docs: update wiki pages, draft board location hierarchy, log book data
- Expand location hierarchy in draft_board.md to 72 items across all systems - Update ST-01/ST-02/XH-01/XH-02/XH-03/Xihe wiki pages (zh + en) - Update log_book.xlsx state node detail data for XH-01 and ST-01 missions Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
This commit is contained in:
@@ -103,31 +103,47 @@
|
||||
<table>
|
||||
<thead><tr><th>No.</th><th>Date</th><th>Mission</th><th>Orbiter</th><th>Primary module(s)</th><th>Notes</th></tr></thead>
|
||||
<tbody>
|
||||
<tr><td>1</td><td>2052-01-14</td><td>VLT-661</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">Loyalty</a> (uncrewed)</td><td>Forward docking hub + command center</td><td>Final Vulture Block 1 uncrewed first launch; orbiter remained as assembly platform</td></tr>
|
||||
<tr><td>2</td><td>2052-04-01</td><td>VLT-685</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">Perseverance</a> (crewed)</td><td>Static habitation module + initial truss</td><td>--</td></tr>
|
||||
<tr><td>3</td><td>2052-07-15</td><td>VLT-708</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">Courage</a> (crewed)</td><td>Central docking hub</td><td>--</td></tr>
|
||||
<tr><td>4</td><td>2052-10-01</td><td>VLT-725</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">Determination</a> (crewed)</td><td>Greenhouse module</td><td>--</td></tr>
|
||||
<tr><td>5</td><td>2052-12-15</td><td>VLT-741</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">Endurance</a> (crewed)</td><td>Main storage module + truss extension</td><td>Final orbiter relay. Construction halted thereafter</td></tr>
|
||||
<tr><td>1</td><td>2052-01-14</td><td>VLT-661</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-07 Loyalty</a> (uncrewed)</td><td>Forward docking hub + command center</td><td>Final Vulture Block 1 uncrewed first launch; orbiter remained as assembly platform</td></tr>
|
||||
<tr><td>2</td><td>2052-04-01</td><td>VLT-685</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-02 Perseverance</a> (crewed)</td><td>Static habitation module + initial truss</td><td>--</td></tr>
|
||||
<tr><td>3</td><td>2052-07-15</td><td>VLT-708</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-03 Courage</a> (crewed)</td><td>Central docking hub</td><td>--</td></tr>
|
||||
<tr><td>4</td><td>2052-10-01</td><td>VLT-725</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-04 Determination</a> (crewed)</td><td>Greenhouse module</td><td>--</td></tr>
|
||||
<tr><td>5</td><td>2052-12-15</td><td>VLT-741</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-01 Endurance</a> (crewed)</td><td>Main storage module + truss extension</td><td>Final orbiter relay. Construction halted thereafter</td></tr>
|
||||
</tbody></table>
|
||||
|
||||
<p>On 2053-02-10, the same strategic decision that affected ST-01 was applied to this vessel: rather than completing it as a standard Xihe-class mothership, it was transferred to the Stellaria Program to be equipped with the lightspeed engine. Construction was formally halted. Three months later (2053-05-12 -- just one day after ST-01's transfer), the hull was officially transferred to the Stellaria Program and entered the reconfiguration phase.</p>
|
||||
|
||||
<h3 id="reconfiguration-stellaria-class-second-ship">Reconfiguration: Stellaria-class second ship (2053-2055)</h3>
|
||||
<p>Kristen's reconfiguration commenced on 2053-05-12 at <a href="/home/Stations/Star_Port_Station">Star Port Station</a>, lasting approximately 884 days and completing on 2055-10-13. This was the longest reconfiguration phase of any mothership -- approximately 2.5 times ST-01's 352 days. Three primary factors account for this difference:</p>
|
||||
<p>Kristen's reconfiguration commenced on 2053-05-12 in low Earth orbit, lasting approximately 884 days and completing on 2055-10-13. This was the longest reconfiguration phase of any mothership -- approximately 2.5 times ST-01's 352 days. Three primary factors account for this difference:</p>
|
||||
<ul>
|
||||
<li><b>Lower initial completion level</b>: Kristen had fewer modules installed when construction halted in February 2053, requiring approximately 2-3 Xihe-standard modules to be backfilled (including the artificial-gravity habitation ring and propulsion module base structure) before the lightspeed engine could be installed.</li>
|
||||
<li><b>Resource prioritization</b>: During 2053-2054, the Stellaria Program's engineering resources and Qingtian cargo ship capacity were prioritized toward ST-01's reconfiguration to ensure the lead ship completed as early as possible. Kristen's reconfiguration only accelerated fully after ST-01's completion in April 2054.</li>
|
||||
<li><b>Lower initial completion level</b>: Kristen had fewer modules installed when construction halted in February 2053 (roughly 6-7 modules vs. ST-01's 9), requiring approximately 2-3 Xihe-standard modules to be backfilled (including the artificial-gravity habitation ring and propulsion module base structure) before the lightspeed engine could be installed.</li>
|
||||
<li><b>Resource prioritization</b>: During 2053-2054, the <a href="/home/Space_Shuttles/Vulture_Shuttle">Vulture Shuttle</a> fleet's resources were prioritized toward ST-01's reconfiguration to ensure the lead ship completed as early as possible. Kristen's reconfiguration only received sufficient orbiter resources and entered its full acceleration phase after ST-01's completion in April 2054.</li>
|
||||
<li><b>Lead-ship lessons learned</b>: The engineering team deliberately leveraged ST-01's reconfiguration and trial-run data to optimize the lightspeed engine installation process, propulsion control interfaces, and Xihe/Stellaria system integration approach on Kristen.</li>
|
||||
</ul>
|
||||
<p>Reconfiguration work was supported by <a href="/home/Cargo_Ships/Qingtian">Qingtian cargo ships</a> (LEO upmass capacity approximately 150 t) for large-module transport, with Star Port Station's resident engineering teams conducting orbital installation and testing. As with ST-01, the core change of this reconfiguration was the installation of the lightspeed engine -- all other systems remained at Xihe-class standards.</p>
|
||||
<p>As with the initial construction phase, all reconfiguration work was carried out by <a href="/home/Space_Shuttles/Vulture_Shuttle">Vulture Shuttles</a> (Block 1.5, 24 flights/year per orbiter). Kristen's reconfiguration proceeded in two phases: Phase 1 (May 2053 to April 2054) focused on backfilling missing Xihe-standard modules at a slower pace with only 2 launches, as ST-01's reconfiguration took priority; Phase 2 (April 2054 to October 2055), after ST-01's completion freed up orbiter resources, accelerated to 6 launches. The reconfiguration totaled 8 Vulture launches -- more than ST-01's 5 reconfiguration launches, compensating for the module shortfall from the shorter initial construction phase. The following table records the key launches:</p>
|
||||
<table>
|
||||
<thead><tr><th>No.</th><th>Date</th><th>Mission</th><th>Orbiter</th><th>Primary payload</th><th>Notes</th></tr></thead>
|
||||
<tbody>
|
||||
<tr><td colspan="6"><b>Phase 1: Backfill missing modules (2053-2054, concurrent with ST-01 reconfiguration, resource-constrained)</b></td></tr>
|
||||
<tr><td>1</td><td>2053-08-15</td><td>VLT-778</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-04 Determination</a> (crewed)</td><td>Propulsion module base structure</td><td>Backfill of Xihe-standard propulsion base, providing structural foundation for subsequent lightspeed engine installation</td></tr>
|
||||
<tr><td>2</td><td>2053-12-01</td><td>VLT-798</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-01 Endurance</a> (crewed)</td><td>Artificial-gravity habitation ring</td><td>Final Xihe-standard missing module backfill completed</td></tr>
|
||||
<tr><td colspan="6"><b>Phase 2: Lightspeed engine installation (2054-2055, full acceleration after ST-01 completion)</b></td></tr>
|
||||
<tr><td>3</td><td>2054-04-15</td><td>VLT-825</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-03 Courage</a> (crewed)</td><td>Lightspeed engine interface mounting base retrofit kit</td><td>Replaced the backfilled Xihe propulsion base interface with lightspeed-engine-compatible interface</td></tr>
|
||||
<tr><td>4</td><td>2054-08-01</td><td>VLT-848</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-01 Endurance</a> (crewed)</td><td>Magnetic confinement field coil assembly + primary cooling loop</td><td>--</td></tr>
|
||||
<tr><td>5</td><td>2054-12-15</td><td>VLT-872</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-05 Patience</a> (crewed)</td><td>Thrust vector control unit + propulsion control system core</td><td>--</td></tr>
|
||||
<tr><td>6</td><td>2055-03-01</td><td>VLT-895</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-02 Perseverance</a> (crewed)</td><td>Power transmission bus + redundant control loops</td><td>--</td></tr>
|
||||
<tr><td>7</td><td>2055-06-15</td><td>VLT-920</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-04 Determination</a> (crewed)</td><td>Xihe/Stellaria system integration optimization kit</td><td>Propulsion control interfaces and system integration optimized based on ST-01 trial run feedback</td></tr>
|
||||
<tr><td>8</td><td>2055-09-01</td><td>VLT-938</td><td><a href="/home/Space_Shuttles/Vulture_Shuttle">VS-03 Courage</a> (crewed)</td><td>Final integration test equipment + static fire preparation kit</td><td>Final reconfiguration launch; subsequent system integration and static testing conducted on the ship</td></tr>
|
||||
</tbody></table>
|
||||
|
||||
<p>As with ST-01, the core change of this reconfiguration was the installation of the lightspeed engine -- all other systems remained at Xihe-class standards. Kristen's construction totaled 13 Vulture launches (5 initial + 8 reconfiguration), comparable to ST-01's 14 launches (9 initial + 5 reconfiguration), reflecting the Stellaria Program's strategy of flexibly allocating orbiter resources across different phases based on prevailing conditions.</p>
|
||||
|
||||
<table>
|
||||
<thead><tr><th>Phase</th><th>Start</th><th>End</th><th>Duration</th><th>Activity</th></tr></thead>
|
||||
<tbody>
|
||||
<tr><td>Initial construction (Xihe-class base mothership)</td><td>2052-01-14</td><td>2053-02-10</td><td>~392 days</td><td>Vulture Shuttle orbiter relay, structural assembly and cross-module connections</td></tr>
|
||||
<tr><td>Construction halt</td><td>2053-02-10</td><td>2053-05-12</td><td>~91 days</td><td>Strategic decision and transfer preparation</td></tr>
|
||||
<tr><td>Reconfiguration (Stellaria-class second ship)</td><td>2053-05-12</td><td>2055-10-13</td><td>~884 days</td><td>Qingtian cargo transport, backfill of missing modules, lightspeed engine installation and testing</td></tr>
|
||||
<tr><td>Total</td><td>2052-01-14</td><td>2055-10-13</td><td>~1,367 days</td><td>From first module arrival to reconfiguration completion</td></tr>
|
||||
<tr><td>Reconfiguration (Stellaria-class second ship)</td><td>2053-05-12</td><td>2055-10-13</td><td>~884 days</td><td>Vulture Shuttle orbiter relay, backfill of missing modules, lightspeed engine installation and testing</td></tr>
|
||||
<tr><td>Total</td><td>2052-01-14</td><td>2055-10-13</td><td>~1,367 days</td><td>From first module arrival to reconfiguration completion (13 Vulture launches total)</td></tr>
|
||||
</tbody></table>
|
||||
|
||||
<h2 id="testing-and-commissioning">Testing and commissioning</h2>
|
||||
@@ -222,7 +238,7 @@
|
||||
<tr><td>Current length</td><td>Approximately 83.4 m (post-upgrade: ~125 m)</td></tr>
|
||||
<tr><td>Current max diameter</td><td>25 m (artificial-gravity habitation ring); post-upgrade: 30 m (dual rings)</td></tr>
|
||||
<tr><td>Primary propulsion</td><td>Lightspeed engine (Stellaria-class standard)</td></tr>
|
||||
<tr><td>Backup propulsion</td><td>Perseverance mass-driver propulsion system (Xihe-class standard)</td></tr>
|
||||
<tr><td>Backup propulsion</td><td>VS-02 Perseverance mass-driver propulsion system (Xihe-class standard)</td></tr>
|
||||
<tr><td>Main reactor</td><td>Ark cold-fusion reactor, approximately 8 TW output class</td></tr>
|
||||
<tr><td>Full-load delta-v</td><td>Approximately 2,200 km/s with 300 t payload (lightspeed engine)</td></tr>
|
||||
<tr><td>Maximum payload</td><td>300 t (post-upgrade: 500 t)</td></tr>
|
||||
|
||||
Reference in New Issue
Block a user