- Reference docs: known issues, user journey, location redesign, mission merge plan - Scripts: fill_location_state, merge_missions, migrate_location, migrate_state - Tests: e2e test suite, asset entries unit tests - Demo: location board, hifi prototypes, test screenshots - Data backup: asset log entries and state nodes - Update .gitignore Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
47 KiB
47 KiB
| 1 | asset | id | kind | title | mission | start | end | state | location | summary | note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2 | Europa Outpost | bf68c161-7303-44da-bf6e-72373d2e54d5 | state | EOCM-1 Outpost Deployment | Europa Outpost Construction Mission 1 | 2057-02-27 08:00:00+08:00 | 2057-03-15 09:00:00+08:00 | Outpost Construction | Europa Outpost | The first crewed Europa construction campaign assembled the initial habitat, power spine, and life-support core. | Backfilled from ST-01 EOCM-1 support logs. |
| 3 | Europa Outpost | 53ee9bf9-27c3-47c2-94f3-656a8eea64f2 | event | Enter into Service | Europa Outpost Construction Mission 1 | 2057-03-15 09:00:00+08:00 | Europa Outpost | Europa Outpost entered operational service after the initial construction stack passed habitability review. | User-provided milestone, consistent with ST-01 EOCM-1 operation window. | ||
| 4 | Europa Outpost | 6ffeda07-93fb-4d17-9efc-817555771d35 | state | EOCM-1 Initial Outpost Operations | Europa Outpost Construction Mission 1 | 2057-03-15 09:00:00+08:00 | 2057-10-01 08:00:00+08:00 | Outpost Commissioning | Europa Outpost | The outpost remained crewed while the first construction team brought core systems to sustained operational readiness. | Backfilled from ST-01 EOCM-1 support logs. |
| 5 | Europa Outpost | d548ded1-232d-4e68-875b-290092c7c0b8 | state | Autonomous Standby | Europa Outpost Construction Mission 1 | 2057-10-01 08:00:00+08:00 | 2058-01-19 08:00:00+08:00 | Autonomous Standby | Europa Outpost | After the first construction crew departed, Europa Outpost stayed in autonomous survival mode while awaiting the second construction mission. | Bridging interval inferred from EOCM-1 return and EOCM-2 arrival windows. |
| 6 | Europa Outpost | 83dcded1-c57c-49c8-b94b-5430c2fe4d4d | state | EOCM-2 Outpost Expansion | Europa Outpost Construction Mission 2 | 2058-01-19 08:00:00+08:00 | 2058-09-06 08:00:00+08:00 | Outpost Construction | Europa Outpost | The second construction campaign expanded the habitat ring, utility corridors, and long-duration expedition support spaces. | Backfilled from ST-02 EOCM-2 support logs. |
| 7 | Europa Outpost | 50c4b9a3-644d-4dd6-85c7-cd40f1d32667 | state | Post-Construction Readiness | Europa Outpost Construction Mission 2 | 2058-09-06 08:00:00+08:00 | 2058-09-25 08:00:00+08:00 | Autonomous Standby | Europa Outpost | Europa Outpost remained uncrewed briefly after Construction Mission 2 while final expedition supplies were staged. | Bridging interval inferred from ST-02 EOCM-2 departure and XH-01 EE-1 arrival. |
| 8 | Europa Outpost | 188eb0ca-df35-4644-92d3-6952bae3dbe8 | event | Europa Expedition 1 Arrived | Europa Expedition 1 | 2058-09-25 10:00:00+08:00 | Europa Outpost | Europa Expedition 1 docked at the outpost and began the first standard long-duration occupation cycle. | Backfilled from XH-01 EE-1 support logs. | ||
| 9 | Europa Outpost | f034826a-77fc-4070-84a6-0f419d0910bb | state | EE-1 Surface Operations | Europa Expedition 1 | 2058-09-25 10:00:00+08:00 | 2059-06-25 08:30:00+08:00 | Surface Expedition | Europa Outpost | Europa Expedition 1 occupied the outpost and supported early Jupiter system science operations based from Europa. | Backfilled from XH-01 EE-1 Jupiter System Operations. |
| 10 | Europa Outpost | a5da1a52-0c59-423a-b41e-2e646783bb67 | event | Europa Expedition 2 Arrived | Europa Expedition 2 | 2059-06-25 08:30:00+08:00 | Europa Outpost | Europa Expedition 2 arrived via ST-02 Kristen with 12 crew and 1 Echo Shuttle Block 1. | User-provided crew manifest and arrival vehicle; consistent with ST-02 EE-2 arrival window. | ||
| 11 | Europa Outpost | f17eb842-8870-431d-9280-1b5fde97b48b | state | EE-1/EE-2 Crew Handoff | Europa Expedition 1; Europa Expedition 2 | 2059-06-25 08:30:00+08:00 | 2059-06-25 16:00:00+08:00 | Crew Handoff; Surface Expedition | Europa Outpost | Europa Expedition 2 overlapped with Expedition 1 during crew transfer, cargo sorting, and outpost handover. | Outpost-level handoff interval inferred from same-day EE-2 arrival and EE-1 departure notes. |
| 12 | Europa Outpost | a51cd5a1-3ef1-430a-87f7-71ce9db44714 | state | EE-2 Surface Operations | Europa Expedition 2 | 2059-06-25 16:00:00+08:00 | 2060-05-03 09:00:00+08:00 | Surface Expedition | Europa Outpost | Europa Expedition 2 assumed continuous occupation of the outpost after the first crew rotation completed. | Backfilled from ST-02 EE-2 support logs. |
| 13 | Europa Outpost | 906f6248-fd84-4211-a0eb-74c39e59ce86 | event | Europa Expedition 1 Departed | Europa Expedition 1 | 2059-06-25 16:00:00+08:00 | Europa Outpost | Europa Expedition 1 departed the outpost via Xihe Station with 9 crew and 1 Callisto MPV Block 1. | User-provided departure note; treated as outpost departure milestone within XH-01 EE-1 broader return window. | ||
| 14 | Europa Outpost | 15f8aae6-45f8-43d9-a3d6-9a2585ddeed2 | event | Expansion Module Arrived | Europa Outpost Expansion Mission; Europa Expedition 2 | 2060-05-03 11:00:00+08:00 | Europa Outpost | The Europa Outpost expansion module arrived while Expedition 2 remained on station. | User-provided date; consistent with Solar Shuttle 2 expansion delivery window at Europa. | ||
| 15 | Europa Outpost | 82509df3-ad30-483f-a0f7-b05ff4497435 | state | EE-2 Operations with Expansion Module Integration | Europa Expedition 2; Europa Outpost Expansion Mission | 2060-05-03 11:00:00+08:00 | 2060-06-23 09:00:00+08:00 | Surface Expedition; Outpost Expansion | Europa Outpost | Europa Expedition 2 supported installation and activation of the new expansion module after it reached the outpost. | Backfilled from Solar Shuttle 2 expansion delivery and ST-02 EE-2 operation windows. |
| 16 | Europa Outpost | db70ac3b-1035-4066-8e74-928e656bc39a | state | EE-2/EE-3 Crew Handoff | Europa Expedition 2; Europa Expedition 3 | 2060-06-23 09:00:00+08:00 | 2060-06-24 15:00:00+08:00 | Crew Handoff; Surface Expedition | Europa Outpost | Europa Expedition 3 overlapped with Expedition 2 during crew turnover and transfer of outpost responsibility. | Outpost-level handoff interval inferred from user-provided EE-3 arrival and EE-2 departure dates. |
| 17 | Europa Outpost | d7a1d501-ed5f-4065-a773-aa4ef101dede | event | Europa Expedition 3 Arrived | Europa Expedition 3 | 2060-06-23 09:00:00+08:00 | Europa Outpost | Europa Expedition 3 arrived via XH-01 to begin the next outpost rotation. | User-provided arrival date; treated as outpost arrival milestone within XH-01 EE-3 Jupiter System Operations. | ||
| 18 | Europa Outpost | 8649cb17-0bcb-4ba4-9f91-e9c441ff9793 | event | Europa Expedition 2 Departed | Europa Expedition 2 | 2060-06-24 15:00:00+08:00 | Europa Outpost | Europa Expedition 2 departed the outpost via ST-02 Kristen after completing crew handoff to Expedition 3. | User-provided departure date; treated as outpost departure milestone slightly ahead of ST-02 EE-2 system departure. | ||
| 19 | Europa Outpost | a7c9d010-5aed-43fc-a744-1a86ad9b15c8 | state | EE-3 Surface Operations | Europa Expedition 3 | 2060-06-24 15:00:00+08:00 | Surface Expedition | Europa Outpost | Europa Expedition 3 is the current resident crew. Crew status on 2060-06-24: 6 scientists at Lab, 2 medical at center hub, 1 commander and 1 pilot at observation station, 2 engineers at greenhouse. | User-provided current crew distribution for 2060-06-24. | |
| 20 | JW-01 金乌一号 | 5df95fe3-5f0d-4dc1-ad37-508adcf2eef2 | state | Construction | 2058-03-14 16:00:00+08:00 | 2059-03-08 08:00:00+08:00 | Construction | Star Port | Solar Shuttle 1 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 21 | JW-01 金乌一号 | e306c665-07c0-46dc-8127-b96775d616b9 | state | Assembly Complete | 2059-03-08 08:00:00+08:00 | 2059-04-13 08:00:00+08:00 | Assembly Complete | LEO | Assembly complete, preparing for commissioning | Timeline.xlsx inferred monthly phase. Raw: Assembly Complete | |
| 22 | JW-01 金乌一号 | 543dabdc-e61b-4a1c-8c4b-3e753d17cbbd | state | Trial Run | 2059-04-13 08:00:00+08:00 | 2059-08-06 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 23 | JW-01 金乌一号 | b99062ea-4547-4cdc-8bf1-3b1f0c28a4be | state | Mars One Expansion Outbound | Mars One Expansion | 2059-08-06 08:00:00+08:00 | 2059-10-24 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer | Timeline.xlsx inferred monthly phase. Raw: Earth-Mars |
| 24 | JW-01 金乌一号 | 30930d1b-d32b-4ef6-97ae-6d11c777ad53 | state | Mars One Expansion | Mars One Expansion | 2059-10-19 08:00:00+08:00 | 2060-08-09 05:10:00+08:00 | Base Expansion | Mars | Mars One Expansion | Timeline.xlsx inferred monthly phase. Raw: Mars One Expansion |
| 25 | JW-01 金乌一号 | 00c8b5c6-e363-4aee-a768-2fc3fa7a0138 | state | Mars Return | Mars One Expansion | 2060-08-09 05:10:00+08:00 | 2060-10-26 10:03:00+08:00 | Transfer | Sun | Back to Earth with Qingtian | Carrying Mars One component back |
| 26 | Mars One Base | 97b3a860-03c6-4ca3-a9c8-f94fd05adbe0 | event | Initial Cargo Landed | Mars Mission Demo | 2054-08-23 10:30:00+08:00 | Mars One Base | Cargo from Mars Mission Demo was landed at the future Mars One site for robotic setup. | Backfilled from XH-01 Mars Mission Demo support logs. | ||
| 27 | Mars One Base | dc082672-52a2-4142-a2b8-737991ee542f | state | MMD Surface Activation | Mars Mission Demo | 2054-08-23 12:00:00+08:00 | 2055-07-30 08:00:00+08:00 | Surface Activation | Mars One Base | Robotic systems activated the first surface power, comms, and cargo handling stack delivered by Mars Mission Demo. | Backfilled from XH-01 Mars Mission Demo support logs. |
| 28 | Mars One Base | 3141e93d-1e47-4264-864b-378815d8e871 | event | First Crewed Landing | Mars One Base Construction Mission 1 | 2055-07-30 09:30:00+08:00 | Mars One Base | The first crewed Mars One construction team landed and began surface assembly. | Backfilled from XH-01 MOCM-1 support logs. | ||
| 29 | Mars One Base | 9399f5f6-9412-455f-8683-b237bcdeab7b | state | MOCM-1 Initial Construction | Mars One Base Construction Mission 1 | 2055-07-30 10:00:00+08:00 | 2056-02-07 08:00:00+08:00 | Base Construction | Mars One Base | The first crewed construction campaign assembled the core habitat, power systems, and ascent support infrastructure. | Backfilled from XH-01 MOCM-1 support logs. |
| 30 | Mars One Base | afe0f5fe-6909-4351-8003-b3f78e9145d1 | state | MOCM-1 Autonomous Commissioning | Mars One Base Construction Mission 1 | 2056-02-07 08:00:00+08:00 | 2056-07-03 08:00:00+08:00 | Autonomous Standby | Mars One Base | After the first construction crew departed, the outpost remained in autonomous checkout ahead of the next build window. | Bridging interval inferred from the first and second Mars One construction campaigns. |
| 31 | Mars One Base | 0fd356d5-71ce-4219-a7fd-b9ff077f4f39 | state | MOCM-2 Base Construction | Mars One Construction Mission 2 | 2056-07-03 08:00:00+08:00 | 2056-09-15 08:00:00+08:00 | Base Construction | Mars One Base | Mission 2 expanded the surface habitat and continued utility trenching and storage build-out. | Backfilled from ST-01 MOCM-2 support logs. |
| 32 | Mars One Base | d96bd772-45eb-4010-96c2-1c942f4efc96 | state | MOCM-2/MOCM-3 Crew Handoff | Mars One Construction Mission 2; Mars One Base Construction Mission 3 | 2056-09-15 08:00:00+08:00 | 2056-10-12 08:00:00+08:00 | Base Construction; Crew Handoff | Mars One Base | Construction Mission 3 arrived before Mission 2 departed, enabling the first on-surface Mars One crew handoff. | Backfilled from ST-01 MOCM-2 and XH-01 MOCM-3 support logs. |
| 33 | Mars One Base | a05e86bb-77e5-4b99-a7d2-16a1dc810150 | state | MOCM-3 Base Construction | Mars One Base Construction Mission 3 | 2056-10-12 08:00:00+08:00 | 2056-11-19 08:00:00+08:00 | Base Construction | Mars One Base | The third construction campaign completed surface integration and prepared the outpost for continuous expedition occupancy. | Backfilled from XH-01 MOCM-3 support logs. |
| 34 | Mars One Base | 2b0a2dbf-3f28-449e-af86-75ebf87b408e | state | MOCM-3 and ME-1 Surface Operations | Mars One Base Construction Mission 3; Mars Expedition 1 | 2056-11-19 08:00:00+08:00 | 2057-02-12 08:00:00+08:00 | Base Construction; Surface Expedition | Mars One Base | Final construction work continued while Mars Expedition 1 began long-duration surface operations from the outpost. | Overlap inferred from XH-01 MOCM-3 and ST-02 ME-1 support logs. |
| 35 | Mars One Base | edfbaea5-331b-4a93-9458-044d3016eb7f | event | Phase 1 Construction Complete | Mars One Base Construction Mission 3; Mars Expedition 1 | 2057-02-12 09:00:00+08:00 | Mars One Base | Mars One entered sustained expedition service after the third construction wave wrapped up. | Completion milestone inferred from XH-01 MOCM-3 return window. | ||
| 36 | Mars One Base | e8003196-d035-49be-a721-144fec91a678 | state | ME-1 Surface Operations | Mars Expedition 1 | 2057-02-12 09:00:00+08:00 | 2057-06-22 08:00:00+08:00 | Surface Expedition | Mars One Base | Mars Expedition 1 operated the newly completed outpost and stabilized its life-support and logistics cadence. | Backfilled from ST-02 ME-1 support logs. |
| 37 | Mars One Base | fb511ee5-3343-4884-a094-59241d1d28e0 | state | ME-1/ME-2 Crew Handoff | Mars Expedition 1; Mars Expedition 2 | 2057-06-22 08:00:00+08:00 | 2057-09-08 08:00:00+08:00 | Surface Expedition; Crew Handoff | Mars One Base | Mars Expedition 2 arrived while Expedition 1 completed return preparations, overlapping on the surface during handoff. | Overlap inferred from ST-02 ME-1 and XH-01 ME-2 support logs. |
| 38 | Mars One Base | 5109f226-b843-4173-97cf-bb3b740927ed | state | ME-2 Surface Operations | Mars Expedition 2 | 2057-09-08 08:00:00+08:00 | 2058-04-17 08:00:00+08:00 | Surface Expedition | Mars One Base | Mars Expedition 2 took over continuous surface operations after the Expedition 1 crew departed. | Backfilled from XH-01 ME-2 support logs. |
| 39 | Mars One Base | 9c4ef55d-a472-4e19-b582-8f872e6c854a | state | ME-2/ME-3 Crew Handoff | Mars Expedition 2; Mars Expedition 3 | 2058-04-17 08:00:00+08:00 | 2058-04-18 08:00:00+08:00 | Surface Expedition; Crew Handoff | Mars One Base | Mars Expedition 3 overlapped briefly with Expedition 2 during the next surface crew handoff. | Overlap inferred from XH-01 ME-2 return and XH-02 ME-3 arrival timing. |
| 40 | Mars One Base | 66d8bc17-70e4-4c18-9c00-a8a2ffb4c1d3 | state | ME-3 Surface Operations | Mars Expedition 3 | 2058-04-18 08:00:00+08:00 | 2059-10-19 08:00:00+08:00 | Surface Expedition | Mars One Base | Mars Expedition 3 sustained the base through the long pre-expansion interval and remained on Mars after XH-02 departed uncrewed. | Backfilled from XH-02 ME-3 support logs and uncrewed return timing. |
| 41 | Mars One Base | faf59da6-de11-4f77-892a-5483f17a30e0 | event | Expansion Cargo Arrival | Mars One Expansion | 2059-10-19 09:00:00+08:00 | Mars One Base | Solar Shuttle 1 delivered the first Mars One expansion package to the surface site. | Backfilled from Solar Shuttle 1 Mars One Expansion support logs. | ||
| 42 | Mars One Base | 5112903a-12bb-4529-afa5-1e37eade53d3 | state | Mars One Expansion and ME-3 Surface Operations | Mars One Expansion; Mars Expedition 3 | 2059-10-19 09:00:00+08:00 | 2059-10-24 14:00:00+08:00 | Base Expansion; Surface Expedition | Mars One Base | Expansion work began while Mars Expedition 3 kept the outpost occupied ahead of the next crew arrival. | Overlap inferred from Solar Shuttle 1 expansion and XH-02 ME-4 arrival windows. |
| 43 | Mars One Base | e890d519-64ac-4152-902f-42c69a553b84 | state | ME-3/ME-4 Crew Handoff with Expansion Package | Mars One Expansion; Mars Expedition 3; Mars Expedition 4 | 2059-10-24 14:00:00+08:00 | 2059-11-04 08:00:00+08:00 | Base Expansion; Crew Handoff | Mars One Base | Mars Expedition 4 arrived with the expansion package while Mars Expedition 3 prepared for ascent and departure. | Overlap inferred from XH-02 ME-4 Part 1, Solar Shuttle 1 expansion, and XH-02 ME-3 return timing. |
| 44 | Mars One Base | 292bb2fc-4688-49e6-94e4-598da921d3e5 | state | Mars One Expansion and ME-4 Surface Operations | Mars One Expansion; Mars Expedition 4 | 2059-11-04 08:00:00+08:00 | 2060-02-23 08:00:00+08:00 | Base Expansion; Surface Expedition | Mars One Base | After Expedition 3 departed, Mars Expedition 4 continued surface operations alongside the active expansion campaign. | Backfilled from XH-02 ME-4 and Solar Shuttle 1 expansion support logs. |
| 45 | Mars One Base | 16e6a85a-2c04-4dc5-8132-b7cd16a104da | state | Expansion, ME-4, and Rover Delivery | Mars One Expansion; Mars Expedition 4; Mars One Rover Delivery | 2060-02-23 08:00:00+08:00 | 2060-05-23 08:00:00+08:00 | Base Expansion; Surface Expedition; Cargo Delivery | Mars One Base | The rover delivery campaign overlapped with base expansion and Expedition 4 surface operations. | Overlap inferred from Solar Shuttle 3 rover delivery, Solar Shuttle 1 expansion, and XH-02 ME-4 support logs. |
| 46 | Mars One Base | 8fc9c2b3-6272-44cb-a942-8bd4c83a6d05 | state | Mars One Expansion and ME-4 Surface Operations | Mars One Expansion; Mars Expedition 4 | 2060-05-23 09:30:00+08:00 | 2060-08-09 05:10:00+08:00 | Base Expansion; Surface Expedition | Mars One Base | Expansion work continued after rover deployment while Mars Expedition 4 remained the resident surface crew. | Backfilled from Solar Shuttle 1 expansion and XH-02 ME-4 support logs. |
| 47 | Mars One Base | 0d811cfd-1358-46de-b637-3d0b230da76e | event | Rover Deployment Complete | Mars One Rover Delivery; Mars Expedition 4 | 2060-05-23 09:30:00+08:00 | Mars One Base | The new Mars One surface rover entered service after the cargo delivery campaign wrapped up. | Backfilled from Solar Shuttle 3 rover delivery support logs. | ||
| 48 | Mars One Base | d86f43a9-ae09-4319-8905-98b35c1d585b | state | ME-4 Surface Operations | Mars Expedition 4 | 2060-08-09 06:00:00+08:00 | 2060-10-30 08:00:00+08:00 | Surface Expedition | Mars One Base | After expansion wrapped up, Mars Expedition 4 continued normal surface operations from the upgraded outpost. | Backfilled from XH-02 ME-4 support logs. |
| 49 | Mars One Base | 1b798abc-10bb-40cc-a517-4593512b0495 | event | Expansion Phase Complete | Mars One Expansion; Mars Expedition 4 | 2060-08-09 06:00:00+08:00 | Mars One Base | The main Mars One expansion phase was completed and Solar Shuttle 1 departed on the return leg. | Backfilled from Solar Shuttle 1 expansion return timing. | ||
| 50 | Solar Shuttle 2 | d190cc9e-e230-4299-8f13-1bda0f6b1aac | state | Construction | 2058-09-17 16:00:00+08:00 | 2059-09-11 08:00:00+08:00 | Construction | LEO | Solar Shuttle 2 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 51 | Solar Shuttle 2 | 8e33ce9e-2409-4b1c-af09-6a931fbe2d49 | state | Trial Run | 2059-09-11 08:00:00+08:00 | 2059-12-01 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 52 | Solar Shuttle 2 | 5a2092a8-ddad-41b3-9819-fa52557332ed | state | EOEM Outbound | Europa Outpost Expansion Mission | 2059-12-09 08:00:00+08:00 | 2060-05-01 08:00:00+08:00 | Transfer | Sun | ||
| 53 | Solar Shuttle 2 | c0271f19-e604-4c15-9c00-7118fec1928e | state | Europa Outpost Expansion Mission | Europa Outpost Expansion Mission | 2060-05-01 08:00:00+08:00 | 2060-05-06 07:25:00+08:00 | Outpost Expansion | Europa | Europa Outpost Expansion Package delivered via Qingtian Cargo Spacecraft | |
| 54 | Solar Shuttle 2 | 687615b6-144f-4fd5-b3ee-709e4eaea6aa | state | EOEM Inbound | Europa Outpost Expansion Mission | 2060-05-06 07:25:00+08:00 | 2060-06-26 08:00:00+08:00 | Transfer | Sun | ||
| 55 | Solar Shuttle 3 | 219355f0-1399-49af-b352-6728f0d4c82b | state | Construction | 2059-01-14 16:00:00+08:00 | 2059-12-14 08:00:00+08:00 | Construction | Star Port | Solar Shuttle 3 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 56 | Solar Shuttle 3 | aac31a1a-45c7-47f4-add3-fbfa30f9011f | state | Trial Run | 2059-12-14 08:00:00+08:00 | 2060-02-20 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 57 | Solar Shuttle 3 | 7deb1192-d6f0-4635-9a6d-39ab0c2adcfe | state | Mars One Rover Delivery | Mars One Rover Delivery | 2060-02-23 08:00:00+08:00 | 2060-05-23 08:00:00+08:00 | Cargo Delivery | Mars | Mars One Rover Delivery | Timeline.xlsx inferred monthly phase. Raw: Mars One Rover Delivery |
| 58 | Solar Shuttle 3 | d33a6759-0f54-4e71-909b-6d3916ca13dc | state | Mars Return | 2060-11-05 04:07:00+08:00 | Transfer | Sun | ||||
| 59 | ST-01 万星源 | ae003c1f-f74e-459b-ade2-74fcdae48605 | state | Construction | 2050-09-15 16:00:00+08:00 | 2054-04-28 16:00:00+08:00 | Construction | LEO | Construction | 2050-09-15 First module delivered to LEO via Vulture Shuttle | |
| 60 | 2053-02-02 Assembly Halted | ||||||||||
| 61 | ST-01 万星源 | 105a5eac-4ca1-4a5a-a9ad-bc2278d46f01 | state | Trial Run | 2054-05-12 08:00:00+08:00 | 2054-08-22 08:00:00+08:00 | Trial Run | Lunar Orbit | Trial Run before commissioning | 2054-05-12 Begin Trial Run in Earth Orbit, testing all systems | |
| 62 | 2054-08-22 Trial Run complete, all systems perform as expected. Including multiple run to GEO and Lunar Orbit before returning to LEO. | ||||||||||
| 63 | ST-01 万星源 | f6ae082d-5c36-44f9-92da-d5e568a71fea | state | Deep Space Test Mission | 2054-09-07 08:00:00+08:00 | 2054-11-28 08:00:00+08:00 | Deep Space Test Mission | Earth-Sun L2 | Uncrewed mission to Earth-Sun Lagrange Point 2 to test long-duration operations | 2054-09-07 Begin Deep Space Test Mission | |
| 64 | 2054-11-28 Test Mission Complete, all systems nominal. Returning to LEO. | ||||||||||
| 65 | ST-01 万星源 | 503a0035-1cd7-4e8e-9bc6-922c2e5c3171 | state | Maintenance before Commissioning | 2054-12-01 08:00:00+08:00 | 2055-02-28 08:00:00+08:00 | Maintenance before Commissioning | LEO | |||
| 66 | ST-01 万星源 | 4bfddc84-dfec-43e3-b534-4fb798bcc73f | state | ISSEM-1 Mercury Transfer | Inner Solar System Exploration Mission 1 | 2055-03-20 08:00:00+08:00 | 2055-04-17 08:00:00+08:00 | Transfer | Sun | Earth-Mecury transfer, using standard trajectory with 127km/s of departure burn | 2055-03-20 Picking up crew for Inner Solar System Exploration Mission 1 |
| 67 | 2055-03-22 Earth Departure for Mecury | ||||||||||
| 68 | 2055-04-17 Mercury Arrival | ||||||||||
| 69 | ST-01 万星源 | 42698c8c-a1cc-4742-9885-7b9e650f9867 | state | ISSEM-1 Mercury Operations | Inner Solar System Exploration Mission 1 | 2055-04-18 08:00:00+08:00 | 2055-08-14 08:00:00+08:00 | Planetary Operations | Mercury | First crewed mission to Mercury | 2055-04-17 Mercury Arrival |
| 70 | 2055-04-18 Orbital Survey of Mercury begins | ||||||||||
| 71 | 2055-06-14 First Crewed Surface Landing on Mercury | ||||||||||
| 72 | 2055-06-15 EVA operations commence | ||||||||||
| 73 | 2055-06-30 Surface operations complete, returning to orbit | ||||||||||
| 74 | 2055-08-15 Departure from Mercury for Venus | ||||||||||
| 75 | ST-01 万星源 | 2adfa016-b23a-4459-af6e-a84da2aa2469 | state | ISSEM-1 Venus Transfer | Inner Solar System Exploration Mission 1 | 2055-08-15 08:00:00+08:00 | 2055-10-01 08:00:00+08:00 | Transfer | Sun | Mecury-Venus transfer, using standard trajectory with 85km/s of departure burn | 2055-08-15 Departure from Mercury for Venus |
| 76 | 2055-10-01 Venus Arrival | ||||||||||
| 77 | ST-01 万星源 | f28469ee-1dbc-4232-98ff-91f7abcb9d59 | state | ISSEM-1 Venus Operations | Inner Solar System Exploration Mission 1 | 2055-10-01 08:00:00+08:00 | 2056-03-24 08:00:00+08:00 | Planetary Operations | Venus | First crewed mission to Venus, no crewed landing attempted due to extreme surface conditions. Probe deployment only. | 2055-10-01 Venus Arrival |
| 78 | 2055-10-02 Orbital Survey of Venus begins | ||||||||||
| 79 | 2055-10-10 Landing Probe Deployment | ||||||||||
| 80 | 2055-11-10 Begin Upper Atmosphere Survey via Callisto MPV | ||||||||||
| 81 | 2056-03-24 Departure from Venus for Earth | ||||||||||
| 82 | ST-01 万星源 | 1f6e85aa-121a-4f47-95b6-35f040da055c | state | ISSEM-1 Inbound | Inner Solar System Exploration Mission 1 | 2056-03-24 08:00:00+08:00 | 2056-04-12 08:00:00+08:00 | Transfer | Sun | Venus-Earth transfer, using standard trajectory with 75km/s of departure burn | 2056-03-24 Departure from Venus for Earth |
| 83 | 2056-04-12 Earth Arrival | ||||||||||
| 84 | ST-01 万星源 | 540c146e-0d48-4735-8eb4-6fe08506b705 | state | Maintenance | 2056-04-15 08:00:00+08:00 | 2056-05-31 08:00:00+08:00 | Maintenance | LEO | |||
| 85 | ST-01 万星源 | ffd625b0-0de4-4f47-8c8d-36669a1675f6 | state | MOCM-2 Outbound | Mars One Construction Mission 2 | 2056-06-02 08:00:00+08:00 | 2056-07-01 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer, using standard trajectory with 126km/s of departure burn | 2056-06-02 Picking up crew for Mars One Construction Mission 2 |
| 86 | 2056-06-04 Picking up Mars One construction cargo | ||||||||||
| 87 | 2056-06-06 Earth Departure for Mars | ||||||||||
| 88 | 2056-07-01 Mars Arrival, First crewed mission to Mars using Stellaria | ||||||||||
| 89 | ST-01 万星源 | 12059276-d10a-4a37-9b8c-6a6183768504 | state | MOCM-2 Mars Operations | Mars One Construction Mission 2 | 2056-07-03 08:00:00+08:00 | 2056-10-12 08:00:00+08:00 | Base Construction | Mars | Continuing the construction of Mars One Base | 2056-07-03 Crew descend to Martian Surface, Continuing the construction of Mars One Base |
| 90 | 2056-07-20 Heavy Cargo Delivery to Surface via Callisto MPV | ||||||||||
| 91 | 2056-09-17 Mars One Construction Mission 3 Crew Arrival via XH-01, joining Stellaria crew. First Crew Handover on Mars. | ||||||||||
| 92 | 2056-10-12 Mars One Construction Mission 2 Crew ascend to Stellaria | ||||||||||
| 93 | 2056-10-15 Departure from Mars for Earth | ||||||||||
| 94 | ST-01 万星源 | cf351aa5-4149-4938-939b-edcb846f4b14 | state | MOCM-2 Inbound | Mars One Construction Mission 2 | 2056-10-15 08:00:00+08:00 | 2056-11-03 08:00:00+08:00 | Transfer | Sun | Mars-Earth transfer, using Fast Return trajectory with 212km/s of departure burn | 2056-10-15 Departure from Mars for Earth |
| 95 | 2056-11-03 Earth Arrival | ||||||||||
| 96 | ST-01 万星源 | fd8fba0b-82bb-4ad3-bc38-58745291627b | state | Maintenance | 2056-11-04 08:00:00+08:00 | 2056-12-10 08:00:00+08:00 | Maintenance | LEO | |||
| 97 | ST-01 万星源 | 7747339c-f602-4ddf-8511-6862006f789b | state | EOCM-1 Outbound | Europa Outpost Construction Mission 1 | 2056-12-15 08:00:00+08:00 | 2057-02-25 08:00:00+08:00 | Transfer | Sun | Earth-Europa transfer, using standard trajectory with 165km/s of departure burn | 2056-12-15 Start preparations for Europa Outpost Construction Mission 1 |
| 98 | 2056-12-20 Europa Outpost Construction Package arrival via Qingtian Cargo Shuttle | ||||||||||
| 99 | 2056-12-31 Picking up crew for Europa Outpost Construction Mission 1 | ||||||||||
| 100 | 2057-01-02 Earth Departure for Europa | ||||||||||
| 101 | ST-01 万星源 | 545f687e-bd2c-409a-8fb8-186a6dead67e | state | EOCM-1 Europa Operations | Europa Outpost Construction Mission 1 | 2057-02-27 08:00:00+08:00 | 2057-10-01 08:00:00+08:00 | Outpost Construction | Europa | First crewed mission to Europa | 2057-02-27 Heavy Cargo Delivery to Surface via Qingtian Cargo Shuttle |
| 102 | 2057-03-15 Crew descend to Europan Surface, Beginning construction of Europa Outpost | ||||||||||
| 103 | 6 crewed ascend and descend operations to Europa Surface via Callisto MPV between 2057-03-15 and 2057-09-15 | ||||||||||
| 104 | 2057-10-01 Europa Outpost Construction Mission 1 Crew ascend to Stellaria, wrapping up construction phase 1 | ||||||||||
| 105 | 2057-10-04 Europa Departure for Earth | ||||||||||
| 106 | ST-01 万星源 | 43f2ece9-283b-4484-b838-d684b9ada4d6 | state | EOCM-1 return to Earth | Europa Outpost Construction Mission 1 | 2057-10-04 08:00:00+08:00 | 2057-12-20 08:00:00+08:00 | Transfer | Europa | Europa-Earth transfer, using Fast trajectory with 216km/s of departure burn | 2057-10-04 Europa Departure for Earth |
| 107 | 2057-12-20 Earth Arrival | ||||||||||
| 108 | ST-01 万星源 | 7d6a56c8-9ebc-4940-813b-54ee2c9711f4 | state | Maintenance and Upgrades | 2058-01-05 08:00:00+08:00 | 2058-05-15 08:00:00+08:00 | Maintenance and Upgrades | LEO | Extensive overhauls to bring ST-01 closer to full Stellaria specifications. Add more greenhouse modules, upgrade life support systems, add another Rotating Habitat Ring | ||
| 109 | ST-01 万星源 | cad8537e-1966-4b3c-abed-35c511950ac8 | state | SEM-1 outbound | Saturn Exploration Mission 1 | 2058-06-01 08:00:00+08:00 | 2058-10-12 08:00:00+08:00 | Transfer | Sun | Earth-Saturn transfer, using Fast trajectory with 210km/s of departure burn | First crewed mission to Saturn |
| 110 | ST-01 万星源 | 022b0296-5c1a-41f8-8634-97dc663b05d9 | state | SEM-1 Saturn Operations | Saturn Exploration Mission 1 | 2058-10-12 08:00:00+08:00 | 2059-07-01 08:00:00+08:00 | Planetary Operations | Saturn System | First crewed mission to Saturn | 2059-05-31 Parked into Iapetus orbit, orbital science completed |
| 111 | 2059-06-15 Start Iapetus Surface operation | ||||||||||
| 112 | ST-01 万星源 | f536e950-a024-45e3-95ff-da5f77772119 | state | SEM-1 Inbound | Saturn Exploration Mission 1 | 2059-07-01 08:00:00+08:00 | 2059-11-24 08:00:00+08:00 | Transfer | Sun | Saturn-Earth transfer, using standard trajectory with 162km/s of departure burn | |
| 113 | ST-01 万星源 | 3fce336c-7ac9-4117-9239-bf939dfe1ad1 | state | Maintenance and Upgrades | 2059-11-25 08:00:00+08:00 | 2060-02-10 08:00:00+08:00 | Maintenance and Upgrades | Star Port | Upgrades complete, ST-01 now fully meets Stellaria specifications. | ||
| 114 | ST-01 万星源 | 8a9de074-6348-4190-bd27-e3bdeddb70f7 | state | OSSEM-1 Outbound | Outer Solar System Exploration Mission 1 | 2060-02-11 08:00:00+08:00 | 2060-07-24 20:11:00+08:00 | Transfer | Sun | 地球出发前往海王星 | 23 crew on board |
| 115 | ST-01 万星源 | 18b3429e-28d3-489c-b65c-35e0e9775a0d | state | OSSEM-1 Neptune Exploration | OSSEM-1; Neptune | 2060-07-25 06:40:00+08:00 | Exploration | Neptune | |||
| 116 | ST-02 Kristen | eefd7712-b6f4-496c-9bc8-8eb9546887b8 | state | Construction | 2052-01-14 16:00:00+08:00 | 2053-02-10 08:00:00+08:00 | Construction | LEO | ST-02 Kristen Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 117 | ST-02 Kristen | 721dec30-3c58-4885-8fda-22e2960ef4a0 | state | Assembly Halted | 2053-02-10 08:00:00+08:00 | 2053-05-12 08:00:00+08:00 | Assembly Halted | LEO | Assembly halted pending redesign and program review | Timeline.xlsx inferred monthly phase. Raw: Assembly Halted | |
| 118 | ST-02 Kristen | 8226a3aa-1896-42e2-9e5e-0fca750d229d | state | Reconfiguring to ST-02 | 2053-05-12 08:00:00+08:00 | 2055-10-13 08:00:00+08:00 | Reconfiguring to ST-02 | LEO | Vehicle reconfiguration and systems integration | Timeline.xlsx inferred monthly phase. Raw: Reconfiguring to ST-02 | |
| 119 | ST-02 Kristen | 826e67d8-e876-41e5-9551-a80f700e90cd | state | Trial Run | 2055-10-13 08:00:00+08:00 | 2056-03-10 08:00:00+08:00 | Trial Run | Lunar Orbit | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 120 | ST-02 Kristen | b5a01aed-7a98-4f81-a84f-efb59b8f2479 | state | Deep Space Test Mission | 2056-03-10 08:00:00+08:00 | 2056-06-08 08:00:00+08:00 | Deep Space Test Mission | Earth-Sun L2 | Uncrewed Mission to Earth-Sun L2 | Timeline.xlsx inferred monthly phase. Raw: Deep Space Test Mission / Uncrewed Mission to Earth-Sun L2 | |
| 121 | ST-02 Kristen | 7b7fd38f-2647-4ed8-b1bc-27e94861b15d | state | Maintenance | 2056-06-08 08:00:00+08:00 | 2056-11-19 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | ||
| 122 | ST-02 Kristen | ca8f8223-800b-4562-8405-a270d3960a6e | state | ME-1 Mars Operations | Mars Expedition 1 | 2056-11-19 08:00:00+08:00 | 2057-09-08 08:00:00+08:00 | Planetary Operations | Mars | Mars Expedition 1 | Timeline.xlsx inferred monthly phase. Raw: Mars Expedition 1 |
| 123 | ST-02 Kristen | a7c43eae-31fc-451d-8bbc-fd6f3da63f22 | state | Maintenance | 2057-09-08 08:00:00+08:00 | 2057-10-06 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | ||
| 124 | ST-02 Kristen | a61ee6fc-5495-4b5b-a505-968669b81b18 | state | EOCM-2 Outbound | Europa Outpost Construction Mission 2 | 2057-10-06 08:00:00+08:00 | 2058-01-19 08:00:00+08:00 | Transfer | Sun | Earth-Europa transfer | Timeline.xlsx inferred monthly phase. Raw: Earth-Europa |
| 125 | ST-02 Kristen | fb17cab1-dcbc-4814-83e9-5fb81a73f869 | state | EOCM-2 Europa Operations | Europa Outpost Construction Mission 2 | 2058-01-19 08:00:00+08:00 | 2058-09-06 08:00:00+08:00 | Outpost Construction | Europa | Europa Outpost Construction Mission 2 | Timeline.xlsx inferred monthly phase. Raw: Europa Outpost Construction Mission 2 |
| 126 | ST-02 Kristen | efdb28dd-3e02-4b16-80e8-7a2d4df76825 | state | EOCM-2 Inbound | Europa Outpost Construction Mission 2 | 2058-09-06 08:00:00+08:00 | 2058-11-08 08:00:00+08:00 | Transfer | Sun | Europa-Earth transfer | Timeline.xlsx inferred monthly phase. Raw: Europa-Earth |
| 127 | ST-02 Kristen | 77c71061-354d-4045-b5cd-5cd6b1e8dd65 | state | Maintenance and Upgrades | 2058-11-08 08:00:00+08:00 | 2059-04-06 08:00:00+08:00 | Maintenance and Upgrades | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance and Upgrades | ||
| 128 | ST-02 Kristen | fe21560f-60f4-48bb-bbdb-e2c1ab6fe3af | state | EE-2 Outbound | Europa Expedition 2 | 2059-04-06 08:00:00+08:00 | 2059-06-25 08:00:00+08:00 | Transfer | Sun | Earth-Europa transfer | |
| 129 | ST-02 Kristen | 65910288-0c2a-4800-bfce-39495efafce2 | state | EE-2 Europa Operations | Europa Expedition 2 | 2059-06-25 08:00:00+08:00 | 2060-06-28 02:47:00+08:00 | Planetary Operations | Europa | Supporting Europa Expedition 2 | |
| 130 | ST-02 Kristen | e77cd6b5-a2e2-479b-817b-67c1c59bfdee | state | EE-2 Inbound | Europa Expedition 2 | 2060-06-28 02:47:00+08:00 | 2060-08-30 06:11:00+08:00 | Transfer | Sun | ||
| 131 | ST-02 Kristen | 6c7a8724-1324-4a68-81e1-3dc2ce1ce980 | state | Upgrade to Stellaria Class | 2060-08-30 07:26:00+08:00 | 2061-06-30 08:00:00+08:00 | Upgrade | Star Ring Station | A full overhaul to bring ST-02 to full Stellaria standard | ||
| 132 | ST-03 Muelsyse | 10030cb4-2626-483a-8682-db9eed90da71 | state | Construction | 2056-02-13 16:00:00+08:00 | 2059-07-07 08:00:00+08:00 | Construction | LEO | ST-03 Muelsyse Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 133 | ST-03 Muelsyse | 520e5ad4-e79c-458d-8387-76ba0a120b2e | state | Assembly Complete | 2059-07-07 08:00:00+08:00 | 2059-08-12 08:00:00+08:00 | Assembly Complete | LEO | Assembly complete, preparing for commissioning | Timeline.xlsx inferred monthly phase. Raw: Assembly Complete | |
| 134 | ST-03 Muelsyse | 068b82d8-e107-465b-98b8-eba39739ee63 | state | Trial Run | 2059-08-12 08:00:00+08:00 | 2060-03-07 08:00:00+08:00 | Trial Run | Lunar Orbit | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 135 | ST-03 Muelsyse | 16e6ce3d-d2ef-4910-a1ff-4670cbb63fb7 | state | Maintenance | 2060-03-07 08:00:00+08:00 | 2060-06-10 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | ||
| 136 | ST-03 Muelsyse | e61bb0d2-ab64-4f79-a18a-77dea92eb3ab | state | Deep Space Test | 2060-06-15 08:00:00+08:00 | 2060-09-10 08:00:00+08:00 | Deep Space Test | Sun-Earth L2 | |||
| 137 | ST-03 Muelsyse | 2f391faf-4061-45cc-bcd5-ce5956cff9bd | state | Pre-commissioning Maintenance | 2060-09-10 08:00:00+08:00 | 2060-10-25 08:00:00+08:00 | Maintenance | LEO | |||
| 138 | ST-04 | b5fceb9b-264c-4842-a329-0a7c4ccc9779 | state | Construction | 2059-07-12 16:00:00+08:00 | 2063-01-07 08:00:00+08:00 | Construction | LEO | ST-04 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 139 | ST-04 | 4dfd3584-ad5c-4d6d-9c86-d337d627fb9e | state | Assembly Complete | 2063-01-07 08:00:00+08:00 | 2063-02-12 08:00:00+08:00 | Assembly Complete | LEO | Assembly complete, preparing for commissioning | Timeline.xlsx inferred monthly phase. Raw: Assembly Complete | |
| 140 | ST-04 | 93f7700f-d0be-48a9-8fdf-f1d0a824ac86 | state | Trial Run | 2063-02-12 08:00:00+08:00 | 2063-09-06 08:00:00+08:00 | Trial Run | Lunar Orbit | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 141 | ST-04 | c6ac0899-e235-4de6-8a9e-89ff98e725fa | state | Maintenance | 2063-09-06 16:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | |||
| 142 | XH-01 羲和 | 1934e3f4-0d0c-4699-b4bd-753744ab29a1 | state | Construction | 2050-03-16 00:00:00+08:00 | 2052-02-07 00:00:00+08:00 | Construction | LEO | Xihe XH-01 Construction | 2050-03-15 First module delivered to LEO via Vulture Shuttle | |
| 143 | 2052-02-06 Assembly completed in LEO | ||||||||||
| 144 | XH-01 羲和 | a0a3bed9-91a2-45c7-be54-7216e33f87b3 | state | Fitting | 2052-02-07 08:00:00+08:00 | 2052-05-31 08:00:00+08:00 | Fitting | LEO | |||
| 145 | XH-01 羲和 | 8ee54d7e-4310-43dc-a703-f633c1013405 | state | Trial Run | 2052-06-01 08:00:00+08:00 | 2052-11-30 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | 2052-06-01 Begin Trial Run in Earth Orbit, testing all systems | |
| 146 | 2052-11-30 Trial Run complete, all systems perform as expected. Including multiple run to GEO and Lunar Orbit before returning to LEO. | ||||||||||
| 147 | XH-01 羲和 | 4464a892-910e-416c-b044-0683b6516003 | state | Maintenance | 2052-12-01 08:00:00+08:00 | 2053-01-05 08:00:00+08:00 | Maintenance | Earth | |||
| 148 | XH-01 羲和 | d103bc92-da3a-4ba6-965e-a9385e208581 | state | Deep Space Test Mission | 2053-01-12 08:00:00+08:00 | 2053-12-18 08:00:00+08:00 | Deep Space Test Mission | Earth-Sun L2 | Long term uncrewed test | 2053-01-12 Uncrewed mission to Earth-Sun L2 point to test deep space operations | |
| 149 | 2053-12-18 Back to LEO | ||||||||||
| 150 | XH-01 羲和 | 80931042-da68-435b-94f5-da2d1b79e801 | state | Maintenance and Upgrades | 2054-01-07 08:00:00+08:00 | 2054-06-28 08:00:00+08:00 | Maintenance and Upgrades | LEO | |||
| 151 | XH-01 羲和 | e54817e0-6809-404d-be62-c6017d143362 | state | MMD Outbound | Mars Mission Demo | 2054-07-10 08:00:00+08:00 | 2054-08-21 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer, Uses standard trajectory with 102km/s of departure burn | |
| 152 | XH-01 羲和 | 23b4304f-8fca-4d78-8a93-c9f78fab51e0 | state | MMD Mars Operations | Mars Mission Demo | 2054-08-21 08:00:00+08:00 | 2055-01-10 08:00:00+08:00 | Planetary Operations | Mars | Uncrewed, Deliver the first Mars-One base construction equipment package to Mars orbit. | 2054-08-21 Mars Orbit Arrival, deploy equipment package to Mars surface via lander |
| 153 | 2055-01-10 Mars Departure, return to Earth | ||||||||||
| 154 | XH-01 羲和 | ded06cd6-f9a4-4646-9be4-2f01cf067334 | state | MMD Inbound | Mars Mission Demo | 2055-01-10 08:00:00+08:00 | 2055-02-28 08:00:00+08:00 | Transfer | Sun | Uses standard trajectory with 97km/s of departure burn | 2055-02-28 Earth Arrival, demo run complete, all systems perform as expected. |
| 155 | XH-01 羲和 | fecc4450-ba77-4bc6-b794-164766a0c8b8 | state | Maintenance and Upgrades | 2055-03-01 08:00:00+08:00 | 2055-05-14 08:00:00+08:00 | Maintenance and Upgrades | LEO | |||
| 156 | XH-01 羲和 | aab3125c-c99e-4af5-ab64-ffe7fda48ad7 | state | MOCM-1 Outbound | Mars One Base Construction Mission 1 | 2055-06-15 08:00:00+08:00 | 2055-07-30 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer, Uses standard trajectory with 115km/s of departure burn | 2055-06-15 Picking up crew for Mars One base Construction Mission 1 |
| 157 | 2055-06-18 Earth Departure for Mars | ||||||||||
| 158 | XH-01 羲和 | ec34d68b-4728-42eb-af79-b3e8805aa253 | state | MOCM-1 Mars Operations | Mars One Base Construction Mission 1 | 2055-07-30 08:00:00+08:00 | 2056-02-07 08:00:00+08:00 | Base Construction | Mars | First Crewed mission to Mars. Construction for Mars One base begin | 2055-07-30 Mars Arrival, begin base construction |
| 159 | 2056-02-07 Mars Departure, return to Earth. First to use quick return trajectory. | ||||||||||
| 160 | XH-01 羲和 | bdf99335-d329-4bd2-8e17-27ac1f097ca9 | state | MOCM-1 Inbound | Mars One Base Construction Mission 1 | 2056-02-07 08:00:00+08:00 | 2056-03-18 08:00:00+08:00 | Transfer | Sun | Mars-Earth transfer. Uses Fast-travel trajectory with 207km/s of departure burn | 2056-03-18 Earth Arrival, crew return |
| 161 | XH-01 羲和 | 8e1be891-57ec-4551-b114-232f4681b2b1 | state | Maintenance and Upgrades | 2056-03-25 08:00:00+08:00 | 2056-06-20 08:00:00+08:00 | Maintenance and Upgrades | LEO | |||
| 162 | XH-01 羲和 | ea2024c5-95e6-4acc-a88d-998183a35a5a | state | MOCM-3 Outbound | Mars One Base Construction Mission 3 | 2056-07-30 08:00:00+08:00 | 2056-09-15 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer. Uses standard trajectory with 95km/s of departure burn | 2056-07-30 Picking up crew for Mars One base Construction Mission 3 |
| 163 | 2056-08-02 Earth Departure for Mars | ||||||||||
| 164 | XH-01 羲和 | fd22c4b2-4938-4c01-ae92-e84f14d8b8dd | state | MOCM-3 Operations | Mars One Base Construction Mission 3 | 2056-09-15 08:00:00+08:00 | 2057-02-12 08:00:00+08:00 | Base Construction | Mars | Third Mars One base construction. First crew hand-off on Mars(with Mars One base construction 2). | 2056-09-15 Mars Arrival, continue base construction |
| 165 | 2057-02-12 Mars Departure, return to Earth. | ||||||||||
| 166 | XH-01 羲和 | e5f549b9-0446-48be-a606-d9c1ada664b7 | state | MOCM-3 Inbound | Mars One Base Construction Mission 3 | 2057-02-12 08:00:00+08:00 | 2057-03-25 08:00:00+08:00 | Transfer | Sun | Mars-Earth transfer. Uses standard trajectory with 122km/s of departure burn | 2037-03-25 Earth Arrivasl, crew return |
| 167 | XH-01 羲和 | 6d57910a-7459-4b74-b0ea-e10ee7cab87b | state | Maintenance | 2057-03-26 08:00:00+08:00 | 2057-04-25 08:00:00+08:00 | Maintenance | LEO | |||
| 168 | XH-01 羲和 | 30c84287-e5d1-473c-93fb-9d36d426516e | state | ME-2 Outbound | Mars Expedition 2 | 2057-05-05 08:00:00+08:00 | 2057-06-22 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer using standard trajectory with 110km/s of departure burn | 2027-05-05 Picking up crew for Mars Expedition 2 |
| 169 | 2027-05-09 Earth Departure for Mars | ||||||||||
| 170 | XH-01 羲和 | 7f5da9b3-94fa-4bd5-a6bd-94f6841c71a2 | state | ME-2 Mars Operations | Mars Expedition 2 | 2057-06-22 08:00:00+08:00 | 2058-04-18 08:00:00+08:00 | Planetary Operations | Mars | Second long term Mars Expedition, first mission to Mars One base after the construction is completed. | |
| 171 | First mission involving space tourism to Mars. | 2057-06-22 Mars Arrival | |||||||||
| 172 | 2057-06-25 Mars EDL and surface operations begin | ||||||||||
| 173 | 2058-04-10 Begin Mars Departure preparations | ||||||||||
| 174 | 2058-04-18 Mars Departure for Earth | ||||||||||
| 175 | XH-01 羲和 | 058bbf6d-5c51-49c4-8516-8b6931db53c1 | state | ME-2 Inbound | Mars Expedition 2 | 2058-04-18 08:00:00+08:00 | 2058-05-20 08:00:00+08:00 | Transfer | Sun | Mars-Earth transfer using standard trajectory with 115km/s of departure burn | 2058-04-18 Mars Departure for Earth |
| 176 | 2058-05-20 Earth Arrival, crew return | ||||||||||
| 177 | XH-01 羲和 | 161bb9f0-3d2a-46da-9044-9184e0704413 | state | Maintenance | 2058-05-21 08:00:00+08:00 | 2058-06-18 08:00:00+08:00 | Maintenance | LEO | |||
| 178 | XH-01 羲和 | 4ff368c4-503b-42ce-9e82-b4da291d3203 | state | EE-1 Outbound | Europa Expedition 1 | 2058-07-10 08:00:00+08:00 | 2058-09-25 08:00:00+08:00 | Transfer | Sun | Earth-Jupiter transfer using standard trajectory with 160km/s of departure burn | 2058-07-10 Picking up crew for Europa Expedition 1 |
| 179 | 2058-07-12 Earth Departure for Jupiter system | ||||||||||
| 180 | 2058-09-25 Europa Arrival | ||||||||||
| 181 | XH-01 羲和 | f01bfb99-f981-45f6-808b-7c5222503715 | state | EE-1 Jupiter System Operations | Europa Expedition 1 | 2058-09-25 08:00:00+08:00 | 2059-07-10 08:00:00+08:00 | Planetary Operations | Jupiter System | First standard crew expedition to Europa Outpost to begin exploration of Jupiter system | |
| 182 | Long term surface operation at Europa Outpost, followed by exploration of IO and Ganymede | 2058-09-25 Europa Arrival | |||||||||
| 183 | 2058-09-27 Europa descend, begin surface operation at Europa Outpost | ||||||||||
| 184 | 2058-12-15 Europa ascend, begin Jupiter system exploration | ||||||||||
| 185 | 2058-12-20 Begin IO exploration | ||||||||||
| 186 | 2059-01-20 Return to Europa Outpost | ||||||||||
| 187 | 2059-06-20 Begin Europa Outpost departure preparations | ||||||||||
| 188 | 2059-06-25 Europa Expedition 1 crew ascend from Europa Outpost | ||||||||||
| 189 | 2059-07-05 begin Ganymede exploration | ||||||||||
| 190 | 2059-07-10 Departure for Earth, upgrade planned. | ||||||||||
| 191 | XH-01 羲和 | 92315017-7011-4930-aabb-d00a6f3f4994 | state | EE-1 Inbound | Europa Expedition 1 | 2059-07-10 08:00:00+08:00 | 2059-11-15 08:00:00+08:00 | Transfer | Sun | Uses standard trajectory with 112km/s of departure burn | |
| 192 | Parked to Star Port | 2059-07-10 Departure for Earth. | |||||||||
| 193 | 2059-11-15 Earth Arrival, Park to Star Port. | ||||||||||
| 194 | XH-01 羲和 | 21a37859-aa16-4c29-b17a-8012f6037478 | state | Maintenance and Upgrades | 2059-11-16 08:00:00+08:00 | 2060-02-19 08:00:00+08:00 | Maintenance and Upgrades | Star Port | Greenhouse upgrade to support long term deep space missions | ||
| 195 | XH-01 羲和 | ee52cc53-7d9c-4134-ba1b-4f7cfb8fdce9 | state | EE-3 Outbound | Europa Expedition 3 | 2060-02-20 08:00:00+08:00 | 2060-05-01 08:00:00+08:00 | Transfer | Sun | Uses standard trajectory with 163km/s of departure burn | 2060-02-20 Picking up Europa Expedition 3 crew, On its way to explore Jupiter systems before sending crew to Europa Outpost |
| 196 | XH-01 羲和 | 91d4948a-ae04-43a8-ac3b-def9caecc8e5 | state | EE-3 Jupiter System Operations | Europa Expedition 3 | 2060-05-01 08:00:00+08:00 | Jupiter Exploration; Outpost Rotation | Jupiter System | Crew Rotation to Euorpa Outpost. First to explore Jupiter's moons, then to Europa Outpost | 2060-05-01 Jupiter Arrival | |
| 197 | 2060-05-02 Io Arrival | ||||||||||
| 198 | 2060-05-07 Io descend | ||||||||||
| 199 | 2060-05-09 Io departure | ||||||||||
| 200 | 2060-05-11 Ganymede Arrival | ||||||||||
| 201 | 2060-05-12 Ganymede descend | ||||||||||
| 202 | 2060-05-21 Ganymede Departure for Callisto | ||||||||||
| 203 | 2060-05-25 Callisto Arrival | ||||||||||
| 204 | XH-02 太白 | 4958ffd7-2e23-40a6-9b96-e46c61943028 | state | Construction | 2054-12-11 08:00:00+08:00 | 2056-10-04 08:00:00+08:00 | Construction | LEO | XH-02 太白 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 205 | XH-02 太白 | b99a2638-7560-45ec-9328-6a4a0e4cf685 | state | Assembly Complete | 2056-10-04 08:00:00+08:00 | 2056-11-11 08:00:00+08:00 | Assembly Complete | LEO | Assembly complete, preparing for commissioning | Timeline.xlsx inferred monthly phase. Raw: Assembly Complete | |
| 206 | XH-02 太白 | 6ec7033c-e711-4148-ab7d-e075f3288021 | state | Trial Run | 2056-11-11 08:00:00+08:00 | 2057-03-12 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 207 | XH-02 太白 | 669a993c-fe3d-4126-b066-2650e98dfb3e | state | Maintenance | 2057-03-12 08:00:00+08:00 | 2057-04-25 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | ||
| 208 | XH-02 太白 | 7c166ff7-df3b-495d-a7df-9b99949e23f0 | state | AEM Outbound | Asteroid Exploration Mission | 2057-05-04 08:00:00+08:00 | 2057-07-17 08:00:00+08:00 | Transfer | Sun | Earth-Vesta transfer | Timeline.xlsx inferred monthly phase. Raw: Earth-Vesta |
| 209 | XH-02 太白 | 99eb75ba-e02b-4cdc-a5f1-3ea547cc7d4a | state | AEM Vesta Operations | Asteroid Exploration Mission | 2057-07-17 08:00:00+08:00 | 2058-01-04 08:00:00+08:00 | Asteroid Operations | Vesta | Asteroid exploration mission at Vesta | Timeline.xlsx inferred monthly phase. Raw: Vesta Mission |
| 210 | XH-02 太白 | d74dfb61-fd3a-492c-b019-253ec9cd826d | state | AEM Inbound | Asteroid Exploration Mission | 2058-01-04 08:00:00+08:00 | 2058-04-17 08:00:00+08:00 | Transfer | Sun | Vesta-Earth transfer | Timeline.xlsx inferred monthly phase. Raw: Vesta-Earth |
| 211 | XH-02 太白 | 956cc319-668e-45d1-ab7c-9f0aa408c5f7 | state | ME-3 Mars Operations | Mars Expedition 3 | 2058-04-17 08:00:00+08:00 | 2059-05-04 08:00:00+08:00 | Planetary Operations | Mars | Mars Expedition 3 | Timeline.xlsx inferred monthly phase. Raw: Mars Expedition 3 |
| 212 | XH-02 太白 | f43aa249-80d1-426c-9aca-a341411be98d | state | Uncrewed Inbound | Mars Expedition 3 | 2059-05-04 08:00:00+08:00 | 2059-07-06 08:00:00+08:00 | Transfer | Sun | Uncrewed Inbound for TH-02. Mars Expedition 3 Crew remaining on Mars | |
| 213 | XH-02 太白 | 2ae7438b-a2a2-44ee-a084-a76bc1e94114 | state | Maintenance | 2059-07-06 08:00:00+08:00 | 2059-08-04 08:00:00+08:00 | Maintenance | Star Port | Timeline.xlsx inferred monthly phase. Raw: Maintenance | ||
| 214 | XH-02 太白 | fcb05995-823e-4a63-9cf8-44ea953e2e9a | state | ME-4 Outbound | Mars Expedition 4 | 2059-08-04 08:00:00+08:00 | 2059-10-24 08:00:00+08:00 | Transfer | Sun | Earth-Mars transfer | Carrying Mars Expedition 4 crew and Mars One Expansion Package to Mars |
| 215 | XH-02 太白 | c00366fd-6b1d-46e0-8163-4bd6b510f374 | state | ME-4 Mars Operations Part 1 | Mars Expedition 4 | 2059-10-24 14:00:00+08:00 | 2059-11-04 08:00:00+08:00 | Planetary Operations | Mars | ME-4 Crew to Mars One with Mars One Expansion Package. Mars Expedition 3 ascend. | |
| 216 | XH-02 太白 | 33a45210-3497-4826-ba6e-291b384ebe7e | state | ME-3 Inbound | Mars Expedition 3 | 2059-11-04 08:00:00+08:00 | 2060-01-06 08:00:00+08:00 | Transfer | Sun | Carrying ME-3 Crew home | |
| 217 | XH-02 太白 | 5562aa60-8d62-4ed9-b1cc-51ff99c49d18 | state | Maintenance | 2060-01-06 08:00:00+08:00 | 2060-02-17 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | ||
| 218 | XH-02 太白 | 76cd99ba-c259-4969-a8ae-2fa14e303974 | state | Uncrewed Outbound | Mars Expedition 4 | 2060-01-22 08:00:00+08:00 | 2060-02-27 08:00:00+08:00 | Transfer | Sun | ||
| 219 | XH-02 太白 | c7e777fd-c7d8-4d01-be07-871862829983 | state | ME-4 Mars Operations Part 2 | Mars Expedition 4 | 2060-02-28 08:00:00+08:00 | 2060-10-30 08:00:00+08:00 | Planetary Operations | Mars | Uncrewed Mars mission segment | Timeline.xlsx inferred monthly phase. Raw: Uncrewed to Mars, Mars Expedition 4 Part 2 |
| 220 | XH-03 常曦 | 505255ab-902e-4586-9905-8ecad10353e7 | state | Construction | 2058-02-15 16:00:00+08:00 | 2059-12-09 08:00:00+08:00 | Construction | LEO | XH-03 常曦 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 221 | XH-03 常曦 | b0848762-4f30-45fa-9e5f-5e53a0a7aba3 | state | Assembly Complete | 2059-12-09 08:00:00+08:00 | 2060-01-14 08:00:00+08:00 | Assembly Complete | LEO | Assembly complete, preparing for commissioning | Timeline.xlsx inferred monthly phase. Raw: Assembly Complete | |
| 222 | XH-03 常曦 | b87ea1ef-b240-48f7-aba8-0af7566bd6be | state | Trial Run | 2060-01-14 08:00:00+08:00 | 2060-06-09 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 223 | XH-03 常曦 | bdc91489-7c65-45c2-bd78-4a37edc9dd4e | state | Maintenance | 2060-06-09 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | |||
| 224 | XH-04 | 86055939-185d-476b-afc5-1a60a69a1ccb | state | Construction | 2059-09-16 16:00:00+08:00 | 2061-08-10 08:00:00+08:00 | Construction | LEO | XH-04 Construction | Timeline.xlsx inferred monthly phase. Raw: Construction | |
| 225 | XH-04 | d9b91820-7ea9-4f79-bca6-1fd450862c17 | state | Assembly Complete | 2061-08-10 08:00:00+08:00 | 2061-09-15 08:00:00+08:00 | Assembly Complete | LEO | Assembly complete, preparing for commissioning | Timeline.xlsx inferred monthly phase. Raw: Assembly Complete | |
| 226 | XH-04 | 952a415e-408b-42a4-8dd8-24940e745d65 | state | Trial Run | 2061-09-15 08:00:00+08:00 | 2062-02-10 08:00:00+08:00 | Trial Run | Earth | Trial Run before commissioning | Timeline.xlsx inferred monthly phase. Raw: Trial Run | |
| 227 | XH-04 | 85aa5084-4c7a-4863-8bcc-ee9238d95d2c | state | Maintenance | 2062-02-10 08:00:00+08:00 | Maintenance | LEO | Timeline.xlsx inferred monthly phase. Raw: Maintenance | |||
| 228 | 启明空间站 | 00aec49b-6dc1-4b58-bbf1-96086b93ff0e | state | Expedition 11 | Expedition 11 | 2059-05-04 01:02:00+08:00 | 2059-11-16 20:55:00+08:00 | Standard Rotation | LEO | ||
| 229 | 启明空间站 | 1c346955-ba6b-4f54-9308-d088fa99f766 | state | Expedition 12 | Expedition 12 | 2059-11-16 16:00:00+08:00 | 2060-05-15 01:44:00+08:00 | Standard Rotation | LEO | ||
| 230 | 启明空间站 | 7c74d703-98bc-486d-b06f-591f38661181 | state | Expedition 13 | Expedition 13 | 2060-05-12 15:40:00+08:00 | 2060-11-12 15:40:00+08:00 | Standard Rotation | LEO | ||
| 231 | 启明空间站 | 3c81a7b5-4f86-4f48-aa6f-99dec955dc42 | event | Reconfigure to 启明空间站 | 启明载人航天计划 | 2060-07-06 17:15:00+08:00 | LEO | 准备进行空间站格局调整,利用现有基础设施构建启明空间站 | |||
| 232 | 启明空间站 | 4d14317f-3e78-4e9e-9a9c-a9555ef15b24 | state | 启明空间站重力模块升级 | 启明载人航天计划 | 2060-07-06 20:40:00+08:00 | 2060-09-15 20:55:00+08:00 | 启明空间站重力模块升级 | LEO | 擎天E3发射,运送了全新的节点舱和人工重力模块,由Expedition 13乘组完成安装 |