Mission Ops Prototype Location Board

Location-first Board

按地点分组看每个系统当前都聚集了什么资产

这张板子和 Status Board 是并列关系,不是一个页面里的切换模式。它更适合回答“Earth System 现在有什么、Mars System 现在有什么”。

Simulation Time

2060-03-12 09:00

Grouping is based on current location hierarchy. Status still appears on each card so the operational meaning remains visible.

Location Groups 4
Earth System 3
Mars System 2
Apply Reset
Grouping: Location hierarchy Status preserved on each asset card Supports Station, Port, Surface Site later

Location Group

Earth System

Ports, orbital stations, and near-Earth transfer lanes.

3 Assets

Lingxiao Station

Station

Docked / On Station

Low Kerbin Orbit. Continuous habitation and logistics hub.

Next: Expedition 16 Arrival · 2060-03-30 Current crew handover prep

XH-03 Changxi

Exploration Mothership

At Port

Star Port. Refit phase for Jupiter relay deployment mission.

Next: Rollout Review · 2060-04-12 Bay 4

Amalthea Crew Vehicle 4

Shuttle

In Transit

LKO transfer corridor. Planned crew rotation for Lingxiao Station.

Next: Docking Window · 2060-03-30 10 crew manifest

Location Group

Mars System

Orbital operations and deployed surface infrastructure around Mars.

2 Assets

Mars One Campus Alpha

Surface Outpost

Surface Ops

Primary surface site. Habitat expansion, ISRU staging, and logistics intake point.

Next: Taibai Supply Window · 2060-03-29 Needs truss + greenhouse kit

XH-02 Taibai

Exploration Mothership

In Transit

Mars transfer lane. Support mission inbound for Mars One Campus surface expansion.

Next: Mars Arrival · 2060-03-29 31-day transfer

Location Group

Deep Space / Future Hooks

Reserved for future hierarchy like Jupiter System, relay chains, and transit corridors.

Prototype Placeholder
Location hierarchy will matter Earth, Star Port, Low Kerbin Orbit, Lingxiao Station should eventually form a parent-child location structure.
Facilities are first-class assets Stations, ports, and surface outposts appear here exactly like ships, which is why the model must be Asset-first.