19-e604-4c15-9c00-7118fec1928e|state|Europa Outpost Expansion Mission|Europa Outpost Expansion Mission|2060-05-01 08:00:00+08:00|2060-05-06 07:25:00+08:00|Outpost Expansion|Europa|Europa Outpost Expansion Package delivered via Qingtian Cargo Spacecraft|
|
|
Solar Shuttle 2|687615b6-144f-4fd5-b3ee-709e4eaea6aa|state|EOEM Inbound|Europa Outpost Expansion Mission|2060-05-06 07:25:00+08:00|2060-06-26 08:00:00+08:00|Transfer|Sun||
|
|
Solar Shuttle 3|219355f0-1399-49af-b352-6728f0d4c82b|state|Construction||2059-01-14 16:00:00+08:00|2059-12-14 08:00:00+08:00|Construction|Star Port|Solar Shuttle 3 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
Solar Shuttle 3|aac31a1a-45c7-47f4-add3-fbfa30f9011f|state|Trial Run||2059-12-14 08:00:00+08:00|2060-02-20 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
Solar Shuttle 3|7deb1192-d6f0-4635-9a6d-39ab0c2adcfe|state|Mars One Rover Delivery|Mars One Rover Delivery|2060-02-23 08:00:00+08:00|2060-05-23 08:00:00+08:00|Cargo Delivery|Mars|Mars One Rover Delivery|Timeline.xlsx inferred monthly phase. Raw: Mars One Rover Delivery
|
|
Solar Shuttle 3|d33a6759-0f54-4e71-909b-6d3916ca13dc|state|Mars Return||2060-11-05 04:07:00+08:00||Transfer|Sun||
|
|
ST-01 万星源|ae003c1f-f74e-459b-ade2-74fcdae48605|state|Construction||2050-09-15 16:00:00+08:00|2054-04-28 16:00:00+08:00|Construction|LEO|Construction|2050-09-15 First module delivered to LEO via Vulture Shuttle
|
|
|
|
2053-02-02 Assembly Halted
|
|
ST-01 万星源|105a5eac-4ca1-4a5a-a9ad-bc2278d46f01|state|Trial Run||2054-05-12 08:00:00+08:00|2054-08-22 08:00:00+08:00|Trial Run|Lunar Orbit|Trial Run before commissioning|2054-05-12 Begin Trial Run in Earth Orbit, testing all systems
|
|
2054-08-22 Trial Run complete, all systems perform as expected. Including multiple run to GEO and Lunar Orbit before returning to LEO.
|
|
ST-01 万星源|f6ae082d-5c36-44f9-92da-d5e568a71fea|state|Deep Space Test Mission||2054-09-07 08:00:00+08:00|2054-11-28 08:00:00+08:00|Deep Space Test Mission|Earth-Sun L2|Uncrewed mission to Earth-Sun Lagrange Point 2 to test long-duration operations|2054-09-07 Begin Deep Space Test Mission
|
|
2054-11-28 Test Mission Complete, all systems nominal. Returning to LEO.
|
|
ST-01 万星源|503a0035-1cd7-4e8e-9bc6-922c2e5c3171|state|Maintenance before Commissioning||2054-12-01 08:00:00+08:00|2055-02-28 08:00:00+08:00|Maintenance before Commissioning|LEO||
|
|
ST-01 万星源|4bfddc84-dfec-43e3-b534-4fb798bcc73f|state|ISSEM-1 Mercury Transfer|Inner Solar System Exploration Mission 1|2055-03-20 08:00:00+08:00|2055-04-17 08:00:00+08:00|Transfer|Sun|Earth-Mecury transfer, using standard trajectory with 127km/s of departure burn|2055-03-20 Picking up crew for Inner Solar System Exploration Mission 1
|
|
2055-03-22 Earth Departure for Mecury
|
|
2055-04-17 Mercury Arrival
|
|
ST-01 万星源|42698c8c-a1cc-4742-9885-7b9e650f9867|state|ISSEM-1 Mercury Operations|Inner Solar System Exploration Mission 1|2055-04-18 08:00:00+08:00|2055-08-14 08:00:00+08:00|Planetary Operations|Mercury|First crewed mission to Mercury|2055-04-17 Mercury Arrival
|
|
2055-04-18 Orbital Survey of Mercury begins
|
|
2055-06-14 First Crewed Surface Landing on Mercury
|
|
2055-06-15 EVA operations commence
|
|
2055-06-30 Surface operations complete, returning to orbit
|
|
2055-08-15 Departure from Mercury for Venus
|
|
ST-01 万星源|2adfa016-b23a-4459-af6e-a84da2aa2469|state|ISSEM-1 Venus Transfer|Inner Solar System Exploration Mission 1|2055-08-15 08:00:00+08:00|2055-10-01 08:00:00+08:00|Transfer|Sun|Mecury-Venus transfer, using standard trajectory with 85km/s of departure burn|2055-08-15 Departure from Mercury for Venus
|
|
2055-10-01 Venus Arrival
|
|
ST-01 万星源|f28469ee-1dbc-4232-98ff-91f7abcb9d59|state|ISSEM-1 Venus Operations|Inner Solar System Exploration Mission 1|2055-10-01 08:00:00+08:00|2056-03-24 08:00:00+08:00|Planetary Operations|Venus|First crewed mission to Venus, no crewed landing attempted due to extreme surface conditions. Probe deployment only.|2055-10-01 Venus Arrival
|
|
2055-10-02 Orbital Survey of Venus begins
|
|
2055-10-10 Landing Probe Deployment
|
|
2055-11-10 Begin Upper Atmosphere Survey via Callisto MPV
|
|
2056-03-24 Departure from Venus for Earth
|
|
ST-01 万星源|1f6e85aa-121a-4f47-95b6-35f040da055c|state|ISSEM-1 Inbound|Inner Solar System Exploration Mission 1|2056-03-24 08:00:00+08:00|2056-04-12 08:00:00+08:00|Transfer|Sun|Venus-Earth transfer, using standard trajectory with 75km/s of departure burn|2056-03-24 Departure from Venus for Earth
|
|
2056-04-12 Earth Arrival
|
|
ST-01 万星源|540c146e-0d48-4735-8eb4-6fe08506b705|state|Maintenance||2056-04-15 08:00:00+08:00|2056-05-31 08:00:00+08:00|Maintenance|LEO||
|
|
ST-01 万星源|ffd625b0-0de4-4f47-8c8d-36669a1675f6|state|MOCM-2 Outbound|Mars One Construction Mission 2|2056-06-02 08:00:00+08:00|2056-07-01 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer, using standard trajectory with 126km/s of departure burn|2056-06-02 Picking up crew for Mars One Construction Mission 2
|
|
2056-06-04 Picking up Mars One construction cargo
|
|
2056-06-06 Earth Departure for Mars
|
|
2056-07-01 Mars Arrival, First crewed mission to Mars using Stellaria
|
|
ST-01 万星源|12059276-d10a-4a37-9b8c-6a6183768504|state|MOCM-2 Mars Operations|Mars One Construction Mission 2|2056-07-03 08:00:00+08:00|2056-10-12 08:00:00+08:00|Base Construction|Mars|Continuing the construction of Mars One Base|2056-07-03 Crew descend to Martian Surface, Continuing the construction of Mars One Base
|
|
2056-07-20 Heavy Cargo Delivery to Surface via Callisto MPV
|
|
2056-09-17 Mars One Construction Mission 3 Crew Arrival via XH-01, joining Stellaria crew. First Crew Handover on Mars.
|
|
2056-10-12 Mars One Construction Mission 2 Crew ascend to Stellaria
|
|
2056-10-15 Departure from Mars for Earth
|
|
ST-01 万星源|cf351aa5-4149-4938-939b-edcb846f4b14|state|MOCM-2 Inbound|Mars One Construction Mission 2|2056-10-15 08:00:00+08:00|2056-11-03 08:00:00+08:00|Transfer|Sun|Mars-Earth transfer, using Fast Return trajectory with 212km/s of departure burn|2056-10-15 Departure from Mars for Earth
|
|
2056-11-03 Earth Arrival
|
|
ST-01 万星源|fd8fba0b-82bb-4ad3-bc38-58745291627b|state|Maintenance||2056-11-04 08:00:00+08:00|2056-12-10 08:00:00+08:00|Maintenance|LEO||
|
|
ST-01 万星源|7747339c-f602-4ddf-8511-6862006f789b|state|EOCM-1 Outbound|Europa Outpost Construction Mission 1|2056-12-15 08:00:00+08:00|2057-02-25 08:00:00+08:00|Transfer|Sun|Earth-Europa transfer, using standard trajectory with 165km/s of departure burn|2056-12-15 Start preparations for Europa Outpost Construction Mission 1
|
|
2056-12-20 Europa Outpost Construction Package arrival via Qingtian Cargo Shuttle
|
|
2056-12-31 Picking up crew for Europa Outpost Construction Mission 1
|
|
2057-01-02 Earth Departure for Europa
|
|
ST-01 万星源|545f687e-bd2c-409a-8fb8-186a6dead67e|state|EOCM-1 Europa Operations|Europa Outpost Construction Mission 1|2057-02-27 08:00:00+08:00|2057-10-01 08:00:00+08:00|Outpost Construction|Europa|First crewed mission to Europa|2057-02-27 Heavy Cargo Delivery to Surface via Qingtian Cargo Shuttle
|
|
2057-03-15 Crew descend to Europan Surface, Beginning construction of Europa Outpost
|
|
6 crewed ascend and descend operations to Europa Surface via Callisto MPV between 2057-03-15 and 2057-09-15
|
|
2057-10-01 Europa Outpost Construction Mission 1 Crew ascend to Stellaria, wrapping up construction phase 1
|
|
2057-10-04 Europa Departure for Earth
|
|
ST-01 万星源|43f2ece9-283b-4484-b838-d684b9ada4d6|state|EOCM-1 return to Earth|Europa Outpost Construction Mission 1|2057-10-04 08:00:00+08:00|2057-12-20 08:00:00+08:00|Transfer|Europa|Europa-Earth transfer, using Fast trajectory with 216km/s of departure burn|2057-10-04 Europa Departure for Earth
|
|
|
|
2057-12-20 Earth Arrival
|
|
ST-01 万星源|7d6a56c8-9ebc-4940-813b-54ee2c9711f4|state|Maintenance and Upgrades||2058-01-05 08:00:00+08:00|2058-05-15 08:00:00+08:00|Maintenance and Upgrades|LEO|Extensive overhauls to bring ST-01 closer to full Stellaria specifications. Add more greenhouse modules, upgrade life support systems, add another Rotating Habitat Ring|
|
|
ST-01 万星源|cad8537e-1966-4b3c-abed-35c511950ac8|state|SEM-1 outbound|Saturn Exploration Mission 1|2058-06-01 08:00:00+08:00|2058-10-12 08:00:00+08:00|Transfer|Sun|Earth-Saturn transfer, using Fast trajectory with 210km/s of departure burn|First crewed mission to Saturn
|
|
ST-01 万星源|022b0296-5c1a-41f8-8634-97dc663b05d9|state|SEM-1 Saturn Operations|Saturn Exploration Mission 1|2058-10-12 08:00:00+08:00|2059-07-01 08:00:00+08:00|Planetary Operations|Saturn System|First crewed mission to Saturn|2059-05-31 Parked into Iapetus orbit, orbital science completed
|
|
|
|
2059-06-15 Start Iapetus Surface operation
|
|
ST-01 万星源|f536e950-a024-45e3-95ff-da5f77772119|state|SEM-1 Inbound|Saturn Exploration Mission 1|2059-07-01 08:00:00+08:00|2059-11-24 08:00:00+08:00|Transfer|Sun|Saturn-Earth transfer, using standard trajectory with 162km/s of departure burn|
|
|
ST-01 万星源|3fce336c-7ac9-4117-9239-bf939dfe1ad1|state|Maintenance and Upgrades||2059-11-25 08:00:00+08:00|2060-02-10 08:00:00+08:00|Maintenance and Upgrades|Star Port|Upgrades complete, ST-01 now fully meets Stellaria specifications.|
|
|
ST-01 万星源|8a9de074-6348-4190-bd27-e3bdeddb70f7|state|OSSEM-1 Outbound|Outer Solar System Exploration Mission 1|2060-02-11 08:00:00+08:00|2060-07-24 20:11:00+08:00|Transfer|Sun|地球出发前往海王星|23 crew on board
|
|
ST-01 万星源|18b3429e-28d3-489c-b65c-35e0e9775a0d|state|OSSEM-1 Neptune Exploration|OSSEM-1; Neptune|2060-07-25 06:40:00+08:00||Exploration|Neptune||
|
|
ST-02 Kristen|eefd7712-b6f4-496c-9bc8-8eb9546887b8|state|Construction||2052-01-14 16:00:00+08:00|2053-02-10 08:00:00+08:00|Construction|LEO|ST-02 Kristen Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
ST-02 Kristen|721dec30-3c58-4885-8fda-22e2960ef4a0|state|Assembly Halted||2053-02-10 08:00:00+08:00|2053-05-12 08:00:00+08:00|Assembly Halted|LEO|Assembly halted pending redesign and program review|Timeline.xlsx inferred monthly phase. Raw: Assembly Halted
|
|
ST-02 Kristen|8226a3aa-1896-42e2-9e5e-0fca750d229d|state|Reconfiguring to ST-02||2053-05-12 08:00:00+08:00|2055-10-13 08:00:00+08:00|Reconfiguring to ST-02|LEO|Vehicle reconfiguration and systems integration|Timeline.xlsx inferred monthly phase. Raw: Reconfiguring to ST-02
|
|
ST-02 Kristen|826e67d8-e876-41e5-9551-a80f700e90cd|state|Trial Run||2055-10-13 08:00:00+08:00|2056-03-10 08:00:00+08:00|Trial Run|Lunar Orbit|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
ST-02 Kristen|b5a01aed-7a98-4f81-a84f-efb59b8f2479|state|Deep Space Test Mission||2056-03-10 08:00:00+08:00|2056-06-08 08:00:00+08:00|Deep Space Test Mission|Earth-Sun L2|Uncrewed Mission to Earth-Sun L2|Timeline.xlsx inferred monthly phase. Raw: Deep Space Test Mission / Uncrewed Mission to Earth-Sun L2
|
|
ST-02 Kristen|7b7fd38f-2647-4ed8-b1bc-27e94861b15d|state|Maintenance||2056-06-08 08:00:00+08:00|2056-11-19 08:00:00+08:00|Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
ST-02 Kristen|ca8f8223-800b-4562-8405-a270d3960a6e|state|ME-1 Mars Operations|Mars Expedition 1|2056-11-19 08:00:00+08:00|2057-09-08 08:00:00+08:00|Planetary Operations|Mars|Mars Expedition 1|Timeline.xlsx inferred monthly phase. Raw: Mars Expedition 1
|
|
ST-02 Kristen|a7c43eae-31fc-451d-8bbc-fd6f3da63f22|state|Maintenance||2057-09-08 08:00:00+08:00|2057-10-06 08:00:00+08:00|Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
ST-02 Kristen|a61ee6fc-5495-4b5b-a505-968669b81b18|state|EOCM-2 Outbound|Europa Outpost Construction Mission 2|2057-10-06 08:00:00+08:00|2058-01-19 08:00:00+08:00|Transfer|Sun|Earth-Europa transfer|Timeline.xlsx inferred monthly phase. Raw: Earth-Europa
|
|
ST-02 Kristen|fb17cab1-dcbc-4814-83e9-5fb81a73f869|state|EOCM-2 Europa Operations|Europa Outpost Construction Mission 2|2058-01-19 08:00:00+08:00|2058-09-06 08:00:00+08:00|Outpost Construction|Europa|Europa Outpost Construction Mission 2|Timeline.xlsx inferred monthly phase. Raw: Europa Outpost Construction Mission 2
|
|
ST-02 Kristen|efdb28dd-3e02-4b16-80e8-7a2d4df76825|state|EOCM-2 Inbound|Europa Outpost Construction Mission 2|2058-09-06 08:00:00+08:00|2058-11-08 08:00:00+08:00|Transfer|Sun|Europa-Earth transfer|Timeline.xlsx inferred monthly phase. Raw: Europa-Earth
|
|
ST-02 Kristen|77c71061-354d-4045-b5cd-5cd6b1e8dd65|state|Maintenance and Upgrades||2058-11-08 08:00:00+08:00|2059-04-06 08:00:00+08:00|Maintenance and Upgrades|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance and Upgrades
|
|
ST-02 Kristen|fe21560f-60f4-48bb-bbdb-e2c1ab6fe3af|state|EE-2 Outbound|Europa Expedition 2|2059-04-06 08:00:00+08:00|2059-06-25 08:00:00+08:00|Transfer|Sun|Earth-Europa transfer|
|
|
ST-02 Kristen|65910288-0c2a-4800-bfce-39495efafce2|state|EE-2 Europa Operations|Europa Expedition 2|2059-06-25 08:00:00+08:00|2060-06-28 02:47:00+08:00|Planetary Operations|Europa|Supporting Europa Expedition 2|
|
|
ST-02 Kristen|e77cd6b5-a2e2-479b-817b-67c1c59bfdee|state|EE-2 Inbound|Europa Expedition 2|2060-06-28 02:47:00+08:00|2060-08-30 06:11:00+08:00|Transfer|Sun||
|
|
ST-02 Kristen|6c7a8724-1324-4a68-81e1-3dc2ce1ce980|state|Upgrade to Stellaria Class||2060-08-30 07:26:00+08:00|2061-06-30 08:00:00+08:00|Upgrade|Star Ring Station|A full overhaul to bring ST-02 to full Stellaria standard|
|
|
ST-03 Muelsyse|10030cb4-2626-483a-8682-db9eed90da71|state|Construction||2056-02-13 16:00:00+08:00|2059-07-07 08:00:00+08:00|Construction|LEO|ST-03 Muelsyse Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
ST-03 Muelsyse|520e5ad4-e79c-458d-8387-76ba0a120b2e|state|Assembly Complete||2059-07-07 08:00:00+08:00|2059-08-12 08:00:00+08:00|Assembly Complete|LEO|Assembly complete, preparing for commissioning|Timeline.xlsx inferred monthly phase. Raw: Assembly Complete
|
|
ST-03 Muelsyse|068b82d8-e107-465b-98b8-eba39739ee63|state|Trial Run||2059-08-12 08:00:00+08:00|2060-03-07 08:00:00+08:00|Trial Run|Lunar Orbit|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
ST-03 Muelsyse|16e6ce3d-d2ef-4910-a1ff-4670cbb63fb7|state|Maintenance||2060-03-07 08:00:00+08:00|2060-06-10 08:00:00+08:00|Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
ST-03 Muelsyse|e61bb0d2-ab64-4f79-a18a-77dea92eb3ab|state|Deep Space Test||2060-06-15 08:00:00+08:00|2060-09-10 08:00:00+08:00|Deep Space Test|Sun-Earth L2||
|
|
ST-03 Muelsyse|2f391faf-4061-45cc-bcd5-ce5956cff9bd|state|Pre-commissioning Maintenance||2060-09-10 08:00:00+08:00|2060-10-25 08:00:00+08:00|Maintenance|LEO||
|
|
ST-04|b5fceb9b-264c-4842-a329-0a7c4ccc9779|state|Construction||2059-07-12 16:00:00+08:00|2063-01-07 08:00:00+08:00|Construction|LEO|ST-04 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
ST-04|4dfd3584-ad5c-4d6d-9c86-d337d627fb9e|state|Assembly Complete||2063-01-07 08:00:00+08:00|2063-02-12 08:00:00+08:00|Assembly Complete|LEO|Assembly complete, preparing for commissioning|Timeline.xlsx inferred monthly phase. Raw: Assembly Complete
|
|
ST-04|93f7700f-d0be-48a9-8fdf-f1d0a824ac86|state|Trial Run||2063-02-12 08:00:00+08:00|2063-09-06 08:00:00+08:00|Trial Run|Lunar Orbit|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
ST-04|c6ac0899-e235-4de6-8a9e-89ff98e725fa|state|Maintenance||2063-09-06 16:00:00+08:00||Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
XH-01 羲和|1934e3f4-0d0c-4699-b4bd-753744ab29a1|state|Construction||2050-03-16 00:00:00+08:00|2052-02-07 00:00:00+08:00|Construction|LEO|Xihe XH-01 Construction|2050-03-15 First module delivered to LEO via Vulture Shuttle
|
|
|
|
2052-02-06 Assembly completed in LEO
|
|
XH-01 羲和|a0a3bed9-91a2-45c7-be54-7216e33f87b3|state|Fitting||2052-02-07 08:00:00+08:00|2052-05-31 08:00:00+08:00|Fitting|LEO||
|
|
XH-01 羲和|8ee54d7e-4310-43dc-a703-f633c1013405|state|Trial Run||2052-06-01 08:00:00+08:00|2052-11-30 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|2052-06-01 Begin Trial Run in Earth Orbit, testing all systems
|
|
2052-11-30 Trial Run complete, all systems perform as expected. Including multiple run to GEO and Lunar Orbit before returning to LEO.
|
|
XH-01 羲和|4464a892-910e-416c-b044-0683b6516003|state|Maintenance||2052-12-01 08:00:00+08:00|2053-01-05 08:00:00+08:00|Maintenance|Earth||
|
|
XH-01 羲和|d103bc92-da3a-4ba6-965e-a9385e208581|state|Deep Space Test Mission||2053-01-12 08:00:00+08:00|2053-12-18 08:00:00+08:00|Deep Space Test Mission|Earth-Sun L2|Long term uncrewed test|2053-01-12 Uncrewed mission to Earth-Sun L2 point to test deep space operations
|
|
2053-12-18 Back to LEO
|
|
XH-01 羲和|80931042-da68-435b-94f5-da2d1b79e801|state|Maintenance and Upgrades||2054-01-07 08:00:00+08:00|2054-06-28 08:00:00+08:00|Maintenance and Upgrades|LEO||
|
|
XH-01 羲和|e54817e0-6809-404d-be62-c6017d143362|state|MMD Outbound|Mars Mission Demo|2054-07-10 08:00:00+08:00|2054-08-21 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer, Uses standard trajectory with 102km/s of departure burn|
|
|
XH-01 羲和|23b4304f-8fca-4d78-8a93-c9f78fab51e0|state|MMD Mars Operations|Mars Mission Demo|2054-08-21 08:00:00+08:00|2055-01-10 08:00:00+08:00|Planetary Operations|Mars|Uncrewed, Deliver the first Mars-One base construction equipment package to Mars orbit.|2054-08-21 Mars Orbit Arrival, deploy equipment package to Mars surface via lander
|
|
2055-01-10 Mars Departure, return to Earth
|
|
XH-01 羲和|ded06cd6-f9a4-4646-9be4-2f01cf067334|state|MMD Inbound|Mars Mission Demo|2055-01-10 08:00:00+08:00|2055-02-28 08:00:00+08:00|Transfer|Sun|Uses standard trajectory with 97km/s of departure burn|2055-02-28 Earth Arrival, demo run complete, all systems perform as expected.
|
|
XH-01 羲和|fecc4450-ba77-4bc6-b794-164766a0c8b8|state|Maintenance and Upgrades||2055-03-01 08:00:00+08:00|2055-05-14 08:00:00+08:00|Maintenance and Upgrades|LEO||
|
|
XH-01 羲和|aab3125c-c99e-4af5-ab64-ffe7fda48ad7|state|MOCM-1 Outbound|Mars One Base Construction Mission 1|2055-06-15 08:00:00+08:00|2055-07-30 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer, Uses standard trajectory with 115km/s of departure burn|2055-06-15 Picking up crew for Mars One base Construction Mission 1
|
|
2055-06-18 Earth Departure for Mars
|
|
XH-01 羲和|ec34d68b-4728-42eb-af79-b3e8805aa253|state|MOCM-1 Mars Operations|Mars One Base Construction Mission 1|2055-07-30 08:00:00+08:00|2056-02-07 08:00:00+08:00|Base Construction|Mars|First Crewed mission to Mars. Construction for Mars One base begin|2055-07-30 Mars Arrival, begin base construction
|
|
2056-02-07 Mars Departure, return to Earth. First to use quick return trajectory.
|
|
XH-01 羲和|bdf99335-d329-4bd2-8e17-27ac1f097ca9|state|MOCM-1 Inbound|Mars One Base Construction Mission 1|2056-02-07 08:00:00+08:00|2056-03-18 08:00:00+08:00|Transfer|Sun|Mars-Earth transfer. Uses Fast-travel trajectory with 207km/s of departure burn|2056-03-18 Earth Arrival, crew return
|
|
XH-01 羲和|8e1be891-57ec-4551-b114-232f4681b2b1|state|Maintenance and Upgrades||2056-03-25 08:00:00+08:00|2056-06-20 08:00:00+08:00|Maintenance and Upgrades|LEO||
|
|
XH-01 羲和|ea2024c5-95e6-4acc-a88d-998183a35a5a|state|MOCM-3 Outbound|Mars One Base Construction Mission 3|2056-07-30 08:00:00+08:00|2056-09-15 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer. Uses standard trajectory with 95km/s of departure burn|2056-07-30 Picking up crew for Mars One base Construction Mission 3
|
|
2056-08-02 Earth Departure for Mars
|
|
XH-01 羲和|fd22c4b2-4938-4c01-ae92-e84f14d8b8dd|state|MOCM-3 Operations|Mars One Base Construction Mission 3|2056-09-15 08:00:00+08:00|2057-02-12 08:00:00+08:00|Base Construction|Mars|Third Mars One base construction. First crew hand-off on Mars(with Mars One base construction 2).|2056-09-15 Mars Arrival, continue base construction
|
|
2057-02-12 Mars Departure, return to Earth.
|
|
XH-01 羲和|e5f549b9-0446-48be-a606-d9c1ada664b7|state|MOCM-3 Inbound|Mars One Base Construction Mission 3|2057-02-12 08:00:00+08:00|2057-03-25 08:00:00+08:00|Transfer|Sun|Mars-Earth transfer. Uses standard trajectory with 122km/s of departure burn|2037-03-25 Earth Arrivasl, crew return
|
|
XH-01 羲和|6d57910a-7459-4b74-b0ea-e10ee7cab87b|state|Maintenance||2057-03-26 08:00:00+08:00|2057-04-25 08:00:00+08:00|Maintenance|LEO||
|
|
XH-01 羲和|30c84287-e5d1-473c-93fb-9d36d426516e|state|ME-2 Outbound|Mars Expedition 2|2057-05-05 08:00:00+08:00|2057-06-22 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer using standard trajectory with 110km/s of departure burn|2027-05-05 Picking up crew for Mars Expedition 2
|
|
2027-05-09 Earth Departure for Mars
|
|
XH-01 羲和|7f5da9b3-94fa-4bd5-a6bd-94f6841c71a2|state|ME-2 Mars Operations|Mars Expedition 2|2057-06-22 08:00:00+08:00|2058-04-18 08:00:00+08:00|Planetary Operations|Mars|Second long term Mars Expedition, first mission to Mars One base after the construction is completed.
|
|
First mission involving space tourism to Mars.|2057-06-22 Mars Arrival
|
|
2057-06-25 Mars EDL and surface operations begin
|
|
2058-04-10 Begin Mars Departure preparations
|
|
2058-04-18 Mars Departure for Earth
|
|
XH-01 羲和|058bbf6d-5c51-49c4-8516-8b6931db53c1|state|ME-2 Inbound|Mars Expedition 2|2058-04-18 08:00:00+08:00|2058-05-20 08:00:00+08:00|Transfer|Sun|Mars-Earth transfer using standard trajectory with 115km/s of departure burn|2058-04-18 Mars Departure for Earth
|
|
2058-05-20 Earth Arrival, crew return
|
|
XH-01 羲和|161bb9f0-3d2a-46da-9044-9184e0704413|state|Maintenance||2058-05-21 08:00:00+08:00|2058-06-18 08:00:00+08:00|Maintenance|LEO||
|
|
XH-01 羲和|4ff368c4-503b-42ce-9e82-b4da291d3203|state|EE-1 Outbound|Europa Expedition 1|2058-07-10 08:00:00+08:00|2058-09-25 08:00:00+08:00|Transfer|Sun|Earth-Jupiter transfer using standard trajectory with 160km/s of departure burn|2058-07-10 Picking up crew for Europa Expedition 1
|
|
2058-07-12 Earth Departure for Jupiter system
|
|
2058-09-25 Europa Arrival
|
|
XH-01 羲和|f01bfb99-f981-45f6-808b-7c5222503715|state|EE-1 Jupiter System Operations|Europa Expedition 1|2058-09-25 08:00:00+08:00|2059-07-10 08:00:00+08:00|Planetary Operations|Jupiter System|First standard crew expedition to Europa Outpost to begin exploration of Jupiter system
|
|
Long term surface operation at Europa Outpost, followed by exploration of IO and Ganymede|2058-09-25 Europa Arrival
|
|
2058-09-27 Europa descend, begin surface operation at Europa Outpost
|
|
2058-12-15 Europa ascend, begin Jupiter system exploration
|
|
2058-12-20 Begin IO exploration
|
|
2059-01-20 Return to Europa Outpost
|
|
2059-06-20 Begin Europa Outpost departure preparations
|
|
2059-06-25 Europa Expedition 1 crew ascend from Europa Outpost
|
|
2059-07-05 begin Ganymede exploration
|
|
2059-07-10 Departure for Earth, upgrade planned.
|
|
XH-01 羲和|92315017-7011-4930-aabb-d00a6f3f4994|state|EE-1 Inbound|Europa Expedition 1|2059-07-10 08:00:00+08:00|2059-11-15 08:00:00+08:00|Transfer|Sun|Uses standard trajectory with 112km/s of departure burn
|
|
|
|
Parked to Star Port|2059-07-10 Departure for Earth.
|
|
|
|
2059-11-15 Earth Arrival, Park to Star Port.
|
|
XH-01 羲和|21a37859-aa16-4c29-b17a-8012f6037478|state|Maintenance and Upgrades||2059-11-16 08:00:00+08:00|2060-02-19 08:00:00+08:00|Maintenance and Upgrades|Star Port|Greenhouse upgrade to support long term deep space missions|
|
|
XH-01 羲和|ee52cc53-7d9c-4134-ba1b-4f7cfb8fdce9|state|EE-3 Outbound|Europa Expedition 3|2060-02-20 08:00:00+08:00|2060-05-01 08:00:00+08:00|Transfer|Sun|Uses standard trajectory with 163km/s of departure burn|2060-02-20 Picking up Europa Expedition 3 crew, On its way to explore Jupiter systems before sending crew to Europa Outpost
|
|
XH-01 羲和|91d4948a-ae04-43a8-ac3b-def9caecc8e5|state|EE-3 Jupiter System Operations|Europa Expedition 3|2060-05-01 08:00:00+08:00||Jupiter Exploration; Outpost Rotation|Jupiter System|Crew Rotation to Euorpa Outpost. First to explore Jupiter's moons, then to Europa Outpost|2060-05-01 Jupiter Arrival
|
|
|
|
2060-05-02 Io Arrival
|
|
|
|
2060-05-07 Io descend
|
|
|
|
2060-05-09 Io departure
|
|
|
|
2060-05-11 Ganymede Arrival
|
|
|
|
2060-05-12 Ganymede descend
|
|
|
|
2060-05-21 Ganymede Departure for Callisto
|
|
|
|
2060-05-25 Callisto Arrival
|
|
XH-02 太白|4958ffd7-2e23-40a6-9b96-e46c61943028|state|Construction||2054-12-11 08:00:00+08:00|2056-10-04 08:00:00+08:00|Construction|LEO|XH-02 太白 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
XH-02 太白|b99a2638-7560-45ec-9328-6a4a0e4cf685|state|Assembly Complete||2056-10-04 08:00:00+08:00|2056-11-11 08:00:00+08:00|Assembly Complete|LEO|Assembly complete, preparing for commissioning|Timeline.xlsx inferred monthly phase. Raw: Assembly Complete
|
|
XH-02 太白|6ec7033c-e711-4148-ab7d-e075f3288021|state|Trial Run||2056-11-11 08:00:00+08:00|2057-03-12 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
XH-02 太白|669a993c-fe3d-4126-b066-2650e98dfb3e|state|Maintenance||2057-03-12 08:00:00+08:00|2057-04-25 08:00:00+08:00|Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
XH-02 太白|7c166ff7-df3b-495d-a7df-9b99949e23f0|state|AEM Outbound|Asteroid Exploration Mission|2057-05-04 08:00:00+08:00|2057-07-17 08:00:00+08:00|Transfer|Sun|Earth-Vesta transfer|Timeline.xlsx inferred monthly phase. Raw: Earth-Vesta
|
|
XH-02 太白|99eb75ba-e02b-4cdc-a5f1-3ea547cc7d4a|state|AEM Vesta Operations|Asteroid Exploration Mission|2057-07-17 08:00:00+08:00|2058-01-04 08:00:00+08:00|Asteroid Operations|Vesta|Asteroid exploration mission at Vesta|Timeline.xlsx inferred monthly phase. Raw: Vesta Mission
|
|
XH-02 太白|d74dfb61-fd3a-492c-b019-253ec9cd826d|state|AEM Inbound|Asteroid Exploration Mission|2058-01-04 08:00:00+08:00|2058-04-17 08:00:00+08:00|Transfer|Sun|Vesta-Earth transfer|Timeline.xlsx inferred monthly phase. Raw: Vesta-Earth
|
|
XH-02 太白|956cc319-668e-45d1-ab7c-9f0aa408c5f7|state|ME-3 Mars Operations|Mars Expedition 3|2058-04-17 08:00:00+08:00|2059-05-04 08:00:00+08:00|Planetary Operations|Mars|Mars Expedition 3|Timeline.xlsx inferred monthly phase. Raw: Mars Expedition 3
|
|
XH-02 太白|f43aa249-80d1-426c-9aca-a341411be98d|state|Uncrewed Inbound|Mars Expedition 3|2059-05-04 08:00:00+08:00|2059-07-06 08:00:00+08:00|Transfer|Sun|Uncrewed Inbound for TH-02. Mars Expedition 3 Crew remaining on Mars|
|
|
XH-02 太白|2ae7438b-a2a2-44ee-a084-a76bc1e94114|state|Maintenance||2059-07-06 08:00:00+08:00|2059-08-04 08:00:00+08:00|Maintenance|Star Port||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
XH-02 太白|fcb05995-823e-4a63-9cf8-44ea953e2e9a|state|ME-4 Outbound|Mars Expedition 4|2059-08-04 08:00:00+08:00|2059-10-24 08:00:00+08:00|Transfer|Sun|Earth-Mars transfer|Carrying Mars Expedition 4 crew and Mars One Expansion Package to Mars
|
|
XH-02 太白|c00366fd-6b1d-46e0-8163-4bd6b510f374|state|ME-4 Mars Operations Part 1|Mars Expedition 4|2059-10-24 14:00:00+08:00|2059-11-04 08:00:00+08:00|Planetary Operations|Mars|ME-4 Crew to Mars One with Mars One Expansion Package. Mars Expedition 3 ascend.|
|
|
XH-02 太白|33a45210-3497-4826-ba6e-291b384ebe7e|state|ME-3 Inbound|Mars Expedition 3|2059-11-04 08:00:00+08:00|2060-01-06 08:00:00+08:00|Transfer|Sun|Carrying ME-3 Crew home|
|
|
XH-02 太白|5562aa60-8d62-4ed9-b1cc-51ff99c49d18|state|Maintenance||2060-01-06 08:00:00+08:00|2060-02-17 08:00:00+08:00|Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
XH-02 太白|76cd99ba-c259-4969-a8ae-2fa14e303974|state|Uncrewed Outbound|Mars Expedition 4|2060-01-22 08:00:00+08:00|2060-02-27 08:00:00+08:00|Transfer|Sun||
|
|
XH-02 太白|c7e777fd-c7d8-4d01-be07-871862829983|state|ME-4 Mars Operations Part 2|Mars Expedition 4|2060-02-28 08:00:00+08:00|2060-10-30 08:00:00+08:00|Planetary Operations|Mars|Uncrewed Mars mission segment|Timeline.xlsx inferred monthly phase. Raw: Uncrewed to Mars, Mars Expedition 4 Part 2
|
|
XH-03 常曦|505255ab-902e-4586-9905-8ecad10353e7|state|Construction||2058-02-15 16:00:00+08:00|2059-12-09 08:00:00+08:00|Construction|LEO|XH-03 常曦 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
XH-03 常曦|b0848762-4f30-45fa-9e5f-5e53a0a7aba3|state|Assembly Complete||2059-12-09 08:00:00+08:00|2060-01-14 08:00:00+08:00|Assembly Complete|LEO|Assembly complete, preparing for commissioning|Timeline.xlsx inferred monthly phase. Raw: Assembly Complete
|
|
XH-03 常曦|b87ea1ef-b240-48f7-aba8-0af7566bd6be|state|Trial Run||2060-01-14 08:00:00+08:00|2060-06-09 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
XH-03 常曦|bdc91489-7c65-45c2-bd78-4a37edc9dd4e|state|Maintenance||2060-06-09 08:00:00+08:00||Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
XH-04|86055939-185d-476b-afc5-1a60a69a1ccb|state|Construction||2059-09-16 16:00:00+08:00|2061-08-10 08:00:00+08:00|Construction|LEO|XH-04 Construction|Timeline.xlsx inferred monthly phase. Raw: Construction
|
|
XH-04|d9b91820-7ea9-4f79-bca6-1fd450862c17|state|Assembly Complete||2061-08-10 08:00:00+08:00|2061-09-15 08:00:00+08:00|Assembly Complete|LEO|Assembly complete, preparing for commissioning|Timeline.xlsx inferred monthly phase. Raw: Assembly Complete
|
|
XH-04|952a415e-408b-42a4-8dd8-24940e745d65|state|Trial Run||2061-09-15 08:00:00+08:00|2062-02-10 08:00:00+08:00|Trial Run|Earth|Trial Run before commissioning|Timeline.xlsx inferred monthly phase. Raw: Trial Run
|
|
XH-04|85aa5084-4c7a-4863-8bcc-ee9238d95d2c|state|Maintenance||2062-02-10 08:00:00+08:00||Maintenance|LEO||Timeline.xlsx inferred monthly phase. Raw: Maintenance
|
|
启明空间站|00aec49b-6dc1-4b58-bbf1-96086b93ff0e|state|Expedition 11|Expedition 11|2059-05-04 01:02:00+08:00|2059-11-16 20:55:00+08:00|Standard Rotation|LEO||
|
|
启明空间站|1c346955-ba6b-4f54-9308-d088fa99f766|state|Expedition 12|Expedition 12|2059-11-16 16:00:00+08:00|2060-05-15 01:44:00+08:00|Standard Rotation|LEO||
|
|
启明空间站|7c74d703-98bc-486d-b06f-591f38661181|state|Expedition 13|Expedition 13|2060-05-12 15:40:00+08:00|2060-11-12 15:40:00+08:00|Standard Rotation|LEO||
|
|
启明空间站|3c81a7b5-4f86-4f48-aa6f-99dec955dc42|event|Reconfigure to 启明空间站|启明载人航天计划|2060-07-06 17:15:00+08:00|||LEO|准备进行空间站格局调整,利用现有基础设施构建启明空间站|
|
|
启明空间站|4d14317f-3e78-4e9e-9a9c-a9555ef15b24|state|启明空间站重力模块升级|启明载人航天计划|2060-07-06 20:40:00+08:00|2060-09-15 20:55:00+08:00|启明空间站重力模块升级|LEO|擎天E3发射,运送了全新的节点舱和人工重力模块,由Expedition 13乘组完成安装|
|