Files
ArmorandClaude Opus 4.7 e1d601a774 chore: add reference docs, scripts, tests, demo, prototypes
- Reference docs: known issues, user journey, location redesign, mission merge plan
- Scripts: fill_location_state, merge_missions, migrate_location, migrate_state
- Tests: e2e test suite, asset entries unit tests
- Demo: location board, hifi prototypes, test screenshots
- Data backup: asset log entries and state nodes
- Update .gitignore

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-06-01 15:29:47 +08:00

47 KiB

1assetidkindtitlemissionstartendstatelocationsummarynote
2Europa Outpostbf68c161-7303-44da-bf6e-72373d2e54d5stateEOCM-1 Outpost DeploymentEuropa Outpost Construction Mission 12057-02-27 08:00:00+08:002057-03-15 09:00:00+08:00Outpost ConstructionEuropa OutpostThe first crewed Europa construction campaign assembled the initial habitat, power spine, and life-support core.Backfilled from ST-01 EOCM-1 support logs.
3Europa Outpost53ee9bf9-27c3-47c2-94f3-656a8eea64f2eventEnter into ServiceEuropa Outpost Construction Mission 12057-03-15 09:00:00+08:00Europa OutpostEuropa Outpost entered operational service after the initial construction stack passed habitability review.User-provided milestone, consistent with ST-01 EOCM-1 operation window.
4Europa Outpost6ffeda07-93fb-4d17-9efc-817555771d35stateEOCM-1 Initial Outpost OperationsEuropa Outpost Construction Mission 12057-03-15 09:00:00+08:002057-10-01 08:00:00+08:00Outpost CommissioningEuropa OutpostThe outpost remained crewed while the first construction team brought core systems to sustained operational readiness.Backfilled from ST-01 EOCM-1 support logs.
5Europa Outpostd548ded1-232d-4e68-875b-290092c7c0b8stateAutonomous StandbyEuropa Outpost Construction Mission 12057-10-01 08:00:00+08:002058-01-19 08:00:00+08:00Autonomous StandbyEuropa OutpostAfter the first construction crew departed, Europa Outpost stayed in autonomous survival mode while awaiting the second construction mission.Bridging interval inferred from EOCM-1 return and EOCM-2 arrival windows.
6Europa Outpost83dcded1-c57c-49c8-b94b-5430c2fe4d4dstateEOCM-2 Outpost ExpansionEuropa Outpost Construction Mission 22058-01-19 08:00:00+08:002058-09-06 08:00:00+08:00Outpost ConstructionEuropa OutpostThe second construction campaign expanded the habitat ring, utility corridors, and long-duration expedition support spaces.Backfilled from ST-02 EOCM-2 support logs.
7Europa Outpost50c4b9a3-644d-4dd6-85c7-cd40f1d32667statePost-Construction ReadinessEuropa Outpost Construction Mission 22058-09-06 08:00:00+08:002058-09-25 08:00:00+08:00Autonomous StandbyEuropa OutpostEuropa Outpost remained uncrewed briefly after Construction Mission 2 while final expedition supplies were staged.Bridging interval inferred from ST-02 EOCM-2 departure and XH-01 EE-1 arrival.
8Europa Outpost188eb0ca-df35-4644-92d3-6952bae3dbe8eventEuropa Expedition 1 ArrivedEuropa Expedition 12058-09-25 10:00:00+08:00Europa OutpostEuropa Expedition 1 docked at the outpost and began the first standard long-duration occupation cycle.Backfilled from XH-01 EE-1 support logs.
9Europa Outpostf034826a-77fc-4070-84a6-0f419d0910bbstateEE-1 Surface OperationsEuropa Expedition 12058-09-25 10:00:00+08:002059-06-25 08:30:00+08:00Surface ExpeditionEuropa OutpostEuropa Expedition 1 occupied the outpost and supported early Jupiter system science operations based from Europa.Backfilled from XH-01 EE-1 Jupiter System Operations.
10Europa Outposta5da1a52-0c59-423a-b41e-2e646783bb67eventEuropa Expedition 2 ArrivedEuropa Expedition 22059-06-25 08:30:00+08:00Europa OutpostEuropa Expedition 2 arrived via ST-02 Kristen with 12 crew and 1 Echo Shuttle Block 1.User-provided crew manifest and arrival vehicle; consistent with ST-02 EE-2 arrival window.
11Europa Outpostf17eb842-8870-431d-9280-1b5fde97b48bstateEE-1/EE-2 Crew HandoffEuropa Expedition 1; Europa Expedition 22059-06-25 08:30:00+08:002059-06-25 16:00:00+08:00Crew Handoff; Surface ExpeditionEuropa OutpostEuropa Expedition 2 overlapped with Expedition 1 during crew transfer, cargo sorting, and outpost handover.Outpost-level handoff interval inferred from same-day EE-2 arrival and EE-1 departure notes.
12Europa Outposta51cd5a1-3ef1-430a-87f7-71ce9db44714stateEE-2 Surface OperationsEuropa Expedition 22059-06-25 16:00:00+08:002060-05-03 09:00:00+08:00Surface ExpeditionEuropa OutpostEuropa Expedition 2 assumed continuous occupation of the outpost after the first crew rotation completed.Backfilled from ST-02 EE-2 support logs.
13Europa Outpost906f6248-fd84-4211-a0eb-74c39e59ce86eventEuropa Expedition 1 DepartedEuropa Expedition 12059-06-25 16:00:00+08:00Europa OutpostEuropa Expedition 1 departed the outpost via Xihe Station with 9 crew and 1 Callisto MPV Block 1.User-provided departure note; treated as outpost departure milestone within XH-01 EE-1 broader return window.
14Europa Outpost15f8aae6-45f8-43d9-a3d6-9a2585ddeed2eventExpansion Module ArrivedEuropa Outpost Expansion Mission; Europa Expedition 22060-05-03 11:00:00+08:00Europa OutpostThe Europa Outpost expansion module arrived while Expedition 2 remained on station.User-provided date; consistent with Solar Shuttle 2 expansion delivery window at Europa.
15Europa Outpost82509df3-ad30-483f-a0f7-b05ff4497435stateEE-2 Operations with Expansion Module IntegrationEuropa Expedition 2; Europa Outpost Expansion Mission2060-05-03 11:00:00+08:002060-06-23 09:00:00+08:00Surface Expedition; Outpost ExpansionEuropa OutpostEuropa Expedition 2 supported installation and activation of the new expansion module after it reached the outpost.Backfilled from Solar Shuttle 2 expansion delivery and ST-02 EE-2 operation windows.
16Europa Outpostdb70ac3b-1035-4066-8e74-928e656bc39astateEE-2/EE-3 Crew HandoffEuropa Expedition 2; Europa Expedition 32060-06-23 09:00:00+08:002060-06-24 15:00:00+08:00Crew Handoff; Surface ExpeditionEuropa OutpostEuropa Expedition 3 overlapped with Expedition 2 during crew turnover and transfer of outpost responsibility.Outpost-level handoff interval inferred from user-provided EE-3 arrival and EE-2 departure dates.
17Europa Outpostd7a1d501-ed5f-4065-a773-aa4ef101dedeeventEuropa Expedition 3 ArrivedEuropa Expedition 32060-06-23 09:00:00+08:00Europa OutpostEuropa Expedition 3 arrived via XH-01 to begin the next outpost rotation.User-provided arrival date; treated as outpost arrival milestone within XH-01 EE-3 Jupiter System Operations.
18Europa Outpost8649cb17-0bcb-4ba4-9f91-e9c441ff9793eventEuropa Expedition 2 DepartedEuropa Expedition 22060-06-24 15:00:00+08:00Europa OutpostEuropa Expedition 2 departed the outpost via ST-02 Kristen after completing crew handoff to Expedition 3.User-provided departure date; treated as outpost departure milestone slightly ahead of ST-02 EE-2 system departure.
19Europa Outposta7c9d010-5aed-43fc-a744-1a86ad9b15c8stateEE-3 Surface OperationsEuropa Expedition 32060-06-24 15:00:00+08:00Surface ExpeditionEuropa OutpostEuropa Expedition 3 is the current resident crew. Crew status on 2060-06-24: 6 scientists at Lab, 2 medical at center hub, 1 commander and 1 pilot at observation station, 2 engineers at greenhouse.User-provided current crew distribution for 2060-06-24.
20JW-01 金乌一号5df95fe3-5f0d-4dc1-ad37-508adcf2eef2stateConstruction2058-03-14 16:00:00+08:002059-03-08 08:00:00+08:00ConstructionStar PortSolar Shuttle 1 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
21JW-01 金乌一号e306c665-07c0-46dc-8127-b96775d616b9stateAssembly Complete2059-03-08 08:00:00+08:002059-04-13 08:00:00+08:00Assembly CompleteLEOAssembly complete, preparing for commissioningTimeline.xlsx inferred monthly phase. Raw: Assembly Complete
22JW-01 金乌一号543dabdc-e61b-4a1c-8c4b-3e753d17cbbdstateTrial Run2059-04-13 08:00:00+08:002059-08-06 08:00:00+08:00Trial RunEarthTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
23JW-01 金乌一号b99062ea-4547-4cdc-8bf1-3b1f0c28a4bestateMars One Expansion OutboundMars One Expansion2059-08-06 08:00:00+08:002059-10-24 08:00:00+08:00TransferSunEarth-Mars transferTimeline.xlsx inferred monthly phase. Raw: Earth-Mars
24JW-01 金乌一号30930d1b-d32b-4ef6-97ae-6d11c777ad53stateMars One ExpansionMars One Expansion2059-10-19 08:00:00+08:002060-08-09 05:10:00+08:00Base ExpansionMarsMars One ExpansionTimeline.xlsx inferred monthly phase. Raw: Mars One Expansion
25JW-01 金乌一号00c8b5c6-e363-4aee-a768-2fc3fa7a0138stateMars ReturnMars One Expansion2060-08-09 05:10:00+08:002060-10-26 10:03:00+08:00TransferSunBack to Earth with QingtianCarrying Mars One component back
26Mars One Base97b3a860-03c6-4ca3-a9c8-f94fd05adbe0eventInitial Cargo LandedMars Mission Demo2054-08-23 10:30:00+08:00Mars One BaseCargo from Mars Mission Demo was landed at the future Mars One site for robotic setup.Backfilled from XH-01 Mars Mission Demo support logs.
27Mars One Basedc082672-52a2-4142-a2b8-737991ee542fstateMMD Surface ActivationMars Mission Demo2054-08-23 12:00:00+08:002055-07-30 08:00:00+08:00Surface ActivationMars One BaseRobotic systems activated the first surface power, comms, and cargo handling stack delivered by Mars Mission Demo.Backfilled from XH-01 Mars Mission Demo support logs.
28Mars One Base3141e93d-1e47-4264-864b-378815d8e871eventFirst Crewed LandingMars One Base Construction Mission 12055-07-30 09:30:00+08:00Mars One BaseThe first crewed Mars One construction team landed and began surface assembly.Backfilled from XH-01 MOCM-1 support logs.
29Mars One Base9399f5f6-9412-455f-8683-b237bcdeab7bstateMOCM-1 Initial ConstructionMars One Base Construction Mission 12055-07-30 10:00:00+08:002056-02-07 08:00:00+08:00Base ConstructionMars One BaseThe first crewed construction campaign assembled the core habitat, power systems, and ascent support infrastructure.Backfilled from XH-01 MOCM-1 support logs.
30Mars One Baseafe0f5fe-6909-4351-8003-b3f78e9145d1stateMOCM-1 Autonomous CommissioningMars One Base Construction Mission 12056-02-07 08:00:00+08:002056-07-03 08:00:00+08:00Autonomous StandbyMars One BaseAfter the first construction crew departed, the outpost remained in autonomous checkout ahead of the next build window.Bridging interval inferred from the first and second Mars One construction campaigns.
31Mars One Base0fd356d5-71ce-4219-a7fd-b9ff077f4f39stateMOCM-2 Base ConstructionMars One Construction Mission 22056-07-03 08:00:00+08:002056-09-15 08:00:00+08:00Base ConstructionMars One BaseMission 2 expanded the surface habitat and continued utility trenching and storage build-out.Backfilled from ST-01 MOCM-2 support logs.
32Mars One Based96bd772-45eb-4010-96c2-1c942f4efc96stateMOCM-2/MOCM-3 Crew HandoffMars One Construction Mission 2; Mars One Base Construction Mission 32056-09-15 08:00:00+08:002056-10-12 08:00:00+08:00Base Construction; Crew HandoffMars One BaseConstruction Mission 3 arrived before Mission 2 departed, enabling the first on-surface Mars One crew handoff.Backfilled from ST-01 MOCM-2 and XH-01 MOCM-3 support logs.
33Mars One Basea05e86bb-77e5-4b99-a7d2-16a1dc810150stateMOCM-3 Base ConstructionMars One Base Construction Mission 32056-10-12 08:00:00+08:002056-11-19 08:00:00+08:00Base ConstructionMars One BaseThe third construction campaign completed surface integration and prepared the outpost for continuous expedition occupancy.Backfilled from XH-01 MOCM-3 support logs.
34Mars One Base2b0a2dbf-3f28-449e-af86-75ebf87b408estateMOCM-3 and ME-1 Surface OperationsMars One Base Construction Mission 3; Mars Expedition 12056-11-19 08:00:00+08:002057-02-12 08:00:00+08:00Base Construction; Surface ExpeditionMars One BaseFinal construction work continued while Mars Expedition 1 began long-duration surface operations from the outpost.Overlap inferred from XH-01 MOCM-3 and ST-02 ME-1 support logs.
35Mars One Baseedfbaea5-331b-4a93-9458-044d3016eb7feventPhase 1 Construction CompleteMars One Base Construction Mission 3; Mars Expedition 12057-02-12 09:00:00+08:00Mars One BaseMars One entered sustained expedition service after the third construction wave wrapped up.Completion milestone inferred from XH-01 MOCM-3 return window.
36Mars One Basee8003196-d035-49be-a721-144fec91a678stateME-1 Surface OperationsMars Expedition 12057-02-12 09:00:00+08:002057-06-22 08:00:00+08:00Surface ExpeditionMars One BaseMars Expedition 1 operated the newly completed outpost and stabilized its life-support and logistics cadence.Backfilled from ST-02 ME-1 support logs.
37Mars One Basefb511ee5-3343-4884-a094-59241d1d28e0stateME-1/ME-2 Crew HandoffMars Expedition 1; Mars Expedition 22057-06-22 08:00:00+08:002057-09-08 08:00:00+08:00Surface Expedition; Crew HandoffMars One BaseMars Expedition 2 arrived while Expedition 1 completed return preparations, overlapping on the surface during handoff.Overlap inferred from ST-02 ME-1 and XH-01 ME-2 support logs.
38Mars One Base5109f226-b843-4173-97cf-bb3b740927edstateME-2 Surface OperationsMars Expedition 22057-09-08 08:00:00+08:002058-04-17 08:00:00+08:00Surface ExpeditionMars One BaseMars Expedition 2 took over continuous surface operations after the Expedition 1 crew departed.Backfilled from XH-01 ME-2 support logs.
39Mars One Base9c4ef55d-a472-4e19-b582-8f872e6c854astateME-2/ME-3 Crew HandoffMars Expedition 2; Mars Expedition 32058-04-17 08:00:00+08:002058-04-18 08:00:00+08:00Surface Expedition; Crew HandoffMars One BaseMars Expedition 3 overlapped briefly with Expedition 2 during the next surface crew handoff.Overlap inferred from XH-01 ME-2 return and XH-02 ME-3 arrival timing.
40Mars One Base66d8bc17-70e4-4c18-9c00-a8a2ffb4c1d3stateME-3 Surface OperationsMars Expedition 32058-04-18 08:00:00+08:002059-10-19 08:00:00+08:00Surface ExpeditionMars One BaseMars Expedition 3 sustained the base through the long pre-expansion interval and remained on Mars after XH-02 departed uncrewed.Backfilled from XH-02 ME-3 support logs and uncrewed return timing.
41Mars One Basefaf59da6-de11-4f77-892a-5483f17a30e0eventExpansion Cargo ArrivalMars One Expansion2059-10-19 09:00:00+08:00Mars One BaseSolar Shuttle 1 delivered the first Mars One expansion package to the surface site.Backfilled from Solar Shuttle 1 Mars One Expansion support logs.
42Mars One Base5112903a-12bb-4529-afa5-1e37eade53d3stateMars One Expansion and ME-3 Surface OperationsMars One Expansion; Mars Expedition 32059-10-19 09:00:00+08:002059-10-24 14:00:00+08:00Base Expansion; Surface ExpeditionMars One BaseExpansion work began while Mars Expedition 3 kept the outpost occupied ahead of the next crew arrival.Overlap inferred from Solar Shuttle 1 expansion and XH-02 ME-4 arrival windows.
43Mars One Basee890d519-64ac-4152-902f-42c69a553b84stateME-3/ME-4 Crew Handoff with Expansion PackageMars One Expansion; Mars Expedition 3; Mars Expedition 42059-10-24 14:00:00+08:002059-11-04 08:00:00+08:00Base Expansion; Crew HandoffMars One BaseMars Expedition 4 arrived with the expansion package while Mars Expedition 3 prepared for ascent and departure.Overlap inferred from XH-02 ME-4 Part 1, Solar Shuttle 1 expansion, and XH-02 ME-3 return timing.
44Mars One Base292bb2fc-4688-49e6-94e4-598da921d3e5stateMars One Expansion and ME-4 Surface OperationsMars One Expansion; Mars Expedition 42059-11-04 08:00:00+08:002060-02-23 08:00:00+08:00Base Expansion; Surface ExpeditionMars One BaseAfter Expedition 3 departed, Mars Expedition 4 continued surface operations alongside the active expansion campaign.Backfilled from XH-02 ME-4 and Solar Shuttle 1 expansion support logs.
45Mars One Base16e6a85a-2c04-4dc5-8132-b7cd16a104dastateExpansion, ME-4, and Rover DeliveryMars One Expansion; Mars Expedition 4; Mars One Rover Delivery2060-02-23 08:00:00+08:002060-05-23 08:00:00+08:00Base Expansion; Surface Expedition; Cargo DeliveryMars One BaseThe rover delivery campaign overlapped with base expansion and Expedition 4 surface operations.Overlap inferred from Solar Shuttle 3 rover delivery, Solar Shuttle 1 expansion, and XH-02 ME-4 support logs.
46Mars One Base8fc9c2b3-6272-44cb-a942-8bd4c83a6d05stateMars One Expansion and ME-4 Surface OperationsMars One Expansion; Mars Expedition 42060-05-23 09:30:00+08:002060-08-09 05:10:00+08:00Base Expansion; Surface ExpeditionMars One BaseExpansion work continued after rover deployment while Mars Expedition 4 remained the resident surface crew.Backfilled from Solar Shuttle 1 expansion and XH-02 ME-4 support logs.
47Mars One Base0d811cfd-1358-46de-b637-3d0b230da76eeventRover Deployment CompleteMars One Rover Delivery; Mars Expedition 42060-05-23 09:30:00+08:00Mars One BaseThe new Mars One surface rover entered service after the cargo delivery campaign wrapped up.Backfilled from Solar Shuttle 3 rover delivery support logs.
48Mars One Based86f43a9-ae09-4319-8905-98b35c1d585bstateME-4 Surface OperationsMars Expedition 42060-08-09 06:00:00+08:002060-10-30 08:00:00+08:00Surface ExpeditionMars One BaseAfter expansion wrapped up, Mars Expedition 4 continued normal surface operations from the upgraded outpost.Backfilled from XH-02 ME-4 support logs.
49Mars One Base1b798abc-10bb-40cc-a517-4593512b0495eventExpansion Phase CompleteMars One Expansion; Mars Expedition 42060-08-09 06:00:00+08:00Mars One BaseThe main Mars One expansion phase was completed and Solar Shuttle 1 departed on the return leg.Backfilled from Solar Shuttle 1 expansion return timing.
50Solar Shuttle 2d190cc9e-e230-4299-8f13-1bda0f6b1aacstateConstruction2058-09-17 16:00:00+08:002059-09-11 08:00:00+08:00ConstructionLEOSolar Shuttle 2 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
51Solar Shuttle 28e33ce9e-2409-4b1c-af09-6a931fbe2d49stateTrial Run2059-09-11 08:00:00+08:002059-12-01 08:00:00+08:00Trial RunEarthTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
52Solar Shuttle 25a2092a8-ddad-41b3-9819-fa52557332edstateEOEM OutboundEuropa Outpost Expansion Mission2059-12-09 08:00:00+08:002060-05-01 08:00:00+08:00TransferSun
53Solar Shuttle 2c0271f19-e604-4c15-9c00-7118fec1928estateEuropa Outpost Expansion MissionEuropa Outpost Expansion Mission2060-05-01 08:00:00+08:002060-05-06 07:25:00+08:00Outpost ExpansionEuropaEuropa Outpost Expansion Package delivered via Qingtian Cargo Spacecraft
54Solar Shuttle 2687615b6-144f-4fd5-b3ee-709e4eaea6aastateEOEM InboundEuropa Outpost Expansion Mission2060-05-06 07:25:00+08:002060-06-26 08:00:00+08:00TransferSun
55Solar Shuttle 3219355f0-1399-49af-b352-6728f0d4c82bstateConstruction2059-01-14 16:00:00+08:002059-12-14 08:00:00+08:00ConstructionStar PortSolar Shuttle 3 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
56Solar Shuttle 3aac31a1a-45c7-47f4-add3-fbfa30f9011fstateTrial Run2059-12-14 08:00:00+08:002060-02-20 08:00:00+08:00Trial RunEarthTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
57Solar Shuttle 37deb1192-d6f0-4635-9a6d-39ab0c2adcfestateMars One Rover DeliveryMars One Rover Delivery2060-02-23 08:00:00+08:002060-05-23 08:00:00+08:00Cargo DeliveryMarsMars One Rover DeliveryTimeline.xlsx inferred monthly phase. Raw: Mars One Rover Delivery
58Solar Shuttle 3d33a6759-0f54-4e71-909b-6d3916ca13dcstateMars Return2060-11-05 04:07:00+08:00TransferSun
59ST-01 万星源ae003c1f-f74e-459b-ade2-74fcdae48605stateConstruction2050-09-15 16:00:00+08:002054-04-28 16:00:00+08:00ConstructionLEOConstruction2050-09-15 First module delivered to LEO via Vulture Shuttle
602053-02-02 Assembly Halted
61ST-01 万星源105a5eac-4ca1-4a5a-a9ad-bc2278d46f01stateTrial Run2054-05-12 08:00:00+08:002054-08-22 08:00:00+08:00Trial RunLunar OrbitTrial Run before commissioning2054-05-12 Begin Trial Run in Earth Orbit, testing all systems
622054-08-22 Trial Run complete, all systems perform as expected. Including multiple run to GEO and Lunar Orbit before returning to LEO.
63ST-01 万星源f6ae082d-5c36-44f9-92da-d5e568a71feastateDeep Space Test Mission2054-09-07 08:00:00+08:002054-11-28 08:00:00+08:00Deep Space Test MissionEarth-Sun L2Uncrewed mission to Earth-Sun Lagrange Point 2 to test long-duration operations2054-09-07 Begin Deep Space Test Mission
642054-11-28 Test Mission Complete, all systems nominal. Returning to LEO.
65ST-01 万星源503a0035-1cd7-4e8e-9bc6-922c2e5c3171stateMaintenance before Commissioning2054-12-01 08:00:00+08:002055-02-28 08:00:00+08:00Maintenance before CommissioningLEO
66ST-01 万星源4bfddc84-dfec-43e3-b534-4fb798bcc73fstateISSEM-1 Mercury TransferInner Solar System Exploration Mission 12055-03-20 08:00:00+08:002055-04-17 08:00:00+08:00TransferSunEarth-Mecury transfer, using standard trajectory with 127km/s of departure burn2055-03-20 Picking up crew for Inner Solar System Exploration Mission 1
672055-03-22 Earth Departure for Mecury
682055-04-17 Mercury Arrival
69ST-01 万星源42698c8c-a1cc-4742-9885-7b9e650f9867stateISSEM-1 Mercury OperationsInner Solar System Exploration Mission 12055-04-18 08:00:00+08:002055-08-14 08:00:00+08:00Planetary OperationsMercuryFirst crewed mission to Mercury2055-04-17 Mercury Arrival
702055-04-18 Orbital Survey of Mercury begins
712055-06-14 First Crewed Surface Landing on Mercury
722055-06-15 EVA operations commence
732055-06-30 Surface operations complete, returning to orbit
742055-08-15 Departure from Mercury for Venus
75ST-01 万星源2adfa016-b23a-4459-af6e-a84da2aa2469stateISSEM-1 Venus TransferInner Solar System Exploration Mission 12055-08-15 08:00:00+08:002055-10-01 08:00:00+08:00TransferSunMecury-Venus transfer, using standard trajectory with 85km/s of departure burn2055-08-15 Departure from Mercury for Venus
762055-10-01 Venus Arrival
77ST-01 万星源f28469ee-1dbc-4232-98ff-91f7abcb9d59stateISSEM-1 Venus OperationsInner Solar System Exploration Mission 12055-10-01 08:00:00+08:002056-03-24 08:00:00+08:00Planetary OperationsVenusFirst crewed mission to Venus, no crewed landing attempted due to extreme surface conditions. Probe deployment only.2055-10-01 Venus Arrival
782055-10-02 Orbital Survey of Venus begins
792055-10-10 Landing Probe Deployment
802055-11-10 Begin Upper Atmosphere Survey via Callisto MPV
812056-03-24 Departure from Venus for Earth
82ST-01 万星源1f6e85aa-121a-4f47-95b6-35f040da055cstateISSEM-1 InboundInner Solar System Exploration Mission 12056-03-24 08:00:00+08:002056-04-12 08:00:00+08:00TransferSunVenus-Earth transfer, using standard trajectory with 75km/s of departure burn2056-03-24 Departure from Venus for Earth
832056-04-12 Earth Arrival
84ST-01 万星源540c146e-0d48-4735-8eb4-6fe08506b705stateMaintenance2056-04-15 08:00:00+08:002056-05-31 08:00:00+08:00MaintenanceLEO
85ST-01 万星源ffd625b0-0de4-4f47-8c8d-36669a1675f6stateMOCM-2 OutboundMars One Construction Mission 22056-06-02 08:00:00+08:002056-07-01 08:00:00+08:00TransferSunEarth-Mars transfer, using standard trajectory with 126km/s of departure burn2056-06-02 Picking up crew for Mars One Construction Mission 2
862056-06-04 Picking up Mars One construction cargo
872056-06-06 Earth Departure for Mars
882056-07-01 Mars Arrival, First crewed mission to Mars using Stellaria
89ST-01 万星源12059276-d10a-4a37-9b8c-6a6183768504stateMOCM-2 Mars OperationsMars One Construction Mission 22056-07-03 08:00:00+08:002056-10-12 08:00:00+08:00Base ConstructionMarsContinuing the construction of Mars One Base2056-07-03 Crew descend to Martian Surface, Continuing the construction of Mars One Base
902056-07-20 Heavy Cargo Delivery to Surface via Callisto MPV
912056-09-17 Mars One Construction Mission 3 Crew Arrival via XH-01, joining Stellaria crew. First Crew Handover on Mars.
922056-10-12 Mars One Construction Mission 2 Crew ascend to Stellaria
932056-10-15 Departure from Mars for Earth
94ST-01 万星源cf351aa5-4149-4938-939b-edcb846f4b14stateMOCM-2 InboundMars One Construction Mission 22056-10-15 08:00:00+08:002056-11-03 08:00:00+08:00TransferSunMars-Earth transfer, using Fast Return trajectory with 212km/s of departure burn2056-10-15 Departure from Mars for Earth
952056-11-03 Earth Arrival
96ST-01 万星源fd8fba0b-82bb-4ad3-bc38-58745291627bstateMaintenance2056-11-04 08:00:00+08:002056-12-10 08:00:00+08:00MaintenanceLEO
97ST-01 万星源7747339c-f602-4ddf-8511-6862006f789bstateEOCM-1 OutboundEuropa Outpost Construction Mission 12056-12-15 08:00:00+08:002057-02-25 08:00:00+08:00TransferSunEarth-Europa transfer, using standard trajectory with 165km/s of departure burn2056-12-15 Start preparations for Europa Outpost Construction Mission 1
982056-12-20 Europa Outpost Construction Package arrival via Qingtian Cargo Shuttle
992056-12-31 Picking up crew for Europa Outpost Construction Mission 1
1002057-01-02 Earth Departure for Europa
101ST-01 万星源545f687e-bd2c-409a-8fb8-186a6dead67estateEOCM-1 Europa OperationsEuropa Outpost Construction Mission 12057-02-27 08:00:00+08:002057-10-01 08:00:00+08:00Outpost ConstructionEuropaFirst crewed mission to Europa2057-02-27 Heavy Cargo Delivery to Surface via Qingtian Cargo Shuttle
1022057-03-15 Crew descend to Europan Surface, Beginning construction of Europa Outpost
1036 crewed ascend and descend operations to Europa Surface via Callisto MPV between 2057-03-15 and 2057-09-15
1042057-10-01 Europa Outpost Construction Mission 1 Crew ascend to Stellaria, wrapping up construction phase 1
1052057-10-04 Europa Departure for Earth
106ST-01 万星源43f2ece9-283b-4484-b838-d684b9ada4d6stateEOCM-1 return to EarthEuropa Outpost Construction Mission 12057-10-04 08:00:00+08:002057-12-20 08:00:00+08:00TransferEuropaEuropa-Earth transfer, using Fast trajectory with 216km/s of departure burn2057-10-04 Europa Departure for Earth
1072057-12-20 Earth Arrival
108ST-01 万星源7d6a56c8-9ebc-4940-813b-54ee2c9711f4stateMaintenance and Upgrades2058-01-05 08:00:00+08:002058-05-15 08:00:00+08:00Maintenance and UpgradesLEOExtensive overhauls to bring ST-01 closer to full Stellaria specifications. Add more greenhouse modules, upgrade life support systems, add another Rotating Habitat Ring
109ST-01 万星源cad8537e-1966-4b3c-abed-35c511950ac8stateSEM-1 outboundSaturn Exploration Mission 12058-06-01 08:00:00+08:002058-10-12 08:00:00+08:00TransferSunEarth-Saturn transfer, using Fast trajectory with 210km/s of departure burnFirst crewed mission to Saturn
110ST-01 万星源022b0296-5c1a-41f8-8634-97dc663b05d9stateSEM-1 Saturn OperationsSaturn Exploration Mission 12058-10-12 08:00:00+08:002059-07-01 08:00:00+08:00Planetary OperationsSaturn SystemFirst crewed mission to Saturn2059-05-31 Parked into Iapetus orbit, orbital science completed
1112059-06-15 Start Iapetus Surface operation
112ST-01 万星源f536e950-a024-45e3-95ff-da5f77772119stateSEM-1 InboundSaturn Exploration Mission 12059-07-01 08:00:00+08:002059-11-24 08:00:00+08:00TransferSunSaturn-Earth transfer, using standard trajectory with 162km/s of departure burn
113ST-01 万星源3fce336c-7ac9-4117-9239-bf939dfe1ad1stateMaintenance and Upgrades2059-11-25 08:00:00+08:002060-02-10 08:00:00+08:00Maintenance and UpgradesStar PortUpgrades complete, ST-01 now fully meets Stellaria specifications.
114ST-01 万星源8a9de074-6348-4190-bd27-e3bdeddb70f7stateOSSEM-1 OutboundOuter Solar System Exploration Mission 12060-02-11 08:00:00+08:002060-07-24 20:11:00+08:00TransferSun地球出发前往海王星23 crew on board
115ST-01 万星源18b3429e-28d3-489c-b65c-35e0e9775a0dstateOSSEM-1 Neptune ExplorationOSSEM-1; Neptune2060-07-25 06:40:00+08:00ExplorationNeptune
116ST-02 Kristeneefd7712-b6f4-496c-9bc8-8eb9546887b8stateConstruction2052-01-14 16:00:00+08:002053-02-10 08:00:00+08:00ConstructionLEOST-02 Kristen ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
117ST-02 Kristen721dec30-3c58-4885-8fda-22e2960ef4a0stateAssembly Halted2053-02-10 08:00:00+08:002053-05-12 08:00:00+08:00Assembly HaltedLEOAssembly halted pending redesign and program reviewTimeline.xlsx inferred monthly phase. Raw: Assembly Halted
118ST-02 Kristen8226a3aa-1896-42e2-9e5e-0fca750d229dstateReconfiguring to ST-022053-05-12 08:00:00+08:002055-10-13 08:00:00+08:00Reconfiguring to ST-02LEOVehicle reconfiguration and systems integrationTimeline.xlsx inferred monthly phase. Raw: Reconfiguring to ST-02
119ST-02 Kristen826e67d8-e876-41e5-9551-a80f700e90cdstateTrial Run2055-10-13 08:00:00+08:002056-03-10 08:00:00+08:00Trial RunLunar OrbitTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
120ST-02 Kristenb5a01aed-7a98-4f81-a84f-efb59b8f2479stateDeep Space Test Mission2056-03-10 08:00:00+08:002056-06-08 08:00:00+08:00Deep Space Test MissionEarth-Sun L2Uncrewed Mission to Earth-Sun L2Timeline.xlsx inferred monthly phase. Raw: Deep Space Test Mission / Uncrewed Mission to Earth-Sun L2
121ST-02 Kristen7b7fd38f-2647-4ed8-b1bc-27e94861b15dstateMaintenance2056-06-08 08:00:00+08:002056-11-19 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
122ST-02 Kristenca8f8223-800b-4562-8405-a270d3960a6estateME-1 Mars OperationsMars Expedition 12056-11-19 08:00:00+08:002057-09-08 08:00:00+08:00Planetary OperationsMarsMars Expedition 1Timeline.xlsx inferred monthly phase. Raw: Mars Expedition 1
123ST-02 Kristena7c43eae-31fc-451d-8bbc-fd6f3da63f22stateMaintenance2057-09-08 08:00:00+08:002057-10-06 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
124ST-02 Kristena61ee6fc-5495-4b5b-a505-968669b81b18stateEOCM-2 OutboundEuropa Outpost Construction Mission 22057-10-06 08:00:00+08:002058-01-19 08:00:00+08:00TransferSunEarth-Europa transferTimeline.xlsx inferred monthly phase. Raw: Earth-Europa
125ST-02 Kristenfb17cab1-dcbc-4814-83e9-5fb81a73f869stateEOCM-2 Europa OperationsEuropa Outpost Construction Mission 22058-01-19 08:00:00+08:002058-09-06 08:00:00+08:00Outpost ConstructionEuropaEuropa Outpost Construction Mission 2Timeline.xlsx inferred monthly phase. Raw: Europa Outpost Construction Mission 2
126ST-02 Kristenefdb28dd-3e02-4b16-80e8-7a2d4df76825stateEOCM-2 InboundEuropa Outpost Construction Mission 22058-09-06 08:00:00+08:002058-11-08 08:00:00+08:00TransferSunEuropa-Earth transferTimeline.xlsx inferred monthly phase. Raw: Europa-Earth
127ST-02 Kristen77c71061-354d-4045-b5cd-5cd6b1e8dd65stateMaintenance and Upgrades2058-11-08 08:00:00+08:002059-04-06 08:00:00+08:00Maintenance and UpgradesLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance and Upgrades
128ST-02 Kristenfe21560f-60f4-48bb-bbdb-e2c1ab6fe3afstateEE-2 OutboundEuropa Expedition 22059-04-06 08:00:00+08:002059-06-25 08:00:00+08:00TransferSunEarth-Europa transfer
129ST-02 Kristen65910288-0c2a-4800-bfce-39495efafce2stateEE-2 Europa OperationsEuropa Expedition 22059-06-25 08:00:00+08:002060-06-28 02:47:00+08:00Planetary OperationsEuropaSupporting Europa Expedition 2
130ST-02 Kristene77cd6b5-a2e2-479b-817b-67c1c59bfdeestateEE-2 InboundEuropa Expedition 22060-06-28 02:47:00+08:002060-08-30 06:11:00+08:00TransferSun
131ST-02 Kristen6c7a8724-1324-4a68-81e1-3dc2ce1ce980stateUpgrade to Stellaria Class2060-08-30 07:26:00+08:002061-06-30 08:00:00+08:00UpgradeStar Ring StationA full overhaul to bring ST-02 to full Stellaria standard
132ST-03 Muelsyse10030cb4-2626-483a-8682-db9eed90da71stateConstruction2056-02-13 16:00:00+08:002059-07-07 08:00:00+08:00ConstructionLEOST-03 Muelsyse ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
133ST-03 Muelsyse520e5ad4-e79c-458d-8387-76ba0a120b2estateAssembly Complete2059-07-07 08:00:00+08:002059-08-12 08:00:00+08:00Assembly CompleteLEOAssembly complete, preparing for commissioningTimeline.xlsx inferred monthly phase. Raw: Assembly Complete
134ST-03 Muelsyse068b82d8-e107-465b-98b8-eba39739ee63stateTrial Run2059-08-12 08:00:00+08:002060-03-07 08:00:00+08:00Trial RunLunar OrbitTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
135ST-03 Muelsyse16e6ce3d-d2ef-4910-a1ff-4670cbb63fb7stateMaintenance2060-03-07 08:00:00+08:002060-06-10 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
136ST-03 Muelsysee61bb0d2-ab64-4f79-a18a-77dea92eb3abstateDeep Space Test2060-06-15 08:00:00+08:002060-09-10 08:00:00+08:00Deep Space TestSun-Earth L2
137ST-03 Muelsyse2f391faf-4061-45cc-bcd5-ce5956cff9bdstatePre-commissioning Maintenance2060-09-10 08:00:00+08:002060-10-25 08:00:00+08:00MaintenanceLEO
138ST-04b5fceb9b-264c-4842-a329-0a7c4ccc9779stateConstruction2059-07-12 16:00:00+08:002063-01-07 08:00:00+08:00ConstructionLEOST-04 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
139ST-044dfd3584-ad5c-4d6d-9c86-d337d627fb9estateAssembly Complete2063-01-07 08:00:00+08:002063-02-12 08:00:00+08:00Assembly CompleteLEOAssembly complete, preparing for commissioningTimeline.xlsx inferred monthly phase. Raw: Assembly Complete
140ST-0493f7700f-d0be-48a9-8fdf-f1d0a824ac86stateTrial Run2063-02-12 08:00:00+08:002063-09-06 08:00:00+08:00Trial RunLunar OrbitTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
141ST-04c6ac0899-e235-4de6-8a9e-89ff98e725fastateMaintenance2063-09-06 16:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
142XH-01 羲和1934e3f4-0d0c-4699-b4bd-753744ab29a1stateConstruction2050-03-16 00:00:00+08:002052-02-07 00:00:00+08:00ConstructionLEOXihe XH-01 Construction2050-03-15 First module delivered to LEO via Vulture Shuttle
1432052-02-06 Assembly completed in LEO
144XH-01 羲和a0a3bed9-91a2-45c7-be54-7216e33f87b3stateFitting2052-02-07 08:00:00+08:002052-05-31 08:00:00+08:00FittingLEO
145XH-01 羲和8ee54d7e-4310-43dc-a703-f633c1013405stateTrial Run2052-06-01 08:00:00+08:002052-11-30 08:00:00+08:00Trial RunEarthTrial Run before commissioning2052-06-01 Begin Trial Run in Earth Orbit, testing all systems
1462052-11-30 Trial Run complete, all systems perform as expected. Including multiple run to GEO and Lunar Orbit before returning to LEO.
147XH-01 羲和4464a892-910e-416c-b044-0683b6516003stateMaintenance2052-12-01 08:00:00+08:002053-01-05 08:00:00+08:00MaintenanceEarth
148XH-01 羲和d103bc92-da3a-4ba6-965e-a9385e208581stateDeep Space Test Mission2053-01-12 08:00:00+08:002053-12-18 08:00:00+08:00Deep Space Test MissionEarth-Sun L2Long term uncrewed test2053-01-12 Uncrewed mission to Earth-Sun L2 point to test deep space operations
1492053-12-18 Back to LEO
150XH-01 羲和80931042-da68-435b-94f5-da2d1b79e801stateMaintenance and Upgrades2054-01-07 08:00:00+08:002054-06-28 08:00:00+08:00Maintenance and UpgradesLEO
151XH-01 羲和e54817e0-6809-404d-be62-c6017d143362stateMMD OutboundMars Mission Demo2054-07-10 08:00:00+08:002054-08-21 08:00:00+08:00TransferSunEarth-Mars transfer, Uses standard trajectory with 102km/s of departure burn
152XH-01 羲和23b4304f-8fca-4d78-8a93-c9f78fab51e0stateMMD Mars OperationsMars Mission Demo2054-08-21 08:00:00+08:002055-01-10 08:00:00+08:00Planetary OperationsMarsUncrewed, Deliver the first Mars-One base construction equipment package to Mars orbit.2054-08-21 Mars Orbit Arrival, deploy equipment package to Mars surface via lander
1532055-01-10 Mars Departure, return to Earth
154XH-01 羲和ded06cd6-f9a4-4646-9be4-2f01cf067334stateMMD InboundMars Mission Demo2055-01-10 08:00:00+08:002055-02-28 08:00:00+08:00TransferSunUses standard trajectory with 97km/s of departure burn2055-02-28 Earth Arrival, demo run complete, all systems perform as expected.
155XH-01 羲和fecc4450-ba77-4bc6-b794-164766a0c8b8stateMaintenance and Upgrades2055-03-01 08:00:00+08:002055-05-14 08:00:00+08:00Maintenance and UpgradesLEO
156XH-01 羲和aab3125c-c99e-4af5-ab64-ffe7fda48ad7stateMOCM-1 OutboundMars One Base Construction Mission 12055-06-15 08:00:00+08:002055-07-30 08:00:00+08:00TransferSunEarth-Mars transfer, Uses standard trajectory with 115km/s of departure burn2055-06-15 Picking up crew for Mars One base Construction Mission 1
1572055-06-18 Earth Departure for Mars
158XH-01 羲和ec34d68b-4728-42eb-af79-b3e8805aa253stateMOCM-1 Mars OperationsMars One Base Construction Mission 12055-07-30 08:00:00+08:002056-02-07 08:00:00+08:00Base ConstructionMarsFirst Crewed mission to Mars. Construction for Mars One base begin2055-07-30 Mars Arrival, begin base construction
1592056-02-07 Mars Departure, return to Earth. First to use quick return trajectory.
160XH-01 羲和bdf99335-d329-4bd2-8e17-27ac1f097ca9stateMOCM-1 InboundMars One Base Construction Mission 12056-02-07 08:00:00+08:002056-03-18 08:00:00+08:00TransferSunMars-Earth transfer. Uses Fast-travel trajectory with 207km/s of departure burn2056-03-18 Earth Arrival, crew return
161XH-01 羲和8e1be891-57ec-4551-b114-232f4681b2b1stateMaintenance and Upgrades2056-03-25 08:00:00+08:002056-06-20 08:00:00+08:00Maintenance and UpgradesLEO
162XH-01 羲和ea2024c5-95e6-4acc-a88d-998183a35a5astateMOCM-3 OutboundMars One Base Construction Mission 32056-07-30 08:00:00+08:002056-09-15 08:00:00+08:00TransferSunEarth-Mars transfer. Uses standard trajectory with 95km/s of departure burn2056-07-30 Picking up crew for Mars One base Construction Mission 3
1632056-08-02 Earth Departure for Mars
164XH-01 羲和fd22c4b2-4938-4c01-ae92-e84f14d8b8ddstateMOCM-3 OperationsMars One Base Construction Mission 32056-09-15 08:00:00+08:002057-02-12 08:00:00+08:00Base ConstructionMarsThird Mars One base construction. First crew hand-off on Mars(with Mars One base construction 2).2056-09-15 Mars Arrival, continue base construction
1652057-02-12 Mars Departure, return to Earth.
166XH-01 羲和e5f549b9-0446-48be-a606-d9c1ada664b7stateMOCM-3 InboundMars One Base Construction Mission 32057-02-12 08:00:00+08:002057-03-25 08:00:00+08:00TransferSunMars-Earth transfer. Uses standard trajectory with 122km/s of departure burn2037-03-25 Earth Arrivasl, crew return
167XH-01 羲和6d57910a-7459-4b74-b0ea-e10ee7cab87bstateMaintenance2057-03-26 08:00:00+08:002057-04-25 08:00:00+08:00MaintenanceLEO
168XH-01 羲和30c84287-e5d1-473c-93fb-9d36d426516estateME-2 OutboundMars Expedition 22057-05-05 08:00:00+08:002057-06-22 08:00:00+08:00TransferSunEarth-Mars transfer using standard trajectory with 110km/s of departure burn2027-05-05 Picking up crew for Mars Expedition 2
1692027-05-09 Earth Departure for Mars
170XH-01 羲和7f5da9b3-94fa-4bd5-a6bd-94f6841c71a2stateME-2 Mars OperationsMars Expedition 22057-06-22 08:00:00+08:002058-04-18 08:00:00+08:00Planetary OperationsMarsSecond long term Mars Expedition, first mission to Mars One base after the construction is completed.
171First mission involving space tourism to Mars.2057-06-22 Mars Arrival
1722057-06-25 Mars EDL and surface operations begin
1732058-04-10 Begin Mars Departure preparations
1742058-04-18 Mars Departure for Earth
175XH-01 羲和058bbf6d-5c51-49c4-8516-8b6931db53c1stateME-2 InboundMars Expedition 22058-04-18 08:00:00+08:002058-05-20 08:00:00+08:00TransferSunMars-Earth transfer using standard trajectory with 115km/s of departure burn2058-04-18 Mars Departure for Earth
1762058-05-20 Earth Arrival, crew return
177XH-01 羲和161bb9f0-3d2a-46da-9044-9184e0704413stateMaintenance2058-05-21 08:00:00+08:002058-06-18 08:00:00+08:00MaintenanceLEO
178XH-01 羲和4ff368c4-503b-42ce-9e82-b4da291d3203stateEE-1 OutboundEuropa Expedition 12058-07-10 08:00:00+08:002058-09-25 08:00:00+08:00TransferSunEarth-Jupiter transfer using standard trajectory with 160km/s of departure burn2058-07-10 Picking up crew for Europa Expedition 1
1792058-07-12 Earth Departure for Jupiter system
1802058-09-25 Europa Arrival
181XH-01 羲和f01bfb99-f981-45f6-808b-7c5222503715stateEE-1 Jupiter System OperationsEuropa Expedition 12058-09-25 08:00:00+08:002059-07-10 08:00:00+08:00Planetary OperationsJupiter SystemFirst standard crew expedition to Europa Outpost to begin exploration of Jupiter system
182Long term surface operation at Europa Outpost, followed by exploration of IO and Ganymede2058-09-25 Europa Arrival
1832058-09-27 Europa descend, begin surface operation at Europa Outpost
1842058-12-15 Europa ascend, begin Jupiter system exploration
1852058-12-20 Begin IO exploration
1862059-01-20 Return to Europa Outpost
1872059-06-20 Begin Europa Outpost departure preparations
1882059-06-25 Europa Expedition 1 crew ascend from Europa Outpost
1892059-07-05 begin Ganymede exploration
1902059-07-10 Departure for Earth, upgrade planned.
191XH-01 羲和92315017-7011-4930-aabb-d00a6f3f4994stateEE-1 InboundEuropa Expedition 12059-07-10 08:00:00+08:002059-11-15 08:00:00+08:00TransferSunUses standard trajectory with 112km/s of departure burn
192Parked to Star Port2059-07-10 Departure for Earth.
1932059-11-15 Earth Arrival, Park to Star Port.
194XH-01 羲和21a37859-aa16-4c29-b17a-8012f6037478stateMaintenance and Upgrades2059-11-16 08:00:00+08:002060-02-19 08:00:00+08:00Maintenance and UpgradesStar PortGreenhouse upgrade to support long term deep space missions
195XH-01 羲和ee52cc53-7d9c-4134-ba1b-4f7cfb8fdce9stateEE-3 OutboundEuropa Expedition 32060-02-20 08:00:00+08:002060-05-01 08:00:00+08:00TransferSunUses standard trajectory with 163km/s of departure burn2060-02-20 Picking up Europa Expedition 3 crew, On its way to explore Jupiter systems before sending crew to Europa Outpost
196XH-01 羲和91d4948a-ae04-43a8-ac3b-def9caecc8e5stateEE-3 Jupiter System OperationsEuropa Expedition 32060-05-01 08:00:00+08:00Jupiter Exploration; Outpost RotationJupiter SystemCrew Rotation to Euorpa Outpost. First to explore Jupiter's moons, then to Europa Outpost2060-05-01 Jupiter Arrival
1972060-05-02 Io Arrival
1982060-05-07 Io descend
1992060-05-09 Io departure
2002060-05-11 Ganymede Arrival
2012060-05-12 Ganymede descend
2022060-05-21 Ganymede Departure for Callisto
2032060-05-25 Callisto Arrival
204XH-02 太白4958ffd7-2e23-40a6-9b96-e46c61943028stateConstruction2054-12-11 08:00:00+08:002056-10-04 08:00:00+08:00ConstructionLEOXH-02 太白 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
205XH-02 太白b99a2638-7560-45ec-9328-6a4a0e4cf685stateAssembly Complete2056-10-04 08:00:00+08:002056-11-11 08:00:00+08:00Assembly CompleteLEOAssembly complete, preparing for commissioningTimeline.xlsx inferred monthly phase. Raw: Assembly Complete
206XH-02 太白6ec7033c-e711-4148-ab7d-e075f3288021stateTrial Run2056-11-11 08:00:00+08:002057-03-12 08:00:00+08:00Trial RunEarthTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
207XH-02 太白669a993c-fe3d-4126-b066-2650e98dfb3estateMaintenance2057-03-12 08:00:00+08:002057-04-25 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
208XH-02 太白7c166ff7-df3b-495d-a7df-9b99949e23f0stateAEM OutboundAsteroid Exploration Mission2057-05-04 08:00:00+08:002057-07-17 08:00:00+08:00TransferSunEarth-Vesta transferTimeline.xlsx inferred monthly phase. Raw: Earth-Vesta
209XH-02 太白99eb75ba-e02b-4cdc-a5f1-3ea547cc7d4astateAEM Vesta OperationsAsteroid Exploration Mission2057-07-17 08:00:00+08:002058-01-04 08:00:00+08:00Asteroid OperationsVestaAsteroid exploration mission at VestaTimeline.xlsx inferred monthly phase. Raw: Vesta Mission
210XH-02 太白d74dfb61-fd3a-492c-b019-253ec9cd826dstateAEM InboundAsteroid Exploration Mission2058-01-04 08:00:00+08:002058-04-17 08:00:00+08:00TransferSunVesta-Earth transferTimeline.xlsx inferred monthly phase. Raw: Vesta-Earth
211XH-02 太白956cc319-668e-45d1-ab7c-9f0aa408c5f7stateME-3 Mars OperationsMars Expedition 32058-04-17 08:00:00+08:002059-05-04 08:00:00+08:00Planetary OperationsMarsMars Expedition 3Timeline.xlsx inferred monthly phase. Raw: Mars Expedition 3
212XH-02 太白f43aa249-80d1-426c-9aca-a341411be98dstateUncrewed InboundMars Expedition 32059-05-04 08:00:00+08:002059-07-06 08:00:00+08:00TransferSunUncrewed Inbound for TH-02. Mars Expedition 3 Crew remaining on Mars
213XH-02 太白2ae7438b-a2a2-44ee-a084-a76bc1e94114stateMaintenance2059-07-06 08:00:00+08:002059-08-04 08:00:00+08:00MaintenanceStar PortTimeline.xlsx inferred monthly phase. Raw: Maintenance
214XH-02 太白fcb05995-823e-4a63-9cf8-44ea953e2e9astateME-4 OutboundMars Expedition 42059-08-04 08:00:00+08:002059-10-24 08:00:00+08:00TransferSunEarth-Mars transferCarrying Mars Expedition 4 crew and Mars One Expansion Package to Mars
215XH-02 太白c00366fd-6b1d-46e0-8163-4bd6b510f374stateME-4 Mars Operations Part 1Mars Expedition 42059-10-24 14:00:00+08:002059-11-04 08:00:00+08:00Planetary OperationsMarsME-4 Crew to Mars One with Mars One Expansion Package. Mars Expedition 3 ascend.
216XH-02 太白33a45210-3497-4826-ba6e-291b384ebe7estateME-3 InboundMars Expedition 32059-11-04 08:00:00+08:002060-01-06 08:00:00+08:00TransferSunCarrying ME-3 Crew home
217XH-02 太白5562aa60-8d62-4ed9-b1cc-51ff99c49d18stateMaintenance2060-01-06 08:00:00+08:002060-02-17 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
218XH-02 太白76cd99ba-c259-4969-a8ae-2fa14e303974stateUncrewed OutboundMars Expedition 42060-01-22 08:00:00+08:002060-02-27 08:00:00+08:00TransferSun
219XH-02 太白c7e777fd-c7d8-4d01-be07-871862829983stateME-4 Mars Operations Part 2Mars Expedition 42060-02-28 08:00:00+08:002060-10-30 08:00:00+08:00Planetary OperationsMarsUncrewed Mars mission segmentTimeline.xlsx inferred monthly phase. Raw: Uncrewed to Mars, Mars Expedition 4 Part 2
220XH-03 常曦505255ab-902e-4586-9905-8ecad10353e7stateConstruction2058-02-15 16:00:00+08:002059-12-09 08:00:00+08:00ConstructionLEOXH-03 常曦 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
221XH-03 常曦b0848762-4f30-45fa-9e5f-5e53a0a7aba3stateAssembly Complete2059-12-09 08:00:00+08:002060-01-14 08:00:00+08:00Assembly CompleteLEOAssembly complete, preparing for commissioningTimeline.xlsx inferred monthly phase. Raw: Assembly Complete
222XH-03 常曦b87ea1ef-b240-48f7-aba8-0af7566bd6bestateTrial Run2060-01-14 08:00:00+08:002060-06-09 08:00:00+08:00Trial RunEarthTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
223XH-03 常曦bdc91489-7c65-45c2-bd78-4a37edc9dd4estateMaintenance2060-06-09 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
224XH-0486055939-185d-476b-afc5-1a60a69a1ccbstateConstruction2059-09-16 16:00:00+08:002061-08-10 08:00:00+08:00ConstructionLEOXH-04 ConstructionTimeline.xlsx inferred monthly phase. Raw: Construction
225XH-04d9b91820-7ea9-4f79-bca6-1fd450862c17stateAssembly Complete2061-08-10 08:00:00+08:002061-09-15 08:00:00+08:00Assembly CompleteLEOAssembly complete, preparing for commissioningTimeline.xlsx inferred monthly phase. Raw: Assembly Complete
226XH-04952a415e-408b-42a4-8dd8-24940e745d65stateTrial Run2061-09-15 08:00:00+08:002062-02-10 08:00:00+08:00Trial RunEarthTrial Run before commissioningTimeline.xlsx inferred monthly phase. Raw: Trial Run
227XH-0485aa5084-4c7a-4863-8bcc-ee9238d95d2cstateMaintenance2062-02-10 08:00:00+08:00MaintenanceLEOTimeline.xlsx inferred monthly phase. Raw: Maintenance
228启明空间站00aec49b-6dc1-4b58-bbf1-96086b93ff0estateExpedition 11Expedition 112059-05-04 01:02:00+08:002059-11-16 20:55:00+08:00Standard RotationLEO
229启明空间站1c346955-ba6b-4f54-9308-d088fa99f766stateExpedition 12Expedition 122059-11-16 16:00:00+08:002060-05-15 01:44:00+08:00Standard RotationLEO
230启明空间站7c74d703-98bc-486d-b06f-591f38661181stateExpedition 13Expedition 132060-05-12 15:40:00+08:002060-11-12 15:40:00+08:00Standard RotationLEO
231启明空间站3c81a7b5-4f86-4f48-aa6f-99dec955dc42eventReconfigure to 启明空间站启明载人航天计划2060-07-06 17:15:00+08:00LEO准备进行空间站格局调整,利用现有基础设施构建启明空间站
232启明空间站4d14317f-3e78-4e9e-9a9c-a9555ef15b24state启明空间站重力模块升级启明载人航天计划2060-07-06 20:40:00+08:002060-09-15 20:55:00+08:00启明空间站重力模块升级LEO擎天E3发射,运送了全新的节点舱和人工重力模块,由Expedition 13乘组完成安装