diff --git a/data/wiki/st01_stellaria_en.html b/data/wiki/st01_stellaria_en.html index ee23691..6a38379 100644 --- a/data/wiki/st01_stellaria_en.html +++ b/data/wiki/st01_stellaria_en.html @@ -88,7 +88,7 @@
Wanxingyuan is the lead ship of the Stellaria class, adopting a long axial-spine multi-module cylindrical configuration that extends the proven axial modular layout of the Xihe class across several key dimensions. Following the 2059-2060 Star Port comprehensive upgrade, the vessel measures approximately 125 m in overall length and features dual artificial-gravity habitation rings (each 30 m in diameter), a central extension section, a greenhouse module, cryo-sleep chambers, and enhanced radiation protection. Propulsion is centered on the lightspeed engine powered by an Ark cold-fusion reactor, with a retained Perseverance mass-driver propulsion system serving as backup.
+Wanxingyuan is the lead ship of the Stellaria class, adopting a long axial-spine multi-module cylindrical configuration that extends the proven axial modular layout of the Xihe class across several key dimensions. Following the 2059-2060 Star Port comprehensive upgrade, the vessel measures approximately 125 m in overall length and features dual artificial-gravity habitation rings (each 30 m in diameter), a central extension section, a greenhouse module, cryo-sleep chambers, and enhanced radiation protection. Propulsion is centered on the lightspeed engine powered by an Ark cold-fusion reactor, with a retained VS-02 Perseverance mass-driver propulsion system serving as backup.
Wanxingyuan is not capable of atmospheric re-entry or planetary landing; surface access and short-range transport are handled by two carried Echo-class shuttles (or compatible ferry craft). The ship accommodates a long-duration crew of 25 (up to 50 short-duration), with the dual artificial-gravity rings operating at different rotation rates to provide adjustable artificial gravity between approximately 0.4 g and 0.6 g. The greenhouse module features multi-zone rotational hydroponic cultivation, providing stable food supplementation and atmospheric regeneration for long-duration missions. Cryo-sleep chambers support reduced metabolic consumption during ultra-long transits such as outer-planet missions. For a complete description of design details, see the main Stellaria-class interplanetary exploration mothership article.
@@ -107,32 +107,43 @@| No. | Date | Mission | Orbiter | Primary module(s) | Notes |
|---|---|---|---|---|---|
| 1 | 2050-09-15 | VLT-456 | Patience (uncrewed) | Forward docking hub | Orbiter remained on orbit as initial assembly platform |
| 2 | 2050-12-01 | VLT-478 | Perseverance (crewed) | Command center | Crew used Patience as ops base; returned aboard Patience after mission |
| 3 | 2051-03-15 | VLT-503 | Loyalty (crewed) | Static habitation module | Crew used the orbiter left by Perseverance as base |
| 4 | 2051-06-01 | VLT-530 | Determination (crewed) | Central docking hub + initial truss | -- |
| 5 | 2051-09-15 | VLT-558 | Courage (crewed) | Greenhouse module | -- |
| 6 | 2051-12-01 | VLT-581 | Endurance (crewed) | Main storage module | -- |
| 7 | 2052-03-15 | VLT-607 | Courage (crewed) | Artificial-gravity habitation ring + truss extension | Ring segment exceeding Vulture payload bay limits assisted by super-heavy launch vehicle |
| 8 | 2052-06-01 | VLT-632 | Determination (crewed) | Propulsion module base structure | Ship achieved autonomous power and basic attitude control from this point |
| 9 | 2052-09-15 | VLT-650 | Patience (crewed) | Remaining truss + solar arrays | Final orbiter relay mission; subsequent work conducted directly on the mothership |
| 1 | 2050-09-15 | VLT-456 | VS-05 Patience (uncrewed) | Forward docking hub | Orbiter remained on orbit as initial assembly platform |
| 2 | 2050-12-01 | VLT-478 | VS-02 Perseverance (crewed) | Command center | Crew used VS-05 Patience as ops base; returned aboard VS-05 Patience after mission |
| 3 | 2051-03-15 | VLT-503 | VS-07 Loyalty (crewed) | Static habitation module | Crew used the orbiter left by VS-02 Perseverance as base |
| 4 | 2051-06-01 | VLT-530 | VS-04 Determination (crewed) | Central docking hub + initial truss | -- |
| 5 | 2051-09-15 | VLT-558 | VS-03 Courage (crewed) | Greenhouse module | -- |
| 6 | 2051-12-01 | VLT-581 | VS-01 Endurance (crewed) | Main storage module | -- |
| 7 | 2052-03-15 | VLT-607 | VS-03 Courage (crewed) | Artificial-gravity habitation ring + truss extension | Ring segment exceeding Vulture payload bay limits assisted by super-heavy launch vehicle |
| 8 | 2052-06-01 | VLT-632 | VS-04 Determination (crewed) | Propulsion module base structure | Ship achieved autonomous power and basic attitude control from this point |
| 9 | 2052-09-15 | VLT-650 | VS-05 Patience (crewed) | Remaining truss + solar arrays | Final orbiter relay mission; subsequent work conducted directly on the mothership |
By 2053-02-02, initial construction had accumulated 871 days. At this point the hull had completed primary structural mating and most cross-module connections, but the main propulsion system (the Xihe-class Perseverance mass-driver) had not yet been delivered. Just as the propulsion module was about to arrive, a strategic decision altered the ship's destiny: the emerging Stellaria Program offered the revolutionary lightspeed engine propulsion technology. Completing it as a standard Xihe-class mothership would have missed the window to leverage the new technology.
+By 2053-02-02, initial construction had accumulated 871 days. At this point the hull had completed primary structural mating and most cross-module connections, but the main propulsion system (the Xihe-class VS-02 Perseverance mass-driver) had not yet been delivered. Just as the propulsion module was about to arrive, a strategic decision altered the ship's destiny: the emerging Stellaria Program offered the revolutionary lightspeed engine propulsion technology. Completing it as a standard Xihe-class mothership would have missed the window to leverage the new technology.
Construction was formally halted on 2053-02-02. Three months later (2053-05-11), the hull was officially transferred to the Stellaria Program and entered the reconfiguration phase. The other base mothership (future ST-02) was also halted on 2053-02-10 and subsequently transferred as well.
Reconfiguration work commenced on 2053-05-11 at Star Port Station, lasting 352 days and completing on 2054-04-28. During this period, the ship's original Xihe-class propulsion module mounting base was replaced with a lightspeed-engine-compatible interface, and lightspeed engine core components were delivered in batches to Star Port by Qingtian cargo ships (LEO upmass capacity approximately 150 t) for orbital installation and static testing.
+Reconfiguration work commenced on 2053-05-11 in low Earth orbit, lasting 352 days and completing on 2054-04-28. During this period, the ship's original Xihe-class propulsion module mounting base was replaced with a lightspeed-engine-compatible interface, and lightspeed engine core components were delivered in batches to LEO by Vulture Shuttles (by this time in the Block 1.5 era at 24 flights/year per orbiter) for orbital installation and static testing.
-It is crucial to emphasize that this reconfiguration's core change was the replacement of the Xihe-class Perseverance mass-driver propulsion system with the lightspeed engine -- all other systems (including command center, habitation modules, greenhouse, docking interfaces, and life-support systems) remained at Xihe-class standards. In other words, upon completion of reconfiguration in 2054, Wanxingyuan was essentially a hybrid platform: "Xihe-class hull + Stellaria-class propulsion core." This identity defined its early operations from 2055 to 2058, until the 2059-2060 Star Port upgrade brought it to full Stellaria-class specifications.
+It is crucial to emphasize that this reconfiguration's core change was the replacement of the Xihe-class VS-02 Perseverance mass-driver propulsion system with the lightspeed engine -- all other systems (including command center, habitation modules, greenhouse, docking interfaces, and life-support systems) remained at Xihe-class standards. In other words, upon completion of reconfiguration in 2054, Wanxingyuan was essentially a hybrid platform: "Xihe-class hull + Stellaria-class propulsion core." This identity defined its early operations from 2055 to 2058, until the 2059-2060 Star Port upgrade brought it to full Stellaria-class specifications.
+ +Reconfiguration work was handled entirely by Vulture Shuttles. Since the lightspeed engine core components could be transported in disassembled form within the Vulture payload bay, no super-heavy launch vehicle assistance was required. The following table records the key launches of the reconfiguration phase:
+| No. | Date | Mission | Orbiter | Primary payload | Notes |
|---|---|---|---|---|---|
| 1 | 2053-05-11 | VLT-755 | VS-03 Courage (crewed) | Lightspeed engine interface mounting base retrofit kit | Replaced Xihe-class propulsion base with lightspeed-engine-compatible interface |
| 2 | 2053-08-01 | VLT-772 | VS-04 Determination (crewed) | Magnetic confinement field coil assembly + primary cooling loop | -- |
| 3 | 2053-11-15 | VLT-795 | VS-01 Endurance (crewed) | Thrust vector control unit + propulsion control system core | -- |
| 4 | 2054-01-15 | VLT-812 | VS-05 Patience (crewed) | Power transmission bus + redundant control loops | -- |
| 5 | 2054-03-01 | VLT-830 | VS-02 Perseverance (crewed) | Final integration test equipment + static fire preparation kit | Final reconfiguration launch; subsequent system integration and static testing conducted on the ship |
| Phase | Start | End | Duration | Activity |
|---|---|---|---|---|
| Initial construction (Xihe-class base mothership) | 2050-09-15 | 2053-02-02 | 871 days | Vulture Shuttle orbiter relay, structural assembly and cross-module connections |
| Construction halt | 2053-02-02 | 2053-05-11 | 98 days | Strategic decision and transfer preparation |
| Reconfiguration (Stellaria-class lead ship) | 2053-05-11 | 2054-04-28 | 352 days | Qingtian cargo ship transport, lightspeed engine installation and static testing |
| Reconfiguration (Stellaria-class lead ship) | 2053-05-11 | 2054-04-28 | 352 days | Vulture Shuttle orbiter relay, lightspeed engine component delivery and installation |
| Total | 2050-09-15 | 2054-04-28 | 1,321 days | From first module arrival to reconfiguration completion |
| 序号 | 日期 | 任务 | 轨道器 | 主要模块 | 备注 |
|---|---|---|---|---|---|
| 1 | 2050-09-15 | VLT-456 | 耐心号(无人) | 前部对接枢纽 | 轨道器留在轨道上,作为初始组装平台 |
| 2 | 2050-12-01 | VLT-478 | 毅力号(载人) | 指挥中心 | 人员以耐心号为操作基地;任务后乘耐心号返回 |
| 3 | 2051-03-15 | VLT-503 | 忠诚号(载人) | 静止居住模块 | 人员以毅力号留下的轨道器为基地 |
| 4 | 2051-06-01 | VLT-530 | 决心号(载人) | 中心对接枢纽 + 初始桁架段 | — |
| 5 | 2051-09-15 | VLT-558 | 勇气号(载人) | 温室模块 | — |
| 6 | 2051-12-01 | VLT-581 | 耐力号(载人) | 主储藏模块 | — |
| 7 | 2052-03-15 | VLT-607 | 勇气号(载人) | 人工重力居住环 + 桁架延伸段 | 人工重力环超出秃鹫货舱限制的一部分由超重型火箭辅助发射 |
| 8 | 2052-06-01 | VLT-632 | 决心号(载人) | 推进模块基础结构 | 母舰自此具备自主电力和基础姿态控制 |
| 9 | 2052-09-15 | VLT-650 | 耐心号(载人) | 剩余桁架段 + 太阳能阵列 | 最后一次轨道器接力;此后建造工作直接在母舰上进行 |
| 1 | 2050-09-15 | VLT-456 | VS-05 耐心号(无人) | 前部对接枢纽 | 轨道器留在轨道上,作为初始组装平台 |
| 2 | 2050-12-01 | VLT-478 | VS-02 毅力号(载人) | 指挥中心 | 人员以VS-05 耐心号为操作基地;任务后乘VS-05 耐心号返回 |
| 3 | 2051-03-15 | VLT-503 | VS-07 忠诚号(载人) | 静止居住模块 | 人员以VS-02 毅力号留下的轨道器为基地 |
| 4 | 2051-06-01 | VLT-530 | VS-04 决心号(载人) | 中心对接枢纽 + 初始桁架段 | — |
| 5 | 2051-09-15 | VLT-558 | VS-03 勇气号(载人) | 温室模块 | — |
| 6 | 2051-12-01 | VLT-581 | VS-01 耐力号(载人) | 主储藏模块 | — |
| 7 | 2052-03-15 | VLT-607 | VS-03 勇气号(载人) | 人工重力居住环 + 桁架延伸段 | 人工重力环超出秃鹫货舱限制的一部分由超重型火箭辅助发射 |
| 8 | 2052-06-01 | VLT-632 | VS-04 决心号(载人) | 推进模块基础结构 | 母舰自此具备自主电力和基础姿态控制 |
| 9 | 2052-09-15 | VLT-650 | VS-05 耐心号(载人) | 剩余桁架段 + 太阳能阵列 | 最后一次轨道器接力;此后建造工作直接在母舰上进行 |
至 2053 年 2 月 2 日,初始建造完成 871 天。此时舰体已完成主体结构对接和大部分跨模块连接,但尚未安装主推进系统(羲和级"毅力"质量驱动推进系统尚未交付)。就在推进模块即将运抵之际,一项战略决策改变了这艘舰的命运:新兴的万星源计划提供了光速引擎这一革命性推进技术。继续将其建造成标准羲和级母舰将错失利用新技术的窗口。
@@ -127,12 +127,23 @@需要特别强调的是,此次重新配置的核心变更是将羲和级的"毅力"质量驱动推进系统替换为光速引擎——其余系统(包括指挥中心、居住模块、温室、对接口和生命保障系统)均保持羲和级标准。换言之,万星源号在 2054 年重新配置完成时本质上是一艘"羲和级舰体 + 万星源级推进核心"的混合平台。这一定位贯穿了其 2055—2058 年的初期运营,直至 2059—2060 年星港升级才达到完整的万星源级规格。
+重新配置工作仍由秃鹫航天飞机(此时已进入 Block 1.5 时代,单架年飞行率提升至 24 次/年)承担全部运输和组装任务。由于不涉及大型整体模块(光速引擎核心组件可在拆解状态下由秃鹫货舱容纳),重新配置无需超重型火箭辅助。以下为重新配置阶段的主要发射记录:
+| 序号 | 日期 | 任务 | 轨道器 | 主要载荷 | 备注 |
|---|---|---|---|---|---|
| 1 | 2053-05-11 | VLT-755 | VS-03 勇气号(载人) | 光速引擎接口基座改造套件 | 替换羲和级推进模块基座,安装光速引擎兼容接口 |
| 2 | 2053-08-01 | VLT-772 | VS-04 决心号(载人) | 磁约束场线圈组件及冷却系统初级回路 | — |
| 3 | 2053-11-15 | VLT-795 | VS-01 耐力号(载人) | 推力矢量控制单元及推进控制系统核心 | — |
| 4 | 2054-01-15 | VLT-812 | VS-05 耐心号(载人) | 动力传输总线及冗余控制回路 | — |
| 5 | 2054-03-01 | VLT-830 | VS-02 毅力号(载人) | 最终集成测试设备及静态点火准备套件 | 末次重新配置发射;此后在舰上进行系统集成与静态测试 |
| 阶段 | 开始 | 结束 | 持续 | 主要内容 |
|---|---|---|---|---|
| 初始建造(羲和级基础母舰) | 2050-09-15 | 2053-02-02 | 871 天 | 秃鹫航天飞机轨道器接力,主体结构对接与跨模块连接 |
| 建造暂停 | 2053-02-02 | 2053-05-11 | 98 天 | 战略决策与移交准备 |
| 重新配置(万星源级首舰) | 2053-05-11 | 2054-04-28 | 352 天 | 擎天货运飞船运输,光速引擎安装与静态测试 |
| 重新配置(万星源级首舰) | 2053-05-11 | 2054-04-28 | 352 天 | 秃鹫航天飞机轨道器接力,光速引擎核心组件分批运抵与安装 |
| 总计 | 2050-09-15 | 2054-04-28 | 1,321 天 | 从首个模块运抵到重新配置完成 |
| No. | Date | Mission | Orbiter | Primary module(s) | Notes |
|---|---|---|---|---|---|
| 1 | 2052-01-14 | VLT-661 | Loyalty (uncrewed) | Forward docking hub + command center | Final Vulture Block 1 uncrewed first launch; orbiter remained as assembly platform |
| 2 | 2052-04-01 | VLT-685 | Perseverance (crewed) | Static habitation module + initial truss | -- |
| 3 | 2052-07-15 | VLT-708 | Courage (crewed) | Central docking hub | -- |
| 4 | 2052-10-01 | VLT-725 | Determination (crewed) | Greenhouse module | -- |
| 5 | 2052-12-15 | VLT-741 | Endurance (crewed) | Main storage module + truss extension | Final orbiter relay. Construction halted thereafter |
| 1 | 2052-01-14 | VLT-661 | VS-07 Loyalty (uncrewed) | Forward docking hub + command center | Final Vulture Block 1 uncrewed first launch; orbiter remained as assembly platform |
| 2 | 2052-04-01 | VLT-685 | VS-02 Perseverance (crewed) | Static habitation module + initial truss | -- |
| 3 | 2052-07-15 | VLT-708 | VS-03 Courage (crewed) | Central docking hub | -- |
| 4 | 2052-10-01 | VLT-725 | VS-04 Determination (crewed) | Greenhouse module | -- |
| 5 | 2052-12-15 | VLT-741 | VS-01 Endurance (crewed) | Main storage module + truss extension | Final orbiter relay. Construction halted thereafter |
On 2053-02-10, the same strategic decision that affected ST-01 was applied to this vessel: rather than completing it as a standard Xihe-class mothership, it was transferred to the Stellaria Program to be equipped with the lightspeed engine. Construction was formally halted. Three months later (2053-05-12 -- just one day after ST-01's transfer), the hull was officially transferred to the Stellaria Program and entered the reconfiguration phase.
Kristen's reconfiguration commenced on 2053-05-12 at Star Port Station, lasting approximately 884 days and completing on 2055-10-13. This was the longest reconfiguration phase of any mothership -- approximately 2.5 times ST-01's 352 days. Three primary factors account for this difference:
+Kristen's reconfiguration commenced on 2053-05-12 in low Earth orbit, lasting approximately 884 days and completing on 2055-10-13. This was the longest reconfiguration phase of any mothership -- approximately 2.5 times ST-01's 352 days. Three primary factors account for this difference:
Reconfiguration work was supported by Qingtian cargo ships (LEO upmass capacity approximately 150 t) for large-module transport, with Star Port Station's resident engineering teams conducting orbital installation and testing. As with ST-01, the core change of this reconfiguration was the installation of the lightspeed engine -- all other systems remained at Xihe-class standards.
+As with the initial construction phase, all reconfiguration work was carried out by Vulture Shuttles (Block 1.5, 24 flights/year per orbiter). Kristen's reconfiguration proceeded in two phases: Phase 1 (May 2053 to April 2054) focused on backfilling missing Xihe-standard modules at a slower pace with only 2 launches, as ST-01's reconfiguration took priority; Phase 2 (April 2054 to October 2055), after ST-01's completion freed up orbiter resources, accelerated to 6 launches. The reconfiguration totaled 8 Vulture launches -- more than ST-01's 5 reconfiguration launches, compensating for the module shortfall from the shorter initial construction phase. The following table records the key launches:
+| No. | Date | Mission | Orbiter | Primary payload | Notes |
|---|---|---|---|---|---|
| Phase 1: Backfill missing modules (2053-2054, concurrent with ST-01 reconfiguration, resource-constrained) | |||||
| 1 | 2053-08-15 | VLT-778 | VS-04 Determination (crewed) | Propulsion module base structure | Backfill of Xihe-standard propulsion base, providing structural foundation for subsequent lightspeed engine installation |
| 2 | 2053-12-01 | VLT-798 | VS-01 Endurance (crewed) | Artificial-gravity habitation ring | Final Xihe-standard missing module backfill completed |
| Phase 2: Lightspeed engine installation (2054-2055, full acceleration after ST-01 completion) | |||||
| 3 | 2054-04-15 | VLT-825 | VS-03 Courage (crewed) | Lightspeed engine interface mounting base retrofit kit | Replaced the backfilled Xihe propulsion base interface with lightspeed-engine-compatible interface |
| 4 | 2054-08-01 | VLT-848 | VS-01 Endurance (crewed) | Magnetic confinement field coil assembly + primary cooling loop | -- |
| 5 | 2054-12-15 | VLT-872 | VS-05 Patience (crewed) | Thrust vector control unit + propulsion control system core | -- |
| 6 | 2055-03-01 | VLT-895 | VS-02 Perseverance (crewed) | Power transmission bus + redundant control loops | -- |
| 7 | 2055-06-15 | VLT-920 | VS-04 Determination (crewed) | Xihe/Stellaria system integration optimization kit | Propulsion control interfaces and system integration optimized based on ST-01 trial run feedback |
| 8 | 2055-09-01 | VLT-938 | VS-03 Courage (crewed) | Final integration test equipment + static fire preparation kit | Final reconfiguration launch; subsequent system integration and static testing conducted on the ship |
As with ST-01, the core change of this reconfiguration was the installation of the lightspeed engine -- all other systems remained at Xihe-class standards. Kristen's construction totaled 13 Vulture launches (5 initial + 8 reconfiguration), comparable to ST-01's 14 launches (9 initial + 5 reconfiguration), reflecting the Stellaria Program's strategy of flexibly allocating orbiter resources across different phases based on prevailing conditions.
| Phase | Start | End | Duration | Activity |
|---|---|---|---|---|
| Initial construction (Xihe-class base mothership) | 2052-01-14 | 2053-02-10 | ~392 days | Vulture Shuttle orbiter relay, structural assembly and cross-module connections |
| Construction halt | 2053-02-10 | 2053-05-12 | ~91 days | Strategic decision and transfer preparation |
| Reconfiguration (Stellaria-class second ship) | 2053-05-12 | 2055-10-13 | ~884 days | Qingtian cargo transport, backfill of missing modules, lightspeed engine installation and testing |
| Total | 2052-01-14 | 2055-10-13 | ~1,367 days | From first module arrival to reconfiguration completion |
| Reconfiguration (Stellaria-class second ship) | 2053-05-12 | 2055-10-13 | ~884 days | Vulture Shuttle orbiter relay, backfill of missing modules, lightspeed engine installation and testing |
| Total | 2052-01-14 | 2055-10-13 | ~1,367 days | From first module arrival to reconfiguration completion (13 Vulture launches total) |
| 序号 | 日期 | 任务 | 轨道器 | 主要模块 | 备注 |
|---|---|---|---|---|---|
| 1 | 2052-01-14 | VLT-661 | 忠诚号(无人) | 前部对接枢纽 + 指挥中心 | 最后一次秃鹫 Block 1 无人首飞;轨道器留轨作为组装平台 |
| 2 | 2052-04-01 | VLT-685 | 毅力号(载人) | 静止居住模块 + 初始桁架 | — |
| 3 | 2052-07-15 | VLT-708 | 勇气号(载人) | 中心对接枢纽 | — |
| 4 | 2052-10-01 | VLT-725 | 决心号(载人) | 温室模块 | — |
| 5 | 2052-12-15 | VLT-741 | 耐力号(载人) | 主储藏模块 + 桁架延伸段 | 末次轨道器接力。此后建造暂停 |
| 1 | 2052-01-14 | VLT-661 | VS-07 忠诚号(无人) | 前部对接枢纽 + 指挥中心 | 最后一次秃鹫 Block 1 无人首飞;轨道器留轨作为组装平台 |
| 2 | 2052-04-01 | VLT-685 | VS-02 毅力号(载人) | 静止居住模块 + 初始桁架 | — |
| 3 | 2052-07-15 | VLT-708 | VS-03 勇气号(载人) | 中心对接枢纽 | — |
| 4 | 2052-10-01 | VLT-725 | VS-04 决心号(载人) | 温室模块 | — |
| 5 | 2052-12-15 | VLT-741 | VS-01 耐力号(载人) | 主储藏模块 + 桁架延伸段 | 末次轨道器接力。此后建造暂停 |
2053 年 2 月 10 日,与 ST-01 相同的战略决策作用于这艘舰:与其将其建造成标准羲和级母舰,不如移交至万星源计划并配备光速引擎。建造正式暂停。三个月后(2053 年 5 月 12 日——仅比 ST-01 晚一天),该舰体正式移交万星源计划,进入重新配置阶段。
克里斯滕号的重新配置于 2053 年 5 月 12 日在星港空间站启动,历时约 884 天,于 2055 年 10 月 13 日完成。这是所有母舰中耗时最长的重新配置阶段——约为 ST-01 的 352 天的 2.5 倍。造成这一差异的主要原因有三:
+克里斯滕号的重新配置于 2053 年 5 月 12 日在近地轨道启动,历时约 884 天,于 2055 年 10 月 13 日完成。这是所有母舰中耗时最长的重新配置阶段——约为 ST-01 的 352 天的 2.5 倍。造成这一差异的主要原因有三:
重新配置工作由擎天货运飞船(近地轨道上行能力约 150 吨)承担大型模块运输,星港空间站常驻工程团队负责在轨安装和测试。与 ST-01 一样,此次重新配置的核心变更是安装光速引擎——其余系统保持羲和级标准。
+与初始建造阶段一样,重新配置工作全部由秃鹫航天飞机(Block 1.5,单架年飞行率 24 次/年)承担。克里斯滕号的重新配置分为两个阶段:第一阶段(2053 年 5 月至 2054 年 4 月)以补装缺失的羲和级基础模块为主,进度较慢,仅完成 2 次发射;第二阶段(2054 年 4 月至 2055 年 10 月),ST-01 完成重新配置后轨道器资源释放,克里斯滕号进入全面加速,完成 6 次发射。重新配置期间共计 8 次秃鹫发射——多于 ST-01 重新配置的 5 次,弥补了初始建造阶段因资源不足导致的模块缺口。以下为重新配置阶段的主要发射记录:
+| 序号 | 日期 | 任务 | 轨道器 | 主要载荷 | 备注 |
|---|---|---|---|---|---|
| 第一阶段:补装缺失模块(2053—2054,与 ST-01 重新配置并行,资源受限) | |||||
| 1 | 2053-08-15 | VLT-778 | VS-04 决心号(载人) | 推进模块基座结构 | 补装羲和级标准推进基座,为后续光速引擎安装提供结构基础 |
| 2 | 2053-12-01 | VLT-798 | VS-01 耐力号(载人) | 人工重力居住环 | 最后一项羲和级缺失模块补装完成 |
| 第二阶段:光速引擎安装(2054—2055,ST-01 完成后全面加速) | |||||
| 3 | 2054-04-15 | VLT-825 | VS-03 勇气号(载人) | 光速引擎接口基座改造套件 | 替换补装的羲和级推进基座接口,安装光速引擎兼容接口 |
| 4 | 2054-08-01 | VLT-848 | VS-01 耐力号(载人) | 磁约束场线圈组件及冷却系统初级回路 | — |
| 5 | 2054-12-15 | VLT-872 | VS-05 耐心号(载人) | 推力矢量控制单元及推进控制系统核心 | — |
| 6 | 2055-03-01 | VLT-895 | VS-02 毅力号(载人) | 动力传输总线及冗余控制回路 | — |
| 7 | 2055-06-15 | VLT-920 | VS-04 决心号(载人) | 羲和级/万星源级系统集成优化套件 | 基于 ST-01 试运行反馈优化推进控制接口和系统集成 |
| 8 | 2055-09-01 | VLT-938 | VS-03 勇气号(载人) | 最终集成测试设备及静态点火准备套件 | 末次重新配置发射;此后在舰上进行系统集成与静态测试 |
与 ST-01 一样,此次重新配置的核心变更是安装光速引擎——其余系统保持羲和级标准。克里斯滕号建造总计 13 次秃鹫发射(初始 5 次 + 重新配置 8 次),与 ST-01 的 14 次(初始 9 次 + 重新配置 5 次)总量相当,反映了万星源计划在不同阶段根据资源条件灵活调度轨道器的建造策略。
| 阶段 | 开始 | 结束 | 持续 | 主要内容 |
|---|---|---|---|---|
| 初始建造(羲和级基础母舰) | 2052-01-14 | 2053-02-10 | 约 392 天 | 秃鹫航天飞机轨道器接力,主体结构对接 |
| 建造暂停 | 2053-02-10 | 2053-05-12 | 约 91 天 | 战略决策与移交准备 |
| 重新配置(万星源级二号舰) | 2053-05-12 | 2055-10-13 | 约 884 天 | 擎天货运飞船运输,补充缺失模块,光速引擎安装与测试 |
| 总计 | 2052-01-14 | 2055-10-13 | 约 1,367 天 | 从首个模块运抵到重新配置完成 |
| 重新配置(万星源级二号舰) | 2053-05-12 | 2055-10-13 | 约 884 天 | 秃鹫航天飞机轨道器接力,补装缺失模块,光速引擎安装与测试 |
| 总计 | 2052-01-14 | 2055-10-13 | 约 1,367 天 | 从首个模块运抵到重新配置完成(共 13 次秃鹫发射) |
| 序号 | 日期 | 任务 | 轨道器 | 模块 | 备注 |
|---|---|---|---|---|---|
| 1 | 2050-03-15 | VLT-411 | 耐力号(Endurance)(无人) | 前部对接枢纽 | 轨道器留在轨道上,作为初始组装平台 |
| 2 | 2050-06-01 | VLT-432 | 勇气号(Courage)(载人) | 指挥中心 + 初始桁架段 | 人员使用耐力号为操作基地;任务后乘耐力号返回,勇气号留在轨道 |
| 3 | 2050-08-15 | VLT-448 | 毅力号(Perseverance)(载人) | 静止居住模块 | 人员使用勇气号为基地;任务后乘勇气号返回,毅力号留在轨道 |
| 1 | 2050-03-15 | VLT-411 | VS-01 耐力号(无人) | 前部对接枢纽 | 轨道器留在轨道上,作为初始组装平台 |
| 2 | 2050-06-01 | VLT-432 | VS-03 勇气号(载人) | 指挥中心 + 初始桁架段 | 人员使用耐力号为操作基地;任务后乘耐力号返回,勇气号留在轨道 |
| 3 | 2050-08-15 | VLT-448 | VS-02 毅力号(载人) | 静止居住模块 | 人员使用勇气号为基地;任务后乘勇气号返回,毅力号留在轨道 |
| 4 | 2050-11-01 | — | 超重型运载火箭(无人) | 人工重力居住环 | 直径 25 米,超出秃鹫货舱限制;由轨道拖船辅助对接 |
| 5 | 2051-01-15 | VLT-479 | 决心号(Determination)(载人) | 温室模块 + 中心对接枢纽 | 人员使用毅力号为基地;任务后乘毅力号返回,决心号留在轨道 |
| 6 | 2051-04-01 | VLT-501 | 坚毅号(Fortitude)(载人) | 主储藏模块 | 人员使用决心号为基地;任务后乘决心号返回,坚毅号留在轨道 |
| 7 | 2051-06-15 | VLT-522 | 耐力号(Endurance)(载人) | 推进模块 | 含"毅力"推进系统与方舟反应堆。母舰自此具备自主电力和姿态控制能力 |
| 8 | 2051-09-01 | VLT-544 | 忠诚号(Loyalty)(载人) | 剩余桁架段 + 太阳能阵列 + 外部设备 | 最后一次轨道器接力任务。此后母舰可独立飞行,建造工作直接在母舰上进行 |
| 5 | 2051-01-15 | VLT-479 | VS-04 决心号(载人) | 温室模块 + 中心对接枢纽 | 人员使用毅力号为基地;任务后乘毅力号返回,决心号留在轨道 |
| 6 | 2051-04-01 | VLT-501 | VS-06 坚毅号(载人) | 主储藏模块 | 人员使用决心号为基地;任务后乘决心号返回,坚毅号留在轨道 |
| 7 | 2051-06-15 | VLT-522 | VS-01 耐力号(载人) | 推进模块 | 含"毅力"推进系统与方舟反应堆。母舰自此具备自主电力和姿态控制能力 |
| 8 | 2051-09-01 | VLT-544 | VS-07 忠诚号(载人) | 剩余桁架段 + 太阳能阵列 + 外部设备 | 最后一次轨道器接力任务。此后母舰可独立飞行,建造工作直接在母舰上进行 |
第 7 次发射(推进模块)完成后,羲和号首次使用自身反应堆供电并启动姿态控制系统,标志着母舰具备了独立运行能力。第 8 次发射后,建造工作转入系统集成和舱内舾装阶段。2051 年 9 月至 2052 年 2 月期间,不再有新的模块发射,组装人员乘坐母舰自身携带的临时居住舱驻留,专注于跨模块电力母线连接、生命保障管路贯通和全舰系统联调。
diff --git a/data/wiki/xihe_mothership_en.html b/data/wiki/xihe_mothership_en.html index 426a883..f74f369 100644 --- a/data/wiki/xihe_mothership_en.html +++ b/data/wiki/xihe_mothership_en.html @@ -54,10 +54,10 @@The Xihe-class interplanetary exploration mothership is a first-generation large crewed mothership designed for long-range operations inside the Solar System. Named after Xihe, the solar deity in Chinese mythology, the class supports scientific expeditions, off-world base construction, crew rotation, and deep-space technology validation around Mars, the Jovian moons, and other target bodies. As of March 2060, the lead ship Xihe (XH-01) is in the Jovian system on Europa Expedition 3, continuing deep-space exploration and base-support duties. As of March 2060, the Xihe class has three active ships (Xihe, Taibai (XH-02), Changxi (XH-03)) and one under construction (XH-04). The lead ship Xihe is currently executing Europa Expedition 3 in the Jovian system.
+The Xihe-class interplanetary exploration mothership is a first-generation large crewed mothership designed for long-range operations inside the Solar System. Named after Xihe, the solar deity in Chinese mythology, the class supports scientific expeditions, off-world base construction, crew rotation, and deep-space technology validation around Mars, the Jovian moons, and other target bodies. As of March 2060, the lead ship Xihe (XH-01) is in the Jovian system on Europa Expedition 3. Taibai (XH-02) has completed construction and is undergoing its trial run. Changxi (XH-03) remains under construction. The status of XH-04 is to be verified.
The class uses an axial modular configuration with a mass-driver main propulsion system, an Ark cold-fusion reactor, closed-loop life support, an artificial-gravity habitation ring, scientific facilities, a greenhouse module, and reinforced docking hardware. It is not capable of atmospheric re-entry or planetary landing. Surface access and short-range target-system transport are handled by carried ferry shuttles and surface vehicles.
Before the Stellaria class entered service, Xihe-class motherships served as the main platform for multiple interplanetary missions. Xihe was assembled in low Earth orbit from 2050 to 2052 and subsequently supported Mars-orbit validation, Mars base construction, Europa outpost construction, and Jovian-system scientific operations. The class provided the operational foundation for later interplanetary exploration motherships.
-The Xihe class is a large crewed mothership class designed for Mars and Jovian system exploration. The lead ship, Xihe (XH-01), was completed and commissioned in 2052. Subsequent ships Taibai (XH-02) and Changxi (XH-03) continue the class design with distinct mission specializations.
+The Xihe class is a large crewed mothership class designed for Mars and Jovian system exploration. The lead ship, Xihe (XH-01), was completed and commissioned in 2052. Taibai (XH-02) completed construction in July 2059 and, as of March 2060, is in its trial run phase. Changxi (XH-03) began construction in February 2056 and, as of March 2060, remains under construction.